ML20102C040
| ML20102C040 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 01/21/1985 |
| From: | Williams J FLORIDA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20102C038 | List: |
| References | |
| L-85-25, NUDOCS 8503050144 | |
| Download: ML20102C040 (1) | |
Text
Doum,g %M SAFEQUARDS INFORMATith FLORIDA POWER &
HT COMPANY c_.
.c January 21,198EC L-85-25 L
E.M s
z k$
o euo c.o a
Mr. James P. O'Reilly o hi f'
Regional Administrator, Region II cs U. S. Nuclear Regulatory Commission M
P. O. Box 2203 Atlanta, Georgia 30301
Dear Mr. O'Reilly:
Re: Turkty Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Inspection Report 250-84-38 and 251-84-39 Florida Power & Light Company has reviewed the subject inspection report and a rosponse is attached.
The enclosed infonnation contains Safeguards Information relating to the Turkey Point Plant Security Plan.
Pursuant to the requirements of 10 CFR 2.790(d) and 10 CFR 73.21, we request that the enclosure to this correspondence be withheld from public disclosure.
Very truly yours, J. W. Williams, Jr.
Group Vice President Nuclear Energy JWW/SAV/js Enclosure cc: Harold F. Reis, Esquire PNS-LI-85-027-1 8503050144 050130 DR ADOCK 0500 50 dNCLOSURE CONTAINS SAFEGUARDS INFORMATION. UPON SEPARATION, THIS PAGE IS DICONTROLLED.
SAFECilARDS INFOREM PEOPLE.. SERVING PEOPLE