DmB CommonweaHh Edison One First Nation i Prta, Chicago, lihnois cago.$i!fno#is 6$$ U"'

  • 8
  • 767 April 25, 1985 James G. Keppler Regional Administrator U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Braidwood Station Units 1 & 2 Actions Taken For SALP Category 3 Issues NRC Docket Nos. 50-456 and 50-457 Reference (a):

J. G. Keppler letter to Cordell Reed dated November 6, 1984

Dear Mr. Keppler:

On March 15, 1984, a group from Commonwealth Edison including Messrs. T. J. Maiman, M. J. Wallace, and W. J. Shewski, met with Messrs. E. Greenman, R. F. Warnick, and W.

S. Little, and others af your staff.

They discussed actions which Commonwealth Edison Company has taken and/or initiated in the three areas which were rated category 3 in reference (a), piping, safety related equipment, and quality assurance.

The purpose of this letter is to provide documentation of the information which Commonwealth Edison provided to members of your staff relative to actions taken to improve performance in these areas.

The discussion topics were testing, the mechanical contractor and Quality Assurance.

The attachment begins with summaries of each of these topics.

These are followed by copies of the viewgraphs presented.

If you or your staff have any questions regarding this matter, please direct them to this office.

Very truly yours,

' OA 4 6 David H.

Smith Nuclear Licensing Administrator

/klj 0043K APR 2 D 1985 (h

SS l& g

-)

i a

r

SUMMARY

OF PRESENTATION TO NRC MARCH 15, 1985 l

l b.

r Q

f TESTING G

The Braidwood Test and Startup Program was developed initially from the same Startup Manual that Byron used.

The production of that manual strongly considered LaSalle experience as well as the Bu*on experience to that point.

The Braidwood Startup organization was developed to address difficulties experienced at LaSalle County and Byron, particularly the requirement that the Technical Staff personnel complete the end of the testing program and all of the preparatory activities for Station operation at fuel load in the same time frame.

During the course of time, the Braidwood and Byron programs diverged due principally to Lessons Learned, inputs from Quality Assurance, and commitments made to the NRC.

At this point, it is our intention to realign the Braidwood program with the present Byron program.

This should provide familiar activity for Quality Assurance, Project Engineering Department, and the NRC and should produce a " duplicate program" for each succeeding unit.

To accomplish this realignment, the Braidwood Startup Manual will be compared with Byron's and the Braidwood manual will be made to parallel the Byron manual unless there is reason to change both manuals to a new method of operation.

To assure similarity between the tests for subsequent units and the original Byron tests, an example procedure will be written.

This procedure will be applicable to one of the remaining units.

A joint test review board from Byron and Braidwood will approve the technical content of the procedure.

For each subsequent unit the procedure will be reviewed to assure that physical differences between the units have been accounted for.

If a technical problem is found with the example procedure, this information will be fed back to the joint test review board and the example procedure corrected.

Tests which have been previously approved will be reviewed against a checklist to assure that the test at least includes all items covered by the original Byron 1 testing program.

To track this testing realignment, a tracking manager has been assigned.

The Braidwood Lessons Learned program which includes findings from Quality Assurance and the NRC at both Byron and Braidwood has been put into place and, where necessary, administrative procedures are being changed to assure alignment between the two units.

The Byron Unit 2 tester, and the Braidwood Startup Superintendent worked closely on the Byron 1 startup.

They agree on the basic method that is belng used to pursue this particular program.

Commitments to the NRC will be reviewed for both units and, subsequently, commitments to the NRC will be made for both units.

In the area of specific concerns, independent verification of jumpers and lifted Icads has been implemented.

A form for documenting minor test change requests is in use.

Checklists are being prepared for the test review board to use in conducting their reviews.

The checklists will be applied to all reviews completed prior to checklist implementation.

A separate verification of compliance with ANSI 18.7 will be completed when the Braidwood Startup Manual has been modified.

(~

w MECHANICAL CONTRACTOR In response to IE Report 83-09, dated July 1984, Commonwealth Edison Company outlined a number of management actions taken by Commonwealth Edison and their Mechanical Contractor, Phillips, Getschow Company.

These management actions addressed the need to improve the Mechanical Contractor quality and regulatory performance.

Since the initial management actions, both Commonwealth Edison and Phillips, Getschow Company have taken additional management actions to improve quality and regulatory performance.

These actions are outlined on the attached presentation slides.

1.

Mechanical Contractor - Late 1983/Early 1984 Actions 2.

Mechanical Contractor - Beyond 1984 Actions 3.

Mechanical Contractor - Recent Actions-1985 4.

Mechanical Contractor - Outside Assessments 5.

Mechanical Contractor - Q.C. Management Evaluation 6.

Mechanical Contractor - Commonwealth Edison Project Management Actions 7.

Mechanical Contractor - Management Feedback Sessions t summary of the actions presented on the above slides j

indicates that nuclear construction experienced people have been added to the Phillips, Getschow Company Project Management, Engineering, and Quality Control Departments.

When Phillips, Getschow Company did not have the expertise in-house, Commonwealth Edison Company obtained nuclear construction experienced people from other nuclear construction experienced organizations, such as Daniel Construction Company.

Installation and inspection procedures were revised and enhanced.

Work Instructions supplemented installation and inspection procedures.

Quality Control increased monitoring of all process activities, warehousing, and housekeeping.

Trend analysis systems were improved and provided feedback to all Phillips, Getschow Company departments.

Data management tools were provided and put in-place, thus allowing more effective management of retrofit and on-going activities.

Other feedback type activities have recently been undertaken to further improve quality and i

regulatory performance.

Lastly, outside assessments have provided further recommendations for quality and regulatory performance improvements.

Commonwealth Edison and Phillips, