Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20111C611 + (06:14:41, 13 December 2024)
- ML20111C606 + (06:14:41, 13 December 2024)
- ML20111C602 + (06:14:42, 13 December 2024)
- ML20111C600 + (06:14:42, 13 December 2024)
- 05000325/LER-1996-005-02, :on 960410,six Chlorine Sensors Failed to Meet Response Time Requirements.Caused by Decreased Sensor Sensitivity.Failed Sensors Replaced by 960411 + (06:14:44, 13 December 2024)
- ML20111C594 + (06:14:45, 13 December 2024)
- ML20111C588 + (06:14:46, 13 December 2024)
- 05000346/LER-1985-001, :on 850109,determined That Atmospheric Vent Valve Test Scheduling Deficient.Caused by Problem in Surveillance Test Program.Atmospheric Vent Valve ICS 11A Had Not Been Tested from 770915-801005 + (06:14:47, 13 December 2024)
- ML20111C578 + (06:14:49, 13 December 2024)
- ML20111C580 + (06:14:49, 13 December 2024)
- ML20111C571 + (06:14:50, 13 December 2024)
- ML20111C567 + (06:14:51, 13 December 2024)
- ML20111C555 + (06:14:52, 13 December 2024)
- ML20111C559 + (06:14:52, 13 December 2024)
- ML20111C550 + (06:14:53, 13 December 2024)
- RBG-20351, Forwards Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept + (06:14:54, 13 December 2024)
- ML20111C543 + (06:14:55, 13 December 2024)
- ML20111C540 + (06:14:59, 13 December 2024)
- 05000316/LER-1985-006-01, :on 850204,8-inch by 16-inch Opening Found in Wall in Quadrant 1 of Reactor Cable Tunnel,Constituting Inoperable Fire Barrier.Opening Believed to Have Existed Since Initial Plant Const.Opening Repaired + (06:15:01, 13 December 2024)
- 05000374/LER-1985-007-02, :on 850205,high Pressure Core Spray Injection Valve Closure Switches 2B21-N100A & B Found Out of Tolerance Range in Nonconservative Direction.Apparently Caused by Instrument Drift + (06:15:03, 13 December 2024)
- 05000327/LER-1984-075, :on 841201,hourly Fire Watch Route C Not Performed as Required by Tech Spec 3.7.12.Replacement for Personnel Normally on Fire Watch Route C Did Not Show Up for Work.Fire Watch C Reestablished + (06:15:05, 13 December 2024)
- ML20111C503 + (06:15:07, 13 December 2024)
- ML20111C508 + (06:15:07, 13 December 2024)
- ML20111C496 + (06:15:11, 13 December 2024)
- ML20111C493 + (06:15:12, 13 December 2024)
- 05000346/LER-1984-016, :on 841120,operability of Emergency Ventilation Sys (Evs) Servicing Spent Fuel Pool Storage Area Not Formally Verified.Caused by Computerized Test Schedule Not Identifying Satisfaction W/Tech Specs + (06:15:13, 13 December 2024)
- ML20111C475 + (06:15:15, 13 December 2024)
- ML20111C478 + (06:15:15, 13 December 2024)
- ML20111C467 + (06:15:16, 13 December 2024)
- ML20111C461 + (06:15:17, 13 December 2024)
- ML20111C453 + (06:15:18, 13 December 2024)
- ML20111C451 + (06:15:18, 13 December 2024)
- ML20111C450 + (06:15:19, 13 December 2024)
- ML20111C449 + (06:15:20, 13 December 2024)
- ML20111C447 + (06:15:20, 13 December 2024)
- ML20111C443 + (06:15:21, 13 December 2024)
- ML20111C431 + (06:15:22, 13 December 2024)
- ML20111C419 + (06:15:23, 13 December 2024)
- ML20111C423 + (06:15:23, 13 December 2024)
- ML20111C417 + (06:15:24, 13 December 2024)
- ML20111C412 + (06:15:24, 13 December 2024)
- NG-85-0833, Forwards Operation Permit Sys Monthly Monitoring Rept, for Jan 1985.Rept Cites Four Violations of NPDES Permit Effluent Limits + (06:15:25, 13 December 2024)
- 05000370/LER-1984-030-01, :on 841126,following 841124 Reactor Trip, Jumpers on Two Lead/Lag Cards Found Not Installed.Caused by Deficient Vendor Drawings & Documents.Adequacy of Current Testing Procedures Checked + (06:15:27, 13 December 2024)
- ML20111C396 + (06:15:28, 13 December 2024)
- ML20111C395 + (06:15:29, 13 December 2024)
- ML20111C391 + (06:15:30, 13 December 2024)
- RBG-20235, Interim Deficiency Rept DR-272 Re Piping,Nozzles & Hangers for Reactor Recirculation Sys.Interim or Final Rept Will Be Provided by 850312 + (06:15:30, 13 December 2024)
- RBG-19-762, Forwards Revised Program Plan for Evaluating & Testing Tdi Div I & II Standby Diesel Generators & Data on Insps & Testing Performed to Date + (06:15:31, 13 December 2024)
- ML20111C373 + (06:15:32, 13 December 2024)
- RBG-20251, Interim Deficiency Rept DR-273 Re Relocation of Four Rosemount Pressure Transmitters.Interim or Final Rept Will Be Provided by 850326 + (06:15:32, 13 December 2024)
- W3P85-0582, Informs That Permanent Emergency Operations Facility Will Be Primary Response Facility for Personnel,Effective 850308. Map Showing Location of Emergency Operations Facility Encl + (06:15:33, 13 December 2024)