Arthur Frank Higley Resume
ML20111C450
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/20/2020
From: Higley A
- No Known Affiliation
To:
NRC/OCM
SECY RAS
References
52-025-ITAAC, ITAAC, RAS 55651
Download: ML20111C450 (3)


Text

Phone (423)842-3200 1169 Ivy Manor Court E-mail kfhigley@gmail.com Hixson TN 37343 Arthur Frank Higley civil engineer Professional Project Manager Inspections, Tests, Analyses and Acceptance Criteria (ITAAC): (October 2016 - July 2017 & Nov 2017 - Jul 2018) Unit 3&4 Vogtle Nuclear Plant Experience ITAAC Project Manager Civil, Mechanical and Protective Coating Identified challenges and risks to resolution to insure successful ITAAC completion.

Maintaining progress reports and interfacing with key personnel internally and externally (contractors) to support ITAAC completion.

Coordinating with industry peers for alignment on ITAAC methodology and issues for assigned ITAAC.

Structural Steel Field Engineer (Aug 2017 - Oct 2017) Vogtle Unit 4 Turbine Island Proficient using Research Council on Structural Connections (RCSC), Construction Site Instructions (CSI) and Nuclear Construction and Startup Procedures (NCSP) as they related to civil construction.

Identified potential non-conformances before installation SNC Oversite Project Manager Hot Functional (Feb 2015 - Aug 2015) WBN U2 Startup Managed the removal of interferences with piping that caused snubber false expansion or contraction readings Coordinated associates inspection and documentation of snubbers and resolved problems Civil / Mechanical Engineer (April 2011 - Jan 2015 and Sep 2015 - Dec 2015) WBN Unit 2 Lead Passive Refurbishment Program Engineer Senior Qualified Civil Engineer to establish the Civil Base line for the WBN Unit 2 Maintenance Rule and to confirm TVAs civil commitments for WBN Unit 2 Operating license.

Lead Passive Civil/Mechanical Engineer responsible for WBN passive equipment and structure to insure the plant meets original design specifications Interpret TVA civil and mechanical drawings to confirm passive installation Inspected piping, structural steel, concrete on U2 buildings including the Shield Building and Containment Vessel for degradation Inspected all historical passive equipment to assure codes and commitments are complete Documented over 800 inspections with civil and mechanical reports that was organized by buildings (civil) and system (mechanical) that were reviewed by the NRC for compliance and degradation Inspections, resolution to degradation and reports were completed on time Wrote and reviewed Work Orders to rectify non-conformances Coordinated random inspections with the NRC and QA Resolved NRC issues to assure regulatory compliance

Used ACI and ASME codes to support reports and WBN commitments Worked with crafts to write Work Orders to prepare and make accessible passive equipment for inspection Building Contractor License (Feb 2008 - Mar 2011) State of Tennessee Built Spec Houses Program Manager (Oct 2004 - Oct 2007) Valley-Wide Facilities Upgraded valley-wide assets which included roads, bridges, structural concrete, switchyards and building upgrades Prioritized projects with sites to upgrade TVAs assets based on financial, environmental, safety, usage, condition of asset, plant outages and site priorities Manager of TVA Investment Recovery (Feb 1999 - Sep 2004) Procurement Managed Hartsville Distribution Center Maximize TVAs return on investment by internal usage of assets Manager System Contracts in Procurement (Mar 1998 - Jan 1999) Procurement Implemented TVAs initial 35 System Contracts Valleywide Project Manager Special Projects for the CFO (Jul 1997 - Mar 1998) Office of Finance Implemented Coal Just-In-Time deliveries that reduced handling and storage cost valleywide Project Manager Control Evaluation in Controller Office (March 1992 - Jul 1997) Office of Finance Evaluated Nuclear projects cost over runs Nuclear Engineering Experience: (June 1976 - March 1992) 16 Years Nuclear Construction 6 Years Field Engineer at Hartsville Nuclear Plant: concrete, steel, sub grade stabilization and resolution to QC non-conformance issues 5 Years Hanger and Instrumentation Field Engineer at WBN & SQN: redesign of hangers, field routed instrumentation lines and completion of documentation to transfer systems to operations 1 Year Weld Task Group: Inspected welds for appropriate paper work, inspections and compliance 2 Years Bellefonte Nuclear Plant Design staff: Coordinated construction and design problems to resolutions 2 Years as a Design Project Control Scheduler Community 1999 TVA Co-Chair of the Knoxville Combined Federal Campaign (CFC)

Service The first time in 12 years the Smokey Mountain CFC was recognized nationally as one of the best in per capita giving.

Education University of Florida Bachelor of Science in Civil Engineering