Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20102C138 + (08:41:42, 13 December 2024)
- ML20102C135 + (08:41:43, 13 December 2024)
- ST-HL-AE-1188, Forwards Response to NRC Question 620.02N Re Detailed Control Room Design Review.Answers to Items H,I & K Will Be Provided by 850415 + (08:41:44, 13 December 2024)
- SNRC-1152, Extends Invitation for NRC to Observe Tabletop Exercise of Transition Plan,In Preparation for Graded Exercise of Offsite Emergency Plan.Tabletop Exercise Scheduled for Early Mar 1985 + (08:41:45, 13 December 2024)
- BSEP-85-0346, Forwards Rev 17 to Emergency Response Plan & Revs to Plant Emergency Procedures Listed on Attachment + (08:41:46, 13 December 2024)
- ML20102C123 + (08:41:46, 13 December 2024)
- ML20102C118 + (08:41:47, 13 December 2024)
- ML20102C116 + (08:41:48, 13 December 2024)
- ML20102C112 + (08:41:49, 13 December 2024)
- ML20102C108 + (08:41:50, 13 December 2024)
- ML20102C104 + (08:41:51, 13 December 2024)
- 0CAN028503, Provides Overview of Proposed Interim Low Level Radwaste Storage Bldg.Bldg Will Be Constructed & Operated in Compliance W/Generic Ltr 81-38.No Tech Spec Changes Will Be Required + (08:41:52, 13 December 2024)
- 05000387/LER-1984-047, Forwards LER 84-047-00,originally Issued on 841130.LER Reissued Due to Apparent Distribution Problems + (08:41:53, 13 December 2024)
- ML20102C087 + (08:41:54, 13 December 2024)
- 3F1184-19, Responds to Deviation Noted in Insp Rept 50-302/84-26. Corrective Actions:Computer Point Deleted from Calibr Procedure SP-113 & Point Added to SP-112.Point Deleted from SP-113 Will Be Added to SP-112 by 841231 + (08:41:55, 13 December 2024)
- ML20102C075 + (08:41:55, 13 December 2024)
- ML20102C072 + (08:41:56, 13 December 2024)
- 3F0185-16, Suppls Response to NRC Re Deviation Noted in Insp Rept 50-302/84-26.Corrective Actions:Calibr Procedures SP-112 & SP-113 Revised in May to Add Computer Points R-713 & P-714,respectively,to Ensure Calibr + (08:41:57, 13 December 2024)
- AECM-85-0010, Responds to NRC Re Violations Noted in Insp Rept 50-416/84-45.Corrective Actions:Responsibility for Development & Implementation of Fire Protection Training Program Delegated to Fire Protection Coordinator + (08:41:58, 13 December 2024)
- AECM-85-0008, Responds to NRC Re Violations Noted in Insp Rept 50-416/84-49.Corrective Actions:Fire Watch Established & Plant Administrative Procedure 01-S-03-3 Re Matl Nonconformance Repts Revised + (08:41:58, 13 December 2024)
- ML20102C040 + (08:41:59, 13 December 2024)
- ML20102C036 + (08:42:00, 13 December 2024)
- RBG-20140, Final Deficiency Rept DR-243 Re Installation of Pacific Scientific Supplied Snubbers & Associated Bergen Paterson Supplied Clamps.Initially Reported on 850109.Addl Insp of Other Snubber Parts Supplied by Vendor in Progress + (08:42:08, 13 December 2024)
- ML20102C005 + (08:42:08, 13 December 2024)
- ML20102C000 + (08:42:09, 13 December 2024)
- ML20102B983 + (08:42:10, 13 December 2024)
- ML20102B973 + (08:42:11, 13 December 2024)
- ML20102B966 + (08:42:11, 13 December 2024)
- ML20102B963 + (08:42:12, 13 December 2024)
- RBG-20146, Interim Deficiency Rept DR-184 Re Shop Weld on Bf Shaw Co Support Trunnion.Next Rept Will Be Provided by 850314 + (08:42:13, 13 December 2024)
- ML20102B955 + (08:42:21, 13 December 2024)
- ML20102B953 + (08:42:29, 13 December 2024)
- ML20102B948 + (08:42:51, 13 December 2024)
- ML20102B944 + (08:42:58, 13 December 2024)
- ML20102B938 + (08:43:07, 13 December 2024)
- RBG-20147, Interim Deficiency Rept DR-261 Re Ite Rowan Auxiliary Relays (J14 Series).Next Rept Will Be Submitted by 850313 + (08:43:16, 13 December 2024)
- ML20102B926 + (08:43:17, 13 December 2024)
- ML20102B924 + (08:43:17, 13 December 2024)
- 3F0185-24, Responds to NRC Re Violations Noted in Insp Rept 50-302/84-30.Corrective Actions:Personnel Instructed in Proper Use of Special Conditions Surveillance Plan SP-442 & Technicians Counseled + (08:43:25, 13 December 2024)
- ML20102B892 + (08:43:37, 13 December 2024)
- 3F0285-25, Forwards Rev 4 to Pump & Valve Program Re Insp of Check Valves in Diesel Generator Cooling Water Sys,In Response to IE Bulletin 83-03 + (08:43:38, 13 December 2024)
- ML20102B889 + (08:43:38, 13 December 2024)
- ML20102B884 + (08:43:39, 13 December 2024)
- ML20102B882 + (08:43:40, 13 December 2024)
- ML20102B876 + (08:43:41, 13 December 2024)
- ML20102B879 + (08:43:41, 13 December 2024)
- 1CAN028506, Updates Status of SER Open Items GL-4 & GL-2 Re TMI Action Item II.E.1.1.Open Item GL-4 Resolved.Manual Suction Valves Will Be Installed in Suction Line from New Condensate Storage Tank to Emergency Feedwater Sys + (08:43:42, 13 December 2024)
- ML20102B867 + (08:43:43, 13 December 2024)
- ML20102B865 + (08:43:44, 13 December 2024)
- 1CAN028507, Forwards Updated Second 10-Yr Pump & Valve Inservice Testing Program, for Review & Approval.Relief Requested from ASME Code Requirements for Impractical Testing. Alternate Testing Methods Proposed + (08:43:45, 13 December 2024)
- ML20102B863 + (08:43:45, 13 December 2024)
- RBG-19881, Responds to NRC Re Violations Noted in Insp Rept 50-458/84-32.Corrective Actions:Procedures Reviewed & Discrepancies Re Use & Accuracy of Laters Pages Corrected by Temporary Change Notices + (08:43:46, 13 December 2024)