ML20117A232
| ML20117A232 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 04/30/1985 |
| From: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| To: | Thompson H Office of Nuclear Reactor Regulation |
| References | |
| GL-84-11, NSL8500078, TAC-55595, NUDOCS 8505080115 | |
| Download: ML20117A232 (3) | |
Text
'
GENERAL OFFICE Nebraska Public Power District
" "k&Ys*E74'*Fes*e^'** '"
S NSL8500078 April 30,1985 Mr. Hugh L. Thompson, Jr., Director Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Mr. Thompson:
Subject:
Response to Generic Letter 84-11 dated April 19,1984, " Inspections of BWR Stainless Steel Piping"
Reference:
1)
Letter from L. G. Kunel to D. G. Eisenhut dated June 4, 1984, " Response to Generic Letter 84-11 (Inspection of BWR Stainless Steel Piping)"
2)
Letter from J.
M.
Pilant to D.
B.
Vassallo dated December 13,1984, "Inconel Nozzle Butter Repair" In Reference 1, the District responded to Generic Letter 84-11 by listing the stainless steel piping, safe-ends, and piping components which would be replaced during the present outage at Cooper Nuclear Station.
As requested by the staff, this letter is written to specifically address item 2 of Generic Letter 84-11 by confirming that all welds in stainless steel piping susceptible to IGSCC are being replaced this outage if 1) the piping is equal to or greater than 4" in diameter, and 2) the systems operate over 200oF, and
- 3) the piping is part of, or connected to, the Reactor Coolant Pressure Boundary, and 4) the welds are inboard of the second isolation valve.
Additionally, this letter is written to inform the staff that the Inconel Nozzle Buttering Repair Procedure of Reference 2 was utilized on one nozzle during the present outage.
An outline and drawing of the repair is attached for your information.
Should you have any quastions, please contact my office.
Sincerely,
hkk rti J. M. Pflant Technical Staff Manager Nuclear Group JMP/grs:dmr30/1(DAILY 1)
//
[M7 8505080115 850430 s/f PDR ADOCK 05000298 P
s
- t OUTLINE OF REPORT Nozzle N2E at 150* azimuth Cutting prep in nozzle bore for corrosion resistant cladding.
Opened PT indications in prep area.
Chased PT indications to base metal (base metal determination by acid acth):
area about 1/4" square of base material.
Dressed repair for half bead repair:
area opened about 7/8" and 3/8" long.
Installed Cooper heaters.
Preheated nozzle to 300*F.
Performed half bead weld repair (Per ASME Section II 1983 Code).
Performed post heat at 500*F.
Performed NDE. All results were satisfactory.
I e
4
i
\\o yL - cm \\:-O*
.,c. p.I '.
t.ccren
.ntJ C
Ewo i: Ccu m 7,. R RE.
95P=NT ETO
\\qo RC O*
o
.r V
'Y.'
ha.MrN_
[
We:ese g J
G~
\\
~
)
i
/
.L.
l' *
/
l
/
4 p-etT u-=ct
-. a,
(
'C' 1
/
).
4 l
1 I
Vict On bs
,r a
(g,G 3
Co
/l L
o en k
h I/
O I
b j
b.
d
' /{h -
~~~
~~
f
~
i' f
h
/
/5
\\
i
/
/
\\
.~
/
/
/
/
/
/
/
.a V
ed gb
\\u. 2.@\\'T'TiSrT T::G- "
M k\\D DCh l
)
.I b'"
4 so t R Z.97 dRC dooNYTRGomE. NE E Nome hiso Az.
E gs
,~g {
- c. *
- MADEBY CHKDBY gy JUUJECT l
CHARGE NO.
e i
n to
%7c i W
C: kd l
^
s h20iCt-mcMS CRC 3.$.'y i
1 em i
ssr o
CO 6 4 E.'.' 4 -13
......... Q.. w 5.. ;
- > ? ;i,. r., ~..z a". >i.
. =.
.-a-
^-
.s 4%iM.
- L
.