Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20117N580 + (02:28:01, 13 December 2024)
- ML20117N577 + (02:28:03, 13 December 2024)
- 05000528/LER-1985-026, :on 850329,diesel Generator B Failed to Attain Required Frequency.Start Failure Third in Five Valid Tests. Caused by Test Performance Error & Not Actual Diesel Generator Failure + (02:28:04, 13 December 2024)
- ML20117N568 + (02:28:06, 13 December 2024)
- 05000454/LER-1984-043-02, :on 841031,two Seal Injection Header Test Connection valves,1CV066B & 1CV067A,discovered to Be Returned to Svc W/O Required Inservice Insp.Caused by Failure to Follow Procedures.Personnel Trained + (02:28:08, 13 December 2024)
- ML20117N560 + (02:28:10, 13 December 2024)
- ML20117N551 + (02:28:11, 13 December 2024)
- 05000328/LER-1985-006-03, :on 850406,air Control Valve for ERCW Valve 2-FCV-67-186 Found in Closed Position.Caused by Improper Back Plate Indications.Back Plates Will Be Modified + (02:28:12, 13 December 2024)
- LIC-96-0134, Monthly Operating Rept for Aug 1996 for Fort Calhoun Station + (02:28:16, 13 December 2024)
- PY-CEI-NRR-2094, Monthly Operating Rept for Aug 1996 for Perry Nuclear Power Plant Unit 1 + (02:28:17, 13 December 2024)
- ML20117N510 + (02:28:18, 13 December 2024)
- ML20117N520 + (02:28:18, 13 December 2024)
- ML20117N505 + (02:28:19, 13 December 2024)
- ML20117N507 + (02:28:19, 13 December 2024)
- 05000266/LER-1996-006, :on 960813,emergency Power Out of Service Coincident with Opposite Train SW Pump.Root Cause Evaluation Being Performed.C/As Will Be Determined as Necessary from Results of Root Cause Evaluation + (02:28:21, 13 December 2024)
- 3F0996-06, Discusses Concerns Re License Amend Request for Alternate Repair Criteria for SG Tubing + (02:28:22, 13 December 2024)
- RBG-20791, Forwards Revised Response to Items 8 & 16 of 831229 Request for Addl Info Re Tdi Diesel Generators.All Items Addressed Completely + (02:28:24, 13 December 2024)
- 05000369/LER-1985-011-01, :on 850409,samples Taken from Cold Leg Accumulator a Prior to Unit Shutdown Revealed Low Boron Concentration.Caused by Component Failure.Boron Concentration Returned to within Specs + (02:28:26, 13 December 2024)
- 05000305/LER-1985-012, :on 850410,reactor Tripped.Caused by Differences in Ground Potential Between Ni & Test Equipment. Purchase of New Portable Picoammeter Being Considered + (02:28:28, 13 December 2024)
- BVY-96-105, Provides Util Plans for Insp of RPV Shell Welds at Plant During Refueling Outage on 960906 + (02:28:29, 13 December 2024)
- ML20117N451 + (02:28:31, 13 December 2024)
- ML20117N446 + (02:28:35, 13 December 2024)
- ML20117N435 + (02:28:36, 13 December 2024)
- ML20117N444 + (02:28:36, 13 December 2024)
- ML20117N433 + (02:28:37, 13 December 2024)
- BSEP-85-0545, Provides Supplemental Response to NRC Re Violations Noted in Insp Repts 50-324/83-11,50-325/83-11, 50-324/83-26 & 50-325/83-26.Info Provides Update of Fire Protection Program Status & Programmatic Changes + (02:28:38, 13 December 2024)
- BSEP-96-0184, Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 12 Startup Rept. Based on Requirement,Encl Rept Being Submitted Due to Loading of New GE13 Fuel Type for Cycle 12 Operation + (02:28:39, 13 December 2024)
- ML20117N427 + (02:28:39, 13 December 2024)
- ML20117N424 + (02:28:40, 13 December 2024)
- ML20117N420 + (02:28:41, 13 December 2024)
- ML20117N402 + (02:28:45, 13 December 2024)
- ML20117N398 + (02:28:47, 13 December 2024)
- ML20117N396 + (02:28:47, 13 December 2024)
- ML20117N378 + (02:28:48, 13 December 2024)
- ML20117N389 + (02:28:48, 13 December 2024)
- ML20117N374 + (02:28:50, 13 December 2024)
- ML20117N361 + (02:28:50, 13 December 2024)
- ML20117N344 + (02:28:51, 13 December 2024)
- JAFP-85-0414, Monthly Operating Rept for Apr 1985 + (02:28:52, 13 December 2024)
- 05000366/LER-1985-012-01, :on 850409,unplanned Actuation of Reactor Protection Sys Occurred.Caused by Failure of Main Steam Line Radiation Detectors Due to Loose & Saturated Power Cables. Cables Replaced + (02:28:53, 13 December 2024)
- LIC-96-0126, Responds to NRC Re Violations Noted in Insp Rept 50-285/96-04 on 960602-0713.Corrective Actions:Three Operators Involved in Incident Have Been Counseled on SO-G-52 Working Hour Limitations,Completed in July 1996 + (02:28:54, 13 December 2024)
- ML20117N323 + (02:28:56, 13 December 2024)
- 05000322/LER-1985-014, :on 850408,hourly Firewatch Patrol,Required by Tech Specs,Late by 10 Minutes for Emergency Diesel Generator Rooms.Caused by Computer Malfunction Which Denied Access to Rooms.Security Summoned to Permit Access + (02:28:58, 13 December 2024)
- 05000483/LER-1985-021, :on 850404,spacing Between Batteries End Cells & Stringers Did Not Meet Specified Criteria.Caused by Deficient Drawings.Fire Retardant Plywood Spacers Installed Between Battery End Cells & Stringers + (02:29:00, 13 December 2024)
- ML20117N311 + (02:29:02, 13 December 2024)
- ML20117N314 + (02:29:02, 13 December 2024)
- ML20117N295 + (02:29:03, 13 December 2024)
- ML20117N297 + (02:29:03, 13 December 2024)
- ML20117N289 + (02:29:04, 13 December 2024)
- ML20117N274 + (02:29:05, 13 December 2024)
- ML20117N276 + (02:29:05, 13 December 2024)
- 05000271/LER-1996-010, :on 960411,inadequate Design/Single Failure Evaluation During Design Change Identified Potential Loss of RHR Pump Min Flow Protection.Evaluation Performed.No Significant Safety Concerns Existed + (02:29:07, 13 December 2024)