Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20116B962 + (03:54:06, 13 December 2024)
- 05000277/LER-1992-020, :on 921006,CR Ventilation Sys Transferred to Emergency Ventilation Mode Due to an Instrument Spike in B Main CR Radiator Monitor.Design Work in Progress for Mod.W/ + (03:54:11, 13 December 2024)
- ML20116B953 + (03:54:13, 13 December 2024)
- NSD-NRC-96-4778, Forwards Proprietary NSD-JLH-6114,rev 2 & Nonproprietary Rept NSD-JLH-6136,rev 1 & Application for Withholding. NSD-JLH-6136,rev 1 Withheld + (03:54:14, 13 December 2024)
- 05000265/LER-1992-024-03, :on 920923,discovered That Unit 2 HPCI Fire Protection Sys Inoperable for More than 14 Days.Caused by Partial Implementation of Corrective Action.Fire Protection Sys Outage Revised + (03:54:20, 13 December 2024)
- U-602580, Part 21 Rept Re Itt Barton Hydramotor Actuator Pump Assembly Failed to Develop Hydraulic Pressure During Testing.Caused by Pump Not Being Fitted Properly + (03:54:22, 13 December 2024)
- ML20116B925 + (03:54:23, 13 December 2024)
- ML20116B920 + (03:54:25, 13 December 2024)
- 05000254/LER-1992-025-01, :on 921002,control Room HVAC Toxic Gas Analyzer Declared Inoperable Due to Broken Sample Pump Belt.Belt Replaced & Qis 79-4, Ammonia Analyzer Functional Test Procedure, Revised + (03:54:28, 13 December 2024)
- NRC-85-0055, Final Deficiency & Part 21 Rept NRC-85-0055 Re Gould,Inc Binding Interlocks Which Prevent Low Speed Operation of Fan Coolers.Initially Reported on 850122.Vendor Reworked Interlock Actuators to Improved Design Developed by Gould + (03:54:30, 13 December 2024)
- ML20116B889 + (03:54:32, 13 December 2024)
- ML20116B887 + (03:54:34, 13 December 2024)
- U-602060, Responds to NRC Re Violations Noted in Insp Rept 50-461/92-16.Corrective Actions:Training on Maintaining Questioning Attitude Will Be Provided to Technical Personnel as Part of Technical Continuing Training Program + (03:54:36, 13 December 2024)
- ML20116B878 + (03:54:37, 13 December 2024)
- RBG-43014, Forwards Rev 8 to River Bend Station Operations QA Manual + (03:54:38, 13 December 2024)
- HL-5120, Forwards Rev 14D to FSAR for Ei Hatch Nuclear Plant & Rev 11D to Fire Harzards Analysis & Fire Protection Program for Plant Hatch Units 1 & 2 + (03:54:40, 13 December 2024)
- DCL-96-155, Revised Special Rept SR 95-05:on 950806,EDG 1-2 to Achieve Rated Output Frequency within TS Limits.Caused by Degraded Electronic Governor Performance.Replaced Electronic Governor Motor Operated Potentiometer & Electronic Governor + (03:54:41, 13 December 2024)
- ML20116B852 + (03:54:42, 13 December 2024)
- ML20116B849 + (03:54:44, 13 December 2024)
- ML20116B841 + (03:54:46, 13 December 2024)
- LIC-96-0097, Forwards Revised FC-EPF Forms Index,Page 1 & FC-EPF-33,R1 IAW 10CFR50,App E,Part V & 10CFR50.4(b)(5)(iii).Addl Guidance Was Added to General Instructions Section on Page 1 & Note on Page 2 Was Deleted + (03:54:47, 13 December 2024)
- 05000354/LER-1992-011-02, :on 920925,CR Operators Received Channel a PCIS Actuation Due to Procedural Deficiency.Individual Calibration Procedures Will Be Revised & Instrument Rack Restoration Procedures Will Be Expedited + (03:54:51, 13 December 2024)
- HL-3000, Responds to NRC Re Violations Noted in Insp Rept 50-321/92-21.Corrective Actions:Event That Resulted in Heating of Recirculation Loop Piping & Water in Excess of Procedural Limits Will Be Covered in Next Training Program + (03:54:54, 13 December 2024)
- A00831, Pressure Locking Calculation for Susceptible Safety-Related Movs + (03:54:56, 13 December 2024)
- ML20116B782 + (03:54:58, 13 December 2024)
- ML20116B773 + (03:54:59, 13 December 2024)
- ML20116B766 + (03:55:01, 13 December 2024)
- 05000278/LER-1996-002-03, :on 960624,room Cooler Associated w/3C LPCI Pump Discovered Inoperable.Caused by Inadequate Post Maint Testing.Room Cooler Fan Motor Wiring Corrected.Provided Staff W/Info Re Breaker Configuration Control + (03:55:05, 13 December 2024)
- ML20116B752 + (03:55:06, 13 December 2024)
- ML20116B747 + (03:55:08, 13 December 2024)
- 05000321/LER-1992-024, :on 920930,unit Manually Scrammed Due to High Turbine Vibration.Caused by Component Failure.Pressure Switch Replaced & Design Change Will Be Implemented + (03:55:12, 13 December 2024)
- ML20116B733 + (03:55:14, 13 December 2024)
- ML20116B730 + (03:55:15, 13 December 2024)
- ML20116B726 + (03:55:16, 13 December 2024)
- ML20116B715 + (03:55:18, 13 December 2024)
- ML20116B709 + (03:55:19, 13 December 2024)
- ML20116B705 + (03:55:20, 13 December 2024)
- 05000498/LER-1992-014, :on 920928,containment Ventilation Isolation Occurred Prior to Expected Actuation During Surveillance Test.Caused by Less than Adequate Procedure.Procedures Revised & Setpoint Changed for Unit 1 + (03:55:26, 13 December 2024)
- ML20116B702 + (03:55:28, 13 December 2024)
- NSD-NRC-96-4771, Forwards DOE Supported Advanced Reactor Severe Accident Program Rept Entitled, Lower Head Integrity Under In-Vessel Steam Explosion Loads. Review & Feedback to Westinghouse Requested from NRC + (03:55:30, 13 December 2024)
- ML20116B690 + (03:55:31, 13 December 2024)
- LIC-96-0100, Forwards Rev 10 to COLR + (03:55:32, 13 December 2024)
- HL-5208, Forwards SE Response to Third IST Interval Program Update + (03:55:33, 13 December 2024)
- ML20116B673 + (03:55:35, 13 December 2024)
- ML20116B657 + (03:55:37, 13 December 2024)
- 05000424/LER-1996-005, :on 960515,unqualified Cabling Was Used in Containment Sump Level Transmitters.Caused by Improper Installation of Cabling by Removing Outside Jacketing in Unit 1.Replaced Cabling for Both Transmitters + (03:55:40, 13 December 2024)
- ML20116B648 + (03:55:42, 13 December 2024)
- ML20116B645 + (03:55:44, 13 December 2024)
- 3F0796-19, Provides Boron Precipitation Info Requested by NRC in Ltr + (03:55:45, 13 December 2024)
- ML20116B634 + (03:55:45, 13 December 2024)
- ST-HL-AE-4213, Responds to NRC Re Violations Noted in Insp Repts 50-498/92-07 & 50-499/92-07.Corrective Actions:Nuclear Training Will Revise Procedure That Governs Lesson Plan Development Scheduled to Be Completed by 921231 + (03:55:47, 13 December 2024)