Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20117A528 + (03:03:39, 13 December 2024)
- ML20117A522 + (03:03:40, 13 December 2024)
- ML20117A527 + (03:03:40, 13 December 2024)
- ST-HL-AE-4270, Special Rept:On 921022,nonvalid Failure of Standby DG 12 Occurred During Standby DG Operability Surveillance Test. Caused by Tripped Generator Breaker Lockout Relay at Local Control Panel.Surveillance Procedures to Be Revised + (03:03:41, 13 December 2024)
- ML20117A497 + (03:03:42, 13 December 2024)
- RBG-20-760, Forwards Info Re Prompt Notification Sys in Response to 810720 Request.Sys Consists of 92 Sirens.Eighty Sirens Installed & Tested to Be Functional as of 850328.Addl 12 Sirens Will Be Installed & Functionally Tested + (03:03:43, 13 December 2024)
- ML20117A491 + (03:03:43, 13 December 2024)
- BSEP-96-0290, Responds to GL 88-20,Supplement 4, Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities + (03:03:44, 13 December 2024)
- ET-NRC-92-3776, Forwards Proprietary Draft SPES-2:Scaling Update, Including Test Schedule & Proprietary Draft PXS-T1P-002, AP600 Fhfp Integral Sys Test Spec to Be Used for Meeting. Proprietary Portion of Document Sent to Westinghouse + (03:03:45, 13 December 2024)
- 05000354/LER-1996-033, :on 951114,two Events Occurred Due to Identification of TS Surveillance Test Inadequacy.Caused by Ineffective Procedures.Tssip Review Will Be Completed + (03:03:48, 13 December 2024)
- ML20117A477 + (03:03:49, 13 December 2024)
- ML20117A462 + (03:03:50, 13 December 2024)
- ML20117A461 + (03:03:51, 13 December 2024)
- RA-96-0142, Forwards Correction to Ltr Re Spent Fuel Shipping + (03:03:51, 13 December 2024)
- ML20117A445 + (03:03:53, 13 December 2024)
- ML20117A442 + (03:03:54, 13 December 2024)
- ML20117A428 + (03:03:58, 13 December 2024)
- ML20117A415 + (03:03:59, 13 December 2024)
- ML20117A411 + (03:04:00, 13 December 2024)
- ML20117A410 + (03:04:02, 13 December 2024)
- ML20117A396 + (03:04:03, 13 December 2024)
- ML20117A391 + (03:04:04, 13 December 2024)
- ML20117A380 + (03:04:06, 13 December 2024)
- ML20117A371 + (03:04:07, 13 December 2024)
- ML20117A375 + (03:04:07, 13 December 2024)
- ML20117A361 + (03:04:09, 13 December 2024)
- HL-3050, Forwards Revised,Redacted,Nonconfidential Nuclear Operating Agreement Between Georgia Power Co & Southern Nuclear Operating Co,Inc & Supporting Affidavit Attached to Util + (03:04:10, 13 December 2024)
- ML20117A353 + (03:04:10, 13 December 2024)
- ML20117A331 + (03:04:12, 13 December 2024)
- ML20117A333 + (03:04:12, 13 December 2024)
- ML20117A326 + (03:04:13, 13 December 2024)
- ML20117A318 + (03:04:14, 13 December 2024)
- ML20117A314 + (03:04:14, 13 December 2024)
- ML20117A306 + (03:04:15, 13 December 2024)
- ML20117A303 + (03:04:15, 13 December 2024)
- RBG-20865, Requests Approval to Invoke ASME Code Case N-413 for Fillet & Partial Penetration Welds for Supports,Including Attachment Welds to Supporting Structures + (03:04:16, 13 December 2024)
- ML20117A284 + (03:04:17, 13 December 2024)
- ML20117A277 + (03:04:18, 13 December 2024)
- ML20117A279 + (03:04:18, 13 December 2024)
- B15863, Responds to Request for Addl Info to Support Review & Evaluation of Unit 3 Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (03:04:20, 13 December 2024)
- ML20117A274 + (03:04:20, 13 December 2024)
- ML20117A265 + (03:04:21, 13 December 2024)
- ML20117A261 + (03:04:22, 13 December 2024)
- 05000317/LER-1985-005-01, :on 850406,inadvertent Initiation of Steam Generator Isolation Signal Occurred.Caused by Failure to Insert Keys Necessary to Block Signal in Keyswitches Prior to Cooldown Procedure.Procedure Modified + (03:04:24, 13 December 2024)
- ML20117A244 + (03:04:25, 13 December 2024)
- 3F0585-03, Remits Fee for 850501 Application to Amend License DPR-72, Consisting of Tech Spec Change Request 128.Check Inadvertently Omitted from Submittal + (03:04:26, 13 December 2024)
- RBG-20739, Forwards Rev to Liquid Radwaste Sys.Clarification & Info on Contracted Sys & Revised FSAR Text to Be Included in Future FSAR Amend Encl + (03:04:26, 13 December 2024)
- ML20117A232 + (03:04:27, 13 December 2024)
- ML20117A229 + (03:04:28, 13 December 2024)
- ML20117A205 + (03:04:29, 13 December 2024)
- ST-HL-AE-1244, Forwards Amend 47 to FSAR for South Texas Project Units 1 & 2,incorporating General Update to Chapter 9.5.1 & Revised Responses to NRC Questions.Affidavit Encl + (03:04:29, 13 December 2024)
- ML20117A201 + (03:04:30, 13 December 2024)