ML20101E301

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for May 1992 for McGuire Nuclear Station,Units 1 & 2
ML20101E301
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 05/31/1992
From: Simmons N, Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20101E282 List:
References
NUDOCS 9206230145
Download: ML20101E301 (10)


Text

,,

~ '

}

['

4 OPERAlfNS DATA nEPORT r

DOCKEI NO 50-369 DATELefe 15. 1992 OPERATINuSTATUS COMPLETED SY R.A. Willises TELEFHONE 704-373-5^87 F

. I. Unit Naset McGuire 1

2. Reporting Period: May 1, 1992-May 31, 1992

- 3. Licensed Thersal Power (Mkt):

3411 i

4. Naseplate Rating (6tscs MWe):

.13054 Notes

  • Nameplate Rating
5. Design Electrical Rating (Net MWe):.

1120

-(Bross MWel calculated as

-6.' Marlaus Dependable Capacity (Gross MWe):

!!71 1450.000 MVA x.90 power

7. Maximus Depetidable Capacity (Net MWe):

1129 fatter per Page iii, s8. If. Changes Occur in Capacity Ratings titees Nueber 3 Through 7) Since Last NUREB-0020.

e deport. Give Reasons:

r~

9. Power Level To Which Restricte1, If Any (Net MWe):
10. Deason For Restrictions, if any:

This Month Yr.-to-Da'te Cusulative ill. Hours in Reportin; Period 744.0 3647.0 92039.0

-12. Number Of Hours Reactor Was Critical 96.2 2191.6 64185.1 13.' Reactor Reserve Shutdown Hours -

--0--

-+-

--0--

(14.HoursGeneratorOn-Line-96.2 2107.4 63468.3-

15. Unit Reserve Shutdown Hours

--0--

--0--

--0--

16. _Stoss Thersal Energy Generated (N9)-

-305612 7164213 194149874

'17. Gross Electrical _ Energy Generated (MWH) 106233 2502147 66661972

18. Net Electrical Energy Generated (MWH1 92074 2397185 63316238
17. Unit Service Factor-12.9 60.0' 69.0

--20. Unit Availability Factor 12.9 60.0 69.0

21. Unit-CapacityFactorL(UsingMDCNet) 11.0 58.0 60.2 1
22. Unit Capacity Factor (Using DER Net) 10.5 55.5 58.8
23. Unit Forced Outage Rate-87.1 40.0 13.8 L 29. Shutdown Seneduled Over Next t. Months (Type, Date, and Duration of Each):

Wone

~

25. If Shut Down At End Of Report Period. Estiaated Cate of Startup:.fune 22 13 2
26. Units in Test Status (Prior to Cossercial Operatien):

Ferecast Achieved INiilAL CRITICAllii INITIAL ELECTRICliy y206230145 920615

~

kDR ADOCK 05000369 CONMERCIAL OPERATION PDR x.

-~

.m_..

p-

-_9,.'

9

'h.

OPERATINSLATAREPORT DOCKET ND 50-369 UNIT McGuire 1 0 ATE hne 15.1992 COMPLETED SY R.A. Williaes-TELEPHONE 704-373-5967 _

04 NTH

~May.'1982

. LAI AVERAEE DAILY F0WER LEVEL ~

D AVERAGE DAILY FOWER LEVEL E

-(MWe-Net)-

(MWe-Wet)

' 1 ---

^1119~

-17 0

2 11't9 '

18 0

' -3L

-1125- 0 4-

890 20_

0-

5-0' 21-0

-6.

-0'-

2E-0

!7 0'

23 0

'B' 0 0 9.

0 25 0

10

-0 26 0

s

-115

'0 27 0

12 z 0'

20 0

13 0'

29

'O Ll4 0

30 0

.15 :

0-31 0

- 16 0-

[:

M..

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKFT NO.

50-369 UNIT NAME M w u i x t.

1 DATE-ve/13/ 92 REPORT. MONTH May 1992 COMPLETED BY N.

C.

51MMUN5

. TELEPHONE (vus)-Juz-dzoa (1) 2)

(4)

(5)

E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P

' DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE' 2

92 5 F

647.85 B

1 CH HTEXCH STEAM GENERATOR INSPECTION OUTAGE h-Forced eason-e',n o d :

xhibit G - Instructions A-Equihment FailureB-Maintenance or test (Explain)

S Scheduled 1 Manual for Preparation of, Data e-Manual Scram Ent y Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (NUEG-Ol61) )

(LER D-Regulatog Restriction 4-Other (Explain)

File E-Operator Training & License Examination F-Administrative (5)

G-Operator Err 9r (Explain)

Exhibit I - Same Source H-Other (Explain)

~... _.. _..

'+'=

l

. 4 :

i DOCKET NO:

50 369

' UNIT:

McGuire 1 DATE:

b/13/92 NARRATIVE

SUMMARY

MONTH: May 1992

-McGuire Unit 1 began the month of May at or near 100% power.

A power reduction was; began at S/4 at 1352 to take the unit off-line.

The unit

- was taken off line at 5/5 0009 for a projected 49 day steam generator

-inspection outage. =The unit ended the month in the steam generator inspection outage.

4 Prepared _by:

N. C. Simmons Telephone:

704-382-5263

MONTHLY REFUELING INFORM M ON REQUEST

1..

Facility name:_McGuire.

Unit 1

'2.

Scheduled next refueling shutdown: March 1993 3.

Scheduled restart following refueling: June 1993 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.

CHANGE OR LICENSE AMENDMENT.

THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereaf ter require a

. technical specification change or other license amendment?

If yes, what will these be?

If no, has reload' design-and core configuration been reviewed by Safety-Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or

supplier, unreviewed design or performance analysis methods, significant changes in design or new operat.ing procedures).

7.

Number of Fuel assemblies (a) in the core: L_1 (b) in the spent fuel pool: #Ja

-8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase:

9.

Projected-date of last refueling which can be accommodated by

.present licensed car'acity: March 2006

-DUKE POWER COMPANY DATE:.

June 15. 1992

.Name of

Contact:

R.

A.

Williams Phone:

704-382-5346

3 7J 1

- OPERATING DATA REPORT-

-a_ c 3

r DOCKET Pn 370 DATE June 15. 1992 OPERATING STATUS COMPLETEDBY R.A. Williaes l'

TELEPHONE 704-373-5987 1".

_l. linit Nase McGuire 2-i fF

=.2. Reporting Periods-May 1,1992-May 31,1992

3. Licerned thereal Power (MWt):-

3411 iQ.Naseplate_ Rating (GrossMWe):

13055 Notes #Naseplate Rating

'5. Deilgn Electrical dating (Net MWe):

'1180 (Bross MWe) calculated as

6. Marlous Dependable Capatity (Gross MWel

!!71 1450.000 MVA :.90 power

7. Maxiste Dependable Doacity (Net MWels 1129 factor per Page 111,
8. I' Changes Occur.in_ Cap city Ratings lltess Nuaber 3 Through 71 Since Last NUREG ^020.

E '.< port. Give Reasons

/

~

5. Power Level To Which Restrit.ed, if Any (Net MWe):
10. Reason For Restrictions, if any: -

This Month Yr.-loiate Cusulative ll.' Hoers In Reporting Period. _.

744.0 3447.0 72335.0

12. Nusher Of Hours Reactor Was Critical 477.0 1762.0 54963.5

-13. Reactor Reserve Shutdein Hours

--0--

--0--

--0--

214? Hours Secerator On-line:

477.0 1711.7 54064.6

-15,UnitReserYeShutdownHours

--0--

--0--

--0--

16.;6 toss Thereal Energy Generated _(MWHl..

1624048-5421005 176437435

17.GrossElectricalEnergyGenerated(MWHi--

549476 1905572 61736487 U

18." Wet Electrical Energy Generated (MWHl.

54t947 1805292 59185703

192UnitServiceFactor_._

64.I' 46.9 74.7 20.UnitArallabilityFattor-64.1 46.9 74.7 EliUnitCapacityFactor(UsingMDCNet) 64.5 43.B 71.4

22.:UnitCapacity_ Factor (UsingDERNet) 61.7

=42.0 69.4 L 23. Unit Forced Dutage Rate '

9.1 -

6.5 8.0

! 24.-Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each)1 -

-None 325.llf Shut Ecun At End of Report Period. Estimated Date of Startup July 11. 1992 126.' Units In Test Status (Prior to"Costercial Operation):

Forecast Achieved INITIALCRITICal.lTY

~ INITIALELECTRICITY CO VERCIAL OPERATION

.u.

