Text
-
4 n;'.
OPERATING DATA REPORT.
"1 DOCKET NO. 50-333 DATE May 1985 COMPLETED BY J. Cook TELEPHONE (315)342-3840
.0PERATING STATUS 1.
Unit Name: JAMES-A.~FITZPATRICK
- Notes 27 Reporting Period:
850401 - 850430 3.
Licensed Thermal Power (MWt): 2436 4..
Nameplate Rating (Gross MWe): 883
- 5.. Design Electrical Rating (Net MWe): 821 6.
Maximum Dependable Capacity (Gross MWe): 830
- 17. -Maximum Dependable Capacity (Net MWe):
810 8.
If Changes Occur in Capacity Ratings (Items 3 Through 7) Since Last Report,Give Reasons:
NONE-9... Power Level To Which Restricted, If Any (Net MWe): NONE
- 10.. Reasons For= Restrictions, If Any:
This Month Yr.-to-Date Cumulative 111 --Hours In Reporting Period 720 2880 85561 3
12?J Number Of Hours Reactor Was Critical 0
1096.8 60712.8 113. Reactor Reserve Shutdown Hours 0
0 0
- 14. zHours Generator On-Line 0
1096.8 59044.1
- 15. Unit Reserve ~ Shutdown Hours 0-0 0
- 16. Gross Thermal Energy, Generated (MWH).
0 2558832 125494786 17.
Gross' Electrical Energy Generated (MWH) 0 873930 43154210 18.
Net Electrical Energy Generated (MWH) 0 845655 41243660
-19.
Unit Service Factor 0
38.1%
69.0%
20.
Unit Availability Factor 0
38.1%
69.0%
21.' Unit Capacity Factor (Using MDC Net).
0
-36.3%-
62.6%
22.
Unit Capacity. Factor (Using DER' Net) 0 35.8%
58.7%
23.. Unit Forced Outage Rate' 0
0%
13.3%
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
May 22, 1985 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION h) i
-8505170484 850430 PDR ADOCK 05000333 g
R FDR
e
' AVERAGE DAILY UNIT POWER LEVEL-DOCKET NO. 50-333 UNIT - FitzPatrick DATE May 1985 COMPLETED BY J. Cook
-e-TELEPHONE (315)342-3840 MONTH. APRIL 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 0 0
1 17 0
0 2
18 0
0 3
19 0
0 4
20 0
0 5
21 0
0 6
22 0
0 7
23 0
0 8
24 0
0 9
25 0
0 10 26 0
0 11 27 0
0 12 28 0
0 13 29 0
0 14 30 0
15 31 0
16
SUMMARY
- The FitzPatrick plant remained shutdown for this entire reporting period.
,g4*
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE APRIL 1985 The FitzPatrick plant remained shutdown for this entire reporting period.
Estimated date of startup is May"22, 1985.
1 UNIT SHUTDOWNS AND F0WER. REDUCTIONS' DOCKET No. 50-333 UNIT NAME' l-ITZPATRICK DATE MAY LORE; REPORT MONTH ADDTI loot COMPLETED BY l rnny TELEPHONE T315131i?-3Mn
" - " ' ~
z woo e
SG 5d LICENSEE Uw 7w CAUSE & CORRECTIVE-d z
NO.
DATE 8
$U*
EVENT 5$
. ACTION TO O
d REPORT #
PREVENT RECURRENCE g
3 850214 S
720 C
3 85-006 TB N/A Shutdown For Refueling (cumulative hrs. 1783.2) 1 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Peparation of Data B-Maintenance of Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File NUREG D-Regulatory Restriction 4-Other(Explain) 0161 E-Operator Training & License Examination F-Administrative G-Operational Error (Ftplain)
H-Other(Explain)
7"1 NEW YORK POWER AUTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
April 1985 ACTION TAKEN REPAIR WORK REOUEST NO.
HOW CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMPONENT No.
DETECTED MALFUNCTION MALFUNCTION RECURRENCE-HOURS-y 850408 02 038658 I&C Thermocouple Investigate Strapped Thermocouple 6
TE-145B Hanging in Condition of To Pipe Air Thermocouple 850401 02 032655 I&C N/A Install Calibrateo Peplaced TE-140A-D 10 TE-140A-D RTD's 850424 07 033898 OPS UNKNOWN Took Step change Ran TDR and Hi 5
SRM D Upward Resistance Test 850418 07 033765 OPS Drive Tube Jammed Couldn't Get Replaced Gear Unit /
16 SRM B Into Crating Into Core Adj Tension 850413 07 033757 OPS Shorted Coil Relay 7C-K7H Replaced Relay 7C-K7H 14 SRM/IRM Burned Up 850413 07 038653 I&C HEPA Hose Against Inspect Connects Tied Up HEPA Filter 2
SRM/IRM IRH Connector On Drive Modules Hose 850405 10 038662 ISC Found Wire On Rectify Wiring Relocated Wire 4
VARIOUS Wrong Terminal DEFS/ IMP-71.18B 850417 10-16 023191 I&C Mcdification RFA Relays For Replaced Relays &
578 HEA RELAYS No. M1-84-080 Mod. M1-84-080 Calibrated
NEW YORK POWER AUTIl0RITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
April 1985 ACTION TAKEN REPAIR WORK RECUEST NO.
110W CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMPONENT NO.
DETECTED MALFUNCTION MALFUNCTION RECURRENCE IIOURS 850412 14 032657 I&C Wire to Term #14 Correct Wiring Attached Wire to 1
K13A/K10A Disconnected Problem Term #14 On K10A 850403 33 023453 I&
Age-Use Leak Between Test Valve Replaced Under 1
PS-135A And System F1-82-53 850408 68 023127 I&C N/A Calibrate Calibrated Per ISP 27 4
TR-102 & 103 Recorders 850401 68 035543 OPS Found Power Cord Recorder Not Connected Cord 2
TR-103 Disconnected Printing 850408 93 023194 I&C Meter Can Not Be Replace Frequency Replaced Damaged 3
FM-2C Calibrated Meter For "C" EDG Meter
NEW YORK FOJER AUIHORITY JAMES A. FITZPAIRICK WCLEAR POWER PIAhT SAFELY REUGED ELECTRICAL & IECHANICAL MAINTENANCE S&HARY APRIL 1985 REPAIR m RK REQUEST /
TIME DATE SYSIHI CO'PmENT H01 Draualv CAUSE OF MALH]1LTION ACTION TAKEN 10 PRECLUDE PICURRBCE HOURS 4/9/85 71 22670 OPS Breaker quick closed Replaced Breaker 26 Ikr 11602 mechanism 3/27 27 35561 LLPI Seat Irak Replaced plunger, disc and seat 6
SOV-135B 3/29 29 38659 OPS Worn Packing Repacked valve 8
MST-1054C 3/30 71 35650 OPS Grounded tsperature Replaced detectors 80 DCA3 fil detectors 4/9 71 22690 Visual Inproperly protected Cleaned transformer 4
L-16 egd =mt 4/4 71 22668 Preventive Chipped secondary Replaced secondary couplers 48 10600 Maintenance couplers 4/2 03 37232 OPS Throttle Valve Replaced valve 5
HCU 10-11 Bound L) 4/12 10 33861 Visual Worn Packing Repacked 13 RER-88 4/13 10 35608 URT Seat Imak Lapped seats and wedge 225 WV-17 4/12 23 25468 N/A No malfunction Inspected per P&V ISI Program 6
EPI-402
IEJ YORK POWER AUIIIORITY JAMES A. FITZPATRICK NUCLEAR POLER FIANT SAFEIY RELA'IED ELECTRICAL & MECHANICAL MAINrmANCE SUWARY APRIL 1985 REPAIR kORK REQUEST f TIFE ImE SYS'IIM C m P O E TT HOW DEIECIED CAUSE OF MALFUICTION ACTION TAKEN 'IO PRECLUDE RECURRENCE HOURS 4/10 27 35536 LIRT Seat leakage Adjusted operator coupling.
