ML20116B648

From kanterella
Jump to navigation Jump to search
Submits Amend 32 to Physical Security & Contingency Plan, Incorporating Organizational Change & Change to Compensatory Measures for Degraded Vehicle Barrier Sys.Encl Withheld,Per 10CFR73.21
ML20116B648
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/25/1996
From: Woodard J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-0823, LCV-823, NUDOCS 9607300169
Download: ML20116B648 (2)


Text

.

Gac'g a P:4er Crca,

333 P'ec-Om A <e ue A0anta. Geor;; a 3:308 Tseosone 4c4 53s-3ns SAFEGUARDS INFORMATION Mamna Acoress ENCLOSURE CONTAINS SAFEGUARDS INFORMATION foEE*e'$o'*i$5 UPON SEPARATION THIS PAGE IS DECONTROLLED Birmingham. Alabama 35201 Telephone 205 868 5086

a. o. woodard Senior Vice President July 25, 1996 Docket Nos. 50-424 LCV- 0823

~

50-425 l

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 i

VOGTLE ELECTRIC GENERATING PLANT 4

PHYSICAL SECURITY AND CONTINGENCY PLAN I

AMENDMENT NO. 32 Ladies and Gentlemen:

i In accordance with 10 CFR 50.54 (p) and 10 CFR 50.4, Georgia Power Company hereby submits three copies of Amendment 32 to the Vogtle Electric Generating Plant (VEGP)

Unit I and Unit 2 Physical Security and Contingency Plan (the Security Plan). By copy of l

this letter two copies of Amendment 32 are being provided to the NRC Region II office.

This Security Plan amendment incorporates an organizational change and a change to the compensatory measures for a degraded vehicle barrier system. provides the description and justification for the changes, enclosure 2 gives insertion instructions, enclosure 3 contains Amendment 32 pages, and enclosure 4 is the new effective page list for the VEGP Physical Security and Contingency Plan. The information contained in enclosure 3 is safeguards information and should be withheld from public disclosure in accordance with 10 CFR 73.21.

Please contact this office if you have any questions.

1 (

p/

x Sincerely, i

9607300169 960725 PDR ADOCK 05000424 J. D. Woodard F

PDR w

JDW/AFS Enclosures and xc: (next page)

SAFEGUARDS INFORMMION SAFEGUARDS INFORMATION ENCLOSURE CONTAINS SAFEGUARDS INFORMATION mane %

M-%

UPON SEPARATION THIS PAGE IS DECONTROLLED

_gQ g_ gg y

5 SAFEGUARDS INFORMATION Georgia Power L ENCLOSURE CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED U. S. Nuclear Regulatory Commission LCV- 0823 Page 2 of 2

Enclosures:

1. Justification for Changes
2. Insertion Instructions
3. Security Plan - Amendment 32
4. Effective Page List xc:

Southern Nuclear Operating Company Mr. B. R. Quick (w)

Georgia Power Company Mr. J. B. Beasley (w/o)

Mr. M. Sheibani (w/o)

U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator (w/2 copies)

Mr. L. L. Wheeler, Licensing Project Manager, NRR (w/o)

Mr. C. R. Ogle, Senior Resident Inspector, Vogtle (w/o)

SAFEGUARDSINFORMATION ENCLOSURE CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED