Errata to Amend 126 to License NPF-29.Page 3.6-53 of TSs Inadvertently Issued W/Phrase Missing from First Part of Frequency for SR 3.6.5.1.1
ML20117N420
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 09/16/1996
From:
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20117N423 List:
References
NUDOCS 9609190185
Download: ML20117N420 (1)


Text

-

Drywell 3.6.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.5.1.1 Verify bypass leakage is less than or 24 months equal to the bypass leakage 1?ntit.

following 2 consecutive However, during the first unit startup tests with following drywell bypass leak rate bypass leakage testing performed in accordance with this greater than SR, the acceptance criterion is leakage the bypass s 10% of the bypass leakage limit.

leakage limit until 2 consecutive tests are less than or equal to the bypass leakage limit AND 48 months following a test with bypass leakage greater than the bypass leakage limit AND


NOTE-----

SR 3.0.2 is not applicable for extensions > 12 months.

120 months SR 3.6.5.1.2 Visually inspect the exposed accessible interior and exterior surfaces of the Once prior to drywell.

performance of each Type A test required by SR 3.6.1.1.1 SR 3.6.5.1.3 Verify drywell air lock leakage by 24 months performing an air lock barrel leakage tests at it 3 psid.

GRAND GULF 3.6-53 Amendment No. 4M,126 9609190185 960916 PDR ADOCK 05000416 P