60 ADV-116 Replaced coupling pin.
4/8 27 35511 LIRT Seat Irak Replaced seat ring.
120 ADV-117 4/8 27 22684 LIRT Seat Irak Replaced seat nng.
120 ACV-118 3/15 29 35599 LLRT Seat Irak Replaced disc, lapped seats.
124 F0V-74 4/12 71 35500 Visual Broken reset button Replaced reset button 2
FEC 163 13 IKN-15 4/7 71 22669 Visual Defective Imp Socket Replaced Socket 1
10612 Ekr 4/7 76 35517 Visual Bumed out lamp Replaced lamp 1
P-2 4/13 12 35590 LIRT Seat leakage Replaced wedge; lapped seats 570 FDV-15 4/12 15 25460 N/A Ib malfunction Inspected per P&V ISI Program 4
REC-35C 4/12 15 25459 N/A lb malfunction Inspected per P&V ISI Program 4
FIC-35B
131 YORK POWER AlmIORITY JRIES A. FITZPATRICK IH1 EAR POWER PIRE SAFEIY RELCED ELECTRICAL & MECHANICAL MAINTBMNCE Silt'ARY APRIL 1985 REPAIR E0RK RB NEST /
TIEE DATE SYSIDI CmPOSE IIOR Du unu)
CAUSE OF MAIR3CTION ACTION TAKEN TO PRECLUDE RECURRENCE liOURS 4/12 15 25466 N/A lb mlfunction Inspected per P&V ISI Program 4
PIC-59 4/12 15 25467 N/A Ib unlfunction Inspected per P&V ISI Program 4
RBC-61 4/9 16 21084 N/A Ib rnlfunction Added bearings to air lock door 180 IIA-3 hinges.
3/26 20 35558 LIRr Seat leakage 12pped seat and disc.
26 F0V-94 4/11 23 25461 N/A lb rulfunction Inspected per P&V ISI Program 20 HPI-61 4/19 46 25455 P&V ISI Corrosion / erosion Replaced disc with disc fraa other 36 ESU-1A of disc stud valve 4/11 71 22691 GPS Faulty filter Replaced filter capacitors 5
BC1B capacitors 3/31 71 21079 N/A lb rnlfunction Provide taiporary power for battery 15 ICB 3 & 4 chargers and RPS durirs bus outage PT 05-6B 4/19 71 22694 OPS Shorted resister Rebuilt regulator circuit board 2
ECIA
IEJ YORK POWER AUIEOPlTY JRES A. FITZPATRICK NUCLEAR PGIR PIANT SAFELY RELCED ELECIPlCAL & I"M'ICAL PAINIENANCE SRt!ARY 5
APRIL 1985 REPAIR K0FX REQUEST f TIME DICE SYSID!
