Fifth Interim Deficiency Rept Re Underdesigned Snubber on Main Feedwater Piping in Valve Room B.Initially Reported on 821013.Reanalysis Continuing.Next Rept Expected by 860929
ML20116B702
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 04/15/1985
From: Hufham J
TENNESSEE VALLEY AUTHORITY
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8504260073
Download: ML20116B702 (2)


Text

F S

TENNESSEE VALLEY AUTHORITY Wdh"eshnu^t ISt"reet hower$

April 15, 1p85 BLRD-50438/82-71 a5 /,PR 17 n10 : 2 2 BLRD-50439/82-65 U.S. Nuclear Regulatory Commission Region II

^

Attn:

Dr. J. Nelson Grace, Regiomi Adninistrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303

Dear Dr. Grace:

BELLEPWTE NUCLEAR PLANT INITS 1 AND 2 - WIERDESINED SNUBBER ON MILIN FEEDWILTER PIPING IN VALVE RDOM B - BLRD-50438/82-71, BLRD-50439/82 FIFTH INTERIM REPORT' The subject deficiency was initially reported to NRCAIE Inspector K. Landis on October 13, 1982 in accordance with 10 TR 50.55(e) as NCR BLN B 8214.

This was followed by our interim reports dated November 10, 1982 and February 16 and May 25, 1983, and January 16, 1984.

Enclosed is our fifth interim report. We expect to subnit our next report on x about September 29, 1986.

If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY W. Hufh akr L oensing Regulations Enclosure d

oc (Enclosure):

Mr. Jmes Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Camission Washington, D.C.

20555 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 i

I # " E !!8 & %

Officia; COL PDR b

~,

,g m4

'Q

[' '

s, u

n,

,,\\

9-

/

i i

,s,.

s.,. 3' r.

)

'e

'r. '

.~',, I ENCLOSURE

~

s

(

ev#

, T., y q

y i\\BELLEF0,Nih(NUQEARPLANTUNITS1AND2' N:q.

UNDEhDESIGNED ONUBBER ON M lN FEEDWATER PIPING IN VALVE ROOM B N

'BLRD-50-4$8/8?-71,BLRD-50-439/8265 K

)

i j

NCR BLN CEB 8214

'I +v 10 CFR 50.55(e) t FIFTH INTERIM REPORT g

he

/

7.,

n' 4

1 s

.% Description of Deficiericy 4' t,,'

.s x.

d1 i S s

A snubber on the main feedwater piping in valve room B, shown on u

r isometric drawing 1AWO501-CF-B1 at node 5, is underdesigned. The calculnted loads (analysis problem N4-1CF-B and N4-2CF-B) at node 5 are low, because a snubber Tvighced en a valve operator at node 25

,fh' which apparently added redt'rS15 to the piping. The snubber atInoda N

25 if required, should 'not' provide significent re'atraint to the r

3 4

[s;

.E'~

piping.

s 4

.q A s

CEBreport75-28,5,'))hnamicEarthquakeAnalysisoftheMainSteamValve' h T

\\

Room B and Response Spectra for Attached Equipment," presents the

',4, spectra curves in 2 components (translational and tor'sional). The

') I,

'l piping analyses of the attaphed piping did not consider the torsiona.( y,

~

3 h

components and effects into the floor response speedra. 'The analysys problems affected are:

1r N4-1(2) CF-C, -B,

-H N4-1(2) CR-D, -G N4-1(2) SM-R, -S, -C, and -B N 4-1 ( 2 ) SV-A, -I, -S, -K, -L, -M, and -Q Interim Progress 1

TVA is continuinE with the reanalysis of the problems which are affected by this deficiency.