Special Rept 92-08:on 920929,Turbine Building High Radiation Noble Gas Monitor Declared Inoperable for Greater than Seven Days.Alternate Testing Performed Throughout Period of Inoperability
ML20116B752
Person / Time
Site: Oyster Creek
Issue date: 10/27/1992
From: J. J. Barton
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
92-08, 92-8, C321-92-2291, NUDOCS 9211030029
Download: ML20116B752 (2)


Text

--

- ~. ~., - _ - ~. -

.. - - _ - -. - ~....

_ - -.. - --.,.... -. -. _. ~.. _

i i

~

i GPU Nuclear Corporatlod tir a Nuclear

= t r >**

Fof 6ed River, New Jorsey 087310088 609 971 4000 Wrrter's Dwct D!al Numl>cn October 27, 1992 C321-92 2391 U.

S.

11uclear Regulatory Comminaion Att:

Document Control Doch Washington, DC 20555

(

Daar Sir:

Subject:

Oynter Creek Nuclear Generating Station Docket !Jo. 50-219 Snecial Report 92-08 Attach % in Special Repcrt 92-08.

Thio report is being submitted au requirc:1 by Technical Specification 3. 1 3. 11. 2.

i If there ero any questions please contact Mr.

John Rogers at l

609.971.4893

(

f e_

/-

L y

/

7' I

John Barton L

ice presid-t and Director l

Oyster Crock JJB/JJR Attachment ec:

Administrator, Region 1 Senior Resident inspector Oyster Creek NRC Project Manager fA K

J Il

)

S GPU Nucicar Corpc ton is a subscary of General Putyic Utities Corporation

3 e

a OYSTER CREEK NUCLEAR GENERATING STATION i

DROEiftl RitDQEt I

it2-00 Report Daini october 27, 1992 Dnke of QEgn M Rgei September 29, 1992 hlRilid fiGat10 A S L_QGEllfl E11GRi The Turbine 13u ilding high radiation noble gas monitor was-inoperable f or a period of time greator than seven days.

This condition requires a Special Report to be submitted per Technical Lpecification 3.13.H.2.

f:

DJMEdEL.19n._qf Ocpurrongp1 The Turbino 13uilding Radioactive Cascous Effluent Monitoring System (RAGEMS), which incorporatco the noble gas monitor, was removed from service on September 22, 1992 to perform a minor l_

modifIcatlon.

The modification was scheduled to be completed in five days.

Sevoral unanticipated delays woro encountered, and the seven day deadline was exceeded on September 29,_1992.

The modification was complete on October 6,

1992.

_ Final-acceptance testing for the modification was completod, and the.

RAGEMS mqnitors were declared operable and returned to service on-October 7, 1992.

Technical Specitication Table 3.15.2, item-3.a, defittes tho.-

Limiting condition for operation for periods when the Turbine Building Radioactive noble gas monitor is out of service.

Per

- that specification, effluent rolcases - via -this pathway may continue proviNd that a grab sample is-obtained once.per 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> and is analyzed for gross radioactivity within 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s-of sampling.

The required alternate testing ns per f orracd throughout the period-of inoperability, t