i.
m=T.Ei C
Log # TXX-92286 L
J File # 10010.2
?
3 Ref.
- 10CFR50,36 1UELECTRIC June 15. 1992 William J. Cahill. Jr.
- Omv Vice Pmident Director Office of Resource Managemeni U. S. Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) - UNIT 1 DOCKET No. 50-445 MONTHLY OPERATING REPORT FOR HAY 1992 Gentlemen:
Attached is the Monthly Operating Report for Hay 1992 prepared and submitted pursuant to Specification 6.9.1.5 of Appendix A (Technical Speci fications) to l
the Comanche Peak Unit 1 Steam Electric Station Operating License, NPF-87.
Sincerely, I
William J. Cahill, Jr.
By:
D. R. Woodlan Docket Licensing Manager JLR/grp Attachment c - Mr. R. D. Hartin, Region IV Mr. T. Reis, Region IV Resident Inspectors, CPSES (2)
Mr. T. A. Bergman, NRR Document Control Desk
\\
1 1
9206230198 920531
./ i PDR ADOCK 05000445 1,, U i
R PDR 400 N. Olive Street LB. 81 Dallas, Te<.w 75201 s
Lu
11.
Attachment to TXX. 92286 Pn0e 1 of 4 -
COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCKETNO.
50 44S UIC':
CPSES1
[MTE:
June 15.1992 COMPLETED BY:
Glenn Davis TELEPHONE:
817 897 5277 OPERATING STATUS 1.
- Reporting Period: MAY 1992 Gross hours in reporting period:
7J3 2,
Currently authorized power level (MWI):
21u Mar. depend, capacity (MWe Net): n5,2
- Design Electrical Rating (MWe Net):
115.0 3.
Power level to which restricted (if any) (MWe. Net):
No.na 4.
Reasons for restriction (if any):
THIS MONTH YRTODATE CUMULATIVE 5.
. Number of hours reactor was critical 719.4 3601,6 12016.8 6.
Reactor reserve shutdown hours 0
20.8 2003.3 7.
Hours generator on line 715 3574.1 11783.3 8.
Unit reserve shutdown hours 0
o o
9.
Gross thermal energy generated (MWH) 2,368,550 11.117,158 36,449,152
- 10. ; Gross elec : cal energy generated (MWH) 794,804 3,708,329 12,045,327 11, Net electrica! ener0y generated (MWH) 759,931 3,546,482 11,442,046 12, Reactor Servtce factor 96.7 98.8 76.1
- 13. Reacter availability factor 96.7 99.3 88.8
- 14. - Un}t servic? factor 96.1 98.0 74.7 16.
Unit Gyallability factor 96.1 98.0 74.7
- 16. Unit capacity factor (Using MDC) 88.8 84.6 63.0
- 17. Unit capacity factor (Using Design MWe) 88.8 84.e 83.0 18.
Unit forced outage rate 3.9 2.0 8.4 19.
Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):
Refueling Outage 2 scheduled to begin October 1,1992, with a duration of 70 days.
- 20. Il shutdown at end of report period, estimated date of startup:
- 21. Units in test status (ptbr to commercial operation):
ACHIEVED Commercial Operation 900813 l
f L
Estimated i;
E
9A i
AttachmenttoTXX 92286 Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL DOCKETto.
50 445-UNIT:
CPSES1 DATE:
June 15,1992 CCMPLETED BY:
Glenn Davis TELEPHONE:
817 897 5277 MONTH: MAY 1992 CAY AVERAGE DAILY POWER LEVEL CAY AVERAGE DAILY POWER LEVEL (MWe Net)
- (MWe Not) 1 1096 17 1097 2
1096 18 1098 3
1095 19 1097 4
1096 20 1099 5-1094 21 1097 6
1096 22 1093
-7' 1097 23 980 8
1057 24 1094 1
-9 0
25 1093 10' 276 26 1095 11 934-27 1095 12 1092 28 1094
- 13.-
1095 29 1093
- 14
- 1091 30 1092 15_
1089 31 1091-L16 1091 f
1*
m'-
.P.et-g-
f w e-e rw--
m4%
e a
e a-'
-h-vM' 7-NF"----9'-*'tv-T'*Myt*w'mwf*w-wa-v.
T e rw-W e--=r?-w *r T 9 4c*
--N-'
s
-..-..~
.T p"
'.n
^ Attachment to TXX. 92286
- Pape 3 of 4 -
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKETNO:
60 445 UNIT:
CPSES 1 DATE:
June 15,1992 COMPLETED B(:
Glenn Davis-TELEPHONE!
817 897 6277 MONTH: MAY 1992 05/01 0000 Unit staned the month in ucoE 1, with the reactor operating at approximately 100 percent of -
rated thermal power.
L 05/08 2309'-
Reactor trip caused by personnel error when performing channel calibration surveillance
- testin0 on the Loop IV tJ 18 Power Mon tor Module. LER 92 009 to follow,
'05/09
-2268-Unit entered uoOE 2. reactor stadup initiated 05/31 2400 Unit ended the month in uo0E 1, with the reactor operating at approximately 100 percent of L
g rated thermalpower.
(.-
1 T
L...
I l-s.
,-..,,.~-....-...--,-,..y-.
,y_
m,,~.
.._,--.,-.-,mm-
.m.
r Atachment to TXX-. 92286 ',
Page 4 of 4 r-UNIT SHUTDOWNS AND POWER REDUCHONS j
DOCMETNO-50-445 UPET:-
CPSES 1 OATE:
June 15.'1992 COhPLETED BY:
Glenn Dav s TEEPHOPE; 817-897-5277 l'
5.*ETHOD & -
TYPE SHUTTING DOWN Ff0RCED DURATE)N THEEACTOROR M1 CATE SSCHEDt a m (HOURS)
EASCN REDUCNG POWER CORRECB E A M N US 6
920508 F
29 G
3 Reador trip caused by persorrel enor dunty i
calt;rahonof recleari,ststredater See i
previous page. LER 9229 tc topow.
i t
))
EASCN
- 2) nETHOD A-EOUIPMENT FAILURE (EXPUUN)