CO!PO S T HOL' DETECIED CAUSE OF PALFUIC1'IGl ACTION TAKEN 'IO PRECLUDE RECURRENCE HOURS 4/22 00 36306 N/A No malfunction Installed cable entrance noisture 100 Various seals per M1-85-003 Instnrent Sensors 4/19 02 35410 LLRT Seat leakage Replaced disc and spring, lapped 28 PkR-13B disc and seat 4/23 03 19873 OPS Ibrun1 operations Replaced CRD 95 CRD 10-35 4/23 03 19833 OPS Norral operations Replaced CRD 49 CRD 46-11 4/23 03 18387 OPS Norrn1 operations Replaced CRDs 40 CED 02-27 CRD 50-31 4/20 08 22874 OPS Seized base reel Disassabled, cleaned and 30 Pctorail Hoist reassmbled 4/13 03 22582 OPS Ibrual operatices Rebuilt CRD, leak tested 64.5 CED 5082 4/13 03 22581 GPS Norral operations Rebuilt CRD, leak tested 40.5 CRD 7928 4/12 03 22584 OPS Norrnl operations Rebuilt CRD, leak tested 56 CED A5146
hTN WRK POE AIIIh0RITY J/JES A. FITZPAIRIG LIELEAR PGER FIRTF SAFEIY RELATEI) EECIRICAL & MEDIA?!ICAL MAINIBIANCE SGUARY APRIL 1985 REPAIR kGK REEST f THE EAIE SYSTDI CCt f G S TP 1R' DEIECIII)
CAUSE OF PAIR 21CTIGI ACTION TAKD! 10 PRECLUDE RECURRH3CE llOURS 4/13 03 22586 CPS l'ortal operations Rebuilt CRD, leak tested 58.5 CED 3236 4/16 24 23888 CPS Bent lirkage Straightened lirkage 16 ECD-1 4/19 03 33872 OPS SOVs 117 & 118 Rebuilt SOV-117 & 118 4
ECU 26-51 failed to operate 4/21 C8 33787 OPS Faulty solenoid on Replaced solenoid 7
Refuel Bridge frame mounted hoist 3/9 15 354C6 IlRT Seat leakage Iapped seat and disc 30 FEC-26A 4/18 16 33858 LIRT O-Ring leakage Replaced 0-rings 12 Stabilizer Cover 4/20 08 25886 OPS Sticking relay Replaced relay 2
Refuel Eridge 4/24 29 34507 OPS Sicv close tire.
Replaced valve 1/2 IFI-80A Adv. valve silencer dirty 4/24 29 34508 OPS Slow close time.
Replaced valve 1/2
/LV-86D Adv. valve silencer dirty
~.
IBJ YORK FGER AUIHCRITY JAFIS A. FITZPATRICK 17JCLEAR POLTR PLIl?r SAFEIY REIATED EIICIRICAL & MEOWIICAL MAINIEANCE SRtMRY APRIL 1985 REPAIR UCRK REQUEST f TIME DATE SYSIm C O R r a TT I!Oll Dunaw CAUSE OF MAIRTICTION ACTION TAKHI 70 PRECLUDE RECURRD'CE IIOURS 4/24 29 34506 OPS Slow close tire.
Replaced valve 1/2 ILV-86A Adv. vlave silencer dirty 4/2C 39 35512 LIRr Seat leakage Replaced valve 84 SAS-10 4/24 46 23881 P&V ISI Eroded / corroded Replaced disc and hanger 20 ESW-1B threads 4/12 10 34306 CPS Hi vibration -
Rebuilt ptrp 38 P-1C Wm shafts and bearings 4/27 03 33884 OPS Em packing on Repacked 4
liCU 22-43 111 Vahe 4/27 03 33885 OPS Ucrn packing on Repacked 4
liCU 06-23 111 Vahe 4/27 03 33887 OPS Wom packing on Repacked 4
liCU 10-27 111 Vahe 4/29 03 33ESS OPS Wom packing on Repacked 4
liCU 06-27 111 Vahr 4/29 03 38764 OPS Scat Icak Cleaned and lapped seat and wedge 10 CRD 916B
S James A. FitaPatrick I
Nuclear Power Plant PO. Boa 41 Lycomog. New York 13093 315 342.3840 Harold A.Giovier Resident Manager tv Authority May 7, 1985 JAFP 85-0414 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION:
DOCUMENT CONTROL DESK
REFERENCE:
DOCKET No. 50-333 Dear Sir Enclosed please find the J. A. FitzPatrick Operating Status Report for the month of April, 1985. Refueling information remains the same as previously submitted.
If there are any questions concerning this report, please contact John Cook at (315) 342-3840. Ext. 439.
/
I
,. >LO R
HAG Imac cet Internal Distribution Enclosuren S0 y
I \\
- -