ML20101E421

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1992 for Jm Farley Unit 1.W/
ML20101E421
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/31/1992
From: Hill R, Woodard J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9206230194
Download: ML20101E421 (5)


Text

r --

3

~ **

Sxthern Nucleat Operahng Cynpany Pont O'hce Don 1795 hirmingtum, Alatama 35201 itlephono PO$ (TCR LOM L

Southern Nudear Operating Company

s. n. wooma ENeIEN June 15,1992

" '" *" " "" " *1"'m2 " "

Docket No. 50-348 U. S. Nuc1 car Regulatory Commission ATTN:

Document Control Desk Washington, D. C.

20555 Joseph M. Farley Nuclear Plant t

l Unit 1 Monthly Doeratina Data Report Gentlemen:

Attached is the May 1992 Monthly 0)erating Report for Joseph M. Farley Nuclear Plant Unit 1, as required ay Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, N

Nhd rd

(_J.d Woodard AEJ:edb3014 Attachments cc: Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. f. Maxwell I

9206230194 920531 f[f4 I

l PDR ADOCK 05000348 j)

R PDR

\\

1 JOSEPil M. FARLEY NUClf.AR Pl. ANT UNIT 1 NARP.4TIVE

SUMMARY

OP OPERATIONS May, 1992 i

There vere no unit shutdowns or major power reductions during the month of Hay.

The following major safety-related snaintenance was performed during the month of Hay

1. Miscellaneous corrective and preventive maintenance was performed on the diesel generators.

l l

l l

-- +--

OPERATING DATA REPORT DOCKET NO. 50-348 DATE June 8, 1992 COMPLETED BY R. D. Hill TELEPHONE (205)879-5156 i

OPERATING STATUS Notes

1. Unit Name Joseph H. Farley - Unit 1
1) Cumulative data since
2. Reporting Periods Hay 1992 12-1-77, date of
3. Licensed Thermal Power (HVt):
4. Nameplate Rating (Gross MVe): _

2,652 commercial operation.

860

5. Design Electrical Rating (Net HVe):

829

6. Maximum Dependable capacity (Gross HVe):

855.7

7. Maximum Dependable Capacity (Net MVe):

812.0

8. If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted, If Any (Net MVe):

N//i

10. Reasons For Restrictions, If Any N/A l

This Month Yr-to-Date Cumulative

11. Hours In hapor. ting Period 744.0 3,647.0 127,103.0
12. Number Of Hours Reactor Vas Critical 744.0 3,647.0 99,557.9
13. Reactor Reserve-Shutdovn Hours 0.0 0.0 3,650.0
14. Hours Generator On-Line 744.0 3,647.0 97,911.3
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (HVH) 1,971,974.2 9,620,033.0 751,024,657.1
17. Gross Electrical Energy Generated (HVH) 634,616.0 3,120,580.0 80,905,342.0
18. Net Electrical Energy Generated (HVH) 602,624.0

~2,962,864.0 76,377,662.0

19. Unit Service Factor-100.0 100.0 77.0
20. Unit Availability Factcr 100.0 100.0 77.0
21. Unit Capacity Factor (Using HDC Net) 99.8 100.1 74.3
22. Unit Capacity Factor (Using DER Net) 97.7 98.0 72.5
23. Unit Forced Outage Rate 0.0 0.0_

6.9

24. Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration of Each):

Refueling /Haintenance Outage, September 25, 1992, approximately 60 days.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

26. Ifnits In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77

,12/01/77 Form 2/34 i

1

=

F-'.,;

[.**

a DOCKET NO.

50-348 UNIT 1

DATE June 8, 1992 COMPLETED BY R. D. 11111 TELEPHONE (205)899-5156 i

MONTH Hay f-DAY AVERAGE DAILY POVER LEVEL DAY AVERAGE DAILY POVER LEVEL (MVe-Net)

(HVe-Net) 1 814 17 806 2

813 18 808 3

808 19 807 4

816 20 806 5

814 21 809 6

817 22 811 7

818 23 814 8

804 24 812 9

812 25 805

-10 815 26~

808 11 814 27 809 12:

814 28 807 13 810 29 806 14 809 30 804

-15 806 31 811 16

-805 INSTRUCTIONS On this format, list the average daily unit power level in MVe-Net for each day in the reporting month.

Compute to the nearest whole megavatt.

j 12 TIT SNUTD0letS AND POWER REDUCTIGES toCIET 50 54-349 f

'JitIT NME J. M. FARIJ:T - INrIT 1 j

DATE Jtste 8,'1992 1:ZrTtKTED BT R._ D. RIII REPCET POEf:H PtAT TELEFig3E (205pSte-5156 i

I

'i

.I i

i ser== or

.iLIcE=sEE I I

i c msE coa ncrrrE I

i i

l ocurI= 1 I snurrt=

i

. w rI = to I

im.

Irm IrrFE I (munsi i meas =2 gtc

,,7,,,3 1,,Emrr i srsTm I, awa=Nr 2

, cc,4. cc,s

,,,,,,co,,,o g

] There were no unit shutdem or' major power reductions asring the month of May.

l l

l 1

'l 1

1 i

i l

I I

i i

l i

i l

i i

i I

.I I

I I

I 1

.I i

1.

I I

I I

I I

I I

I I

I i

1 1

I I

I I

i 1

1 1

1 I

I I

I i

I I

i l

I I

I I

I I

i 1.

1 I

I I

i i

I I

I I

I I

i i

l i

l i

i i

1 I

I i

i i

l I

i l

i l

i I

i 1

I I

i l

i i

i i

i i

l i

I I

i I

i i

i l

i i

I I

1 i

i i

I i

l i

i i

i I

I I

i i

i I

I I

I 1

I i

i I

I I

I I

I I

I I

I I

I I

I I

I I

i l

I I

I l

6 I

I I

I

.I I

I I

I I

I i

i l

I I

I I

I I

I I

I I

I I

I I

i 1

I i

i i

i i

I i

I i

i l

I i

i i

i i

l i

i l

l I

i l

i I

i i

i i

i l

i l

I i

i i

i i

i l

i I

i i

i i

i I

F: Forced Reason:

Method:

Exhibit G-Instructions S: Scheduled A-F.quipment Failure (Emplain) 1-Manual for Preparation of Data B-Maintenance or Test 2-etanual Scram.

Entry sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (IJ3t) File (NUEEG-D-Regulatory Restriction

( h r (Explain) 0161)

E-qwsrator Training s License Examination F-Administrative Exhibit I -Same Sottree G-operstaanal Error (Explain)

(9/77)

H e r (Explaint w

n