ML20116B752
| ML20116B752 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 10/27/1992 |
| From: | J. J. Barton GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 92-08, 92-8, C321-92-2291, NUDOCS 9211030029 | |
| Download: ML20116B752 (2) | |
Text
--
- ~. ~., - _ - ~. -
.. - - _ - -. - ~....
_ - -.. - --.,.... -. -. _. ~.. _
i i
~
i GPU Nuclear Corporatlod tir a Nuclear
= t r >**
Fof 6ed River, New Jorsey 087310088 609 971 4000 Wrrter's Dwct D!al Numl>cn October 27, 1992 C321-92 2391 U.
S.
11uclear Regulatory Comminaion Att:
Document Control Doch Washington, DC 20555
(
Daar Sir:
Subject:
Oynter Creek Nuclear Generating Station Docket !Jo. 50-219 Snecial Report 92-08 Attach % in Special Repcrt 92-08.
Thio report is being submitted au requirc:1 by Technical Specification 3. 1 3. 11. 2.
i If there ero any questions please contact Mr.
John Rogers at l
609.971.4893
(
f e_
/-
L y
/
7' I
John Barton L
ice presid-t and Director l
Oyster Crock JJB/JJR Attachment ec:
Administrator, Region 1 Senior Resident inspector Oyster Creek NRC Project Manager fA K
J Il
)
S GPU Nucicar Corpc ton is a subscary of General Putyic Utities Corporation
3 e
a OYSTER CREEK NUCLEAR GENERATING STATION i
DROEiftl RitDQEt I
it2-00 Report Daini october 27, 1992 Dnke of QEgn M Rgei September 29, 1992 hlRilid fiGat10 A S L_QGEllfl E11GRi The Turbine 13u ilding high radiation noble gas monitor was-inoperable f or a period of time greator than seven days.
This condition requires a Special Report to be submitted per Technical Lpecification 3.13.H.2.
f:
DJMEdEL.19n._qf Ocpurrongp1 The Turbino 13uilding Radioactive Cascous Effluent Monitoring System (RAGEMS), which incorporatco the noble gas monitor, was removed from service on September 22, 1992 to perform a minor l_
modifIcatlon.
The modification was scheduled to be completed in five days.
Sevoral unanticipated delays woro encountered, and the seven day deadline was exceeded on September 29,_1992.
The modification was complete on October 6,
1992.
_ Final-acceptance testing for the modification was completod, and the.
RAGEMS mqnitors were declared operable and returned to service on-October 7, 1992.
Technical Specitication Table 3.15.2, item-3.a, defittes tho.-
Limiting condition for operation for periods when the Turbine Building Radioactive noble gas monitor is out of service.
Per
- that specification, effluent rolcases - via -this pathway may continue proviNd that a grab sample is-obtained once.per 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> and is analyzed for gross radioactivity within 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s-of sampling.
The required alternate testing ns per f orracd throughout the period-of inoperability, t
9-
-.9M
+gm-
--g7--gp p
3 p p n p-~
p_g.--
,,,g-43_
g<--.3 g7, y
y
,y-yQ-w,-..
gig _
%.q_
gg.MW'"+9*'*kP-etWOWwh'a D evW4e-b e 9'hMW"f u-+t' rW re-W*
mardu'-at-Tw
.