7 e

Gimnuinwealth litison Com;uny f

lasalle Generating Station 2601 North 21st ihuti i

%1arseilles,11,61.4 i 1 -9757

.Tri H I 5.457F61 i

___ PRIORITY ROUTING

~

FtrSt Second RA EIC t/

/

%fA LdRP A&-

SGA July 3,1996 ORS og DNMs PAO U. S. Nuclear Regulatory Commission ORMA Regional Administrator, Region 111 801 Warrenville Road FILE

/>w Litle, Illinois 60532-4351

Subject:

LaSalle Station Units 1 and 2 Additional Information to Request For Regional Notification of Enforcement Discretion to Facility Operating License NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374

References:

Request For Regional Notification of Enforcement Discretion to Facility Operating License NPF-11 and i

NPF-18 NRC Docket Nos. 50-373 and 50-374

Dear Mr. Miller,

The purpose of this letter is to provide additional information that was requested during a teleconference that took place Comed and the NRC

{

Staff, at 1610 hours0.0186 days <br />0.447 hours <br />0.00266 weeks <br />6.12605e-4 months <br /> on June 29,1996. As a result of the teleconference, Comed received a Regional Notification of Enforcement Discretion from Technical Specification Limiting Condition for Operation (LCO) 3.0.3. The results of this teleconference were provided in the Reference letter. During the teleconference, Comed committed to provide additional information on two items; the list of components that will be inspected or tested to ensure that foreign material is not present, and the acceptance criteria for Service Water Tunnel cleanliness. Attachment A provides the acceptance criteria for Sentice Water cleanliness. Attachment B provides the list of components that will be inspected or tested to ensure that foreign material is not present.

9 9 6 -- O l 300095 9607300366 960703 DR ADOCK 0500 3

JllL 15 B96' A Unicom Company

4 If there are any questions or comments conceming this letter, please refer them to me at (815) 357-6761, extension 3600.

Respectfully,

'A R. 5. Querlo Site Vice President LaSalle County Station Enclosure cc:

H. J. Miller, NRC Region 111 Administrato P. G. Brochman, NRC Senior Resident inspector - LaSalle D. M. Skay, Project Manager - NRR - LaSalle F. Niziolek, Office of Nuclear Facility Safety - lDNS Central File I

l

(

m i

ATTACHMENT A l

The following shall be the acceptance criteria for Service Water Tunnel cleanliness:

1 1.

No visible free (loose) sealant material in the Service Water Tunnel as determined by diver visual inspection.

2.

No sealant particles greater than 3/8 inch diameter, and less than 1 ounce dry weight of sealant particles less than 3/8 inch diameter in the Service Water Tunnel, collected after flowing approximately 2000 gallons through a 1/16 inch mesh strainer. Three successive samples shall be taken, with each sample meeting this criteria. These samples shall be taken from different areas of the Service Water Tunnel.

The recommended sample point shall be from the discharge of the diver l

scavenging pump hose, while the pump is being used with a suction taken from Service Water Tunnel.

l l

l i

i l

l 1

i 1

ATTACHMENTO Foreign Material Introduced into WS Tunnel Event List of Components to be Inspectedfrested EPN Description Type of Inspection / Test Acceptance Criteria 2E22-D300 28 DG Cooling Water Visual, check for presence of suspect Poro-Edge tube strainer surface area less Strainer materia!, determine if quantity is sufficient than approximately 50% clogged.

to warrant cleaning. Photograph & bag.

2E21-C001 LPCS Motor Cooler Visual, check for presence of suspect No suspect particles > 1/16" and no material, determine if quantity is sufficient accumulation of smaller particles that could to impede minimum design flow.

affect function.

Photograph & bag.

0WS131 Flow Control Valve @

Open unions, visual inspection, check for No suspect particles > 1/8" and no suction of condenser presence of suspect material, determine if accumulation of smaller particles that could OVV11S particles are of sufficient size to impede affect function.

function. photograph & bag.

2FP01M Ring Header Strainer Visual, check for presence of suspect The strainer screens surface area with less material, photograph & bag

'han approximately 20% clogged material.

OFP01PB B Fire pump suction Visual, check for presence of suspect The strainer carface area less than strainer material, photograph & bag approximately 50% clogged.

OFP14MA DFP strainer Visual, check for presence of suspect The strainer surface area less than material, photograph & bag approximately 50% clogged.

OFP16MA DFP strainer Visual, check for presence of suspect The strainer surface area less than material, photograph & bag approximately 50% clogged.

OFP19M Intermediate pump Visual, check for presence of suspect The strainer surface area less than suction strainer material, photograph & bag approximately 50% clogged.

2D18-J009 WS effluent radiation Disassemble and inspect for presence of No suspect particles > 1/16* and no monitor suspect material.

accumulation of smaller particles that could affect function.

1D18-J006 RHR-SW effluent Disassemble and inspect for presence of No suspect particles > 1/16" and no radiation monitor 1D18-suspect material.

accumulation of smaller particles that could N908 affect function.

twpexwisedoeswelist.xts Page 1 July 2,1996

ATTACHMENT B Foreign Material introduced into WS Tunnel Event List of Components to be inspected / Tested 1WS121 Temp control valve Disassemble, check for presence of No suspect particles > 1/8" and no suspect material, determine if particles are accumulation of smeller particles that could of sufficient size to impede function.

affect function.

photograph & bag.

2E22-N502 PDIS across strainer Make sure that isolation valves next to Uostream side of instrument - no 2E22-D300 strainer are closed. Flush through b0th accumulation of any size suspect particles upstream and downstream sides of that could affect function. Downstream side instrument and instrument line.

of instrument - No suspect particles > 1/16" and no accumulation of smaller particles that could affect function eo twpexvniscdocsvvetist.xts Page 2 July 2,1996

,