, - - ~ -

~

3,-

f' 1_, ::

i t

f

.OPERATINS DATA P.ff0RT_

DOCKET NO 50-370

!! NIT Mc6ulte 2 DATE June 15. 1992-E COMPLETED BY R,A, Willians TELEPHONE 704-373-5997

.00 NTH

'Mai/1h92 f

~

lVERA6E ' DAILY P0 lier LEVEL DJJ AVERASE DA!LY POWER LEVEL-

,/

RAl '

'(MWe-Net)_

(MWe-Net)

- tf D2 1:

'!!55 17

'1152 (M

2' 1154 10 1152 3 i

'1155--

19 1147 4:

' 1151-'

26 996 5

= 1146 -

-21~

0 i

6'

' 1147 '

22 0'

s O4 23 -

0 4

gpg.

6-11 %

24 0

[9

!!45' 25 0

110 '-

~1145

~ 26 0

-11.

I166-- -

27 0

x 12 i

'1:0?

28 0-

i3

-1153 -0

-!!4 ;

1153

. 30 -

0

.. -1153 -

-31

__ _ 0 -

16 1152.

u E.':

e.

I-UNIT SHUTDOWNS'AND POWER REDUCTIONS DOCKET NO.

50-370'

~

UNIT NAME Mwulat; z DATE v6/1d/92-REPORT MONTH.

May 1992 COMPLETED BY N.

c. 51MMUN5 TELEPHONE t/us)-JUZ-dZb3 (1) 2)

(4)

(5)

~

E HOD T

A OF LICENSE M

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE' O

P DURATION O

DOWN REPCRT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 9

92-5-20 F

48.00 A

3 HH VALVEX REACTOR / TURBINE TRIP DUE TO A FAILED FUSE RESULTING IN A REGULATING VALVE CLOSING 10 92-5-22 S

218.97 B

CH HTEXCH STEAM GENERATOR INSPECTION OUTAGE (1)

(2)

(3)

(4)

F Forced Reason:

Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maincenance or test 2-Manual Scram EntW Sneets For Licensee C-Refueling 3-Automatic Scram Eyent Report (NUEG-0161) )

(LER D-Regulatory Restriction 4-Other (Explain)

File E-Operator Training & License Examination F-Administrative (5)

G-Operator Errgr (Explain)

Exhibit I - Same Source H-Other (Explain) s

. ~---

S..

.j+

4 u-_

UNIT: McGuire 2 DATE:

6/13/92 NARRATIVE.

SUMMARY

. MONTH: May 1992' McGuire Unit-2 began the month of May operating at 100% full pows.

At 2102 on 5/20' the unit automatically tripped due to a failed fuse li

.resu t ng in.alregulating valve failing closed. The unit remained off line to start the schedule 44 day steam generator inspection outage.

The init ended the month in the steam generator inspection outage.

C I

Prepared by:

N. C. Simmons

- Telephone:

704-382-5263 l :-

l a--.

b MONTHLY REFUELING INFORMATION REOUESI 1.

Facility name: McGuire.

Unit 2

-2.

Scheduled next refueling shutd'own: June 1993

~3.

Scheduled restart'following refueling:_Spatember 1993 THE PROJECT MANAGER MAS BEEN ADVIGED BY SEPARATE COMMUNICATION OF ANY. T. S.

CHANGE OR LICENSE AMENDMENT.

THEREFORE, QUESTIONS 4

'IHROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change er other license amandment?

If_ycs, what-will thet,e be?

If no, has_ reload design and core configuration been reviewed by Safety Review Commi' tee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting propos licensing action and supporting information.

6.

Impertant licansing. considerations (new or dif ferent design or

supplier, unr. viewed design or performance analysis nethods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuel pool: 2n 8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase:

-9.

Projected date of last refueling which can be accommodated by present licensed capacity: December 2003

-DUKE POWER. COMPANY DATE:

June 15. 1992 Name of

Contact:

R.

A.

Williams Phone:

704-382-5364 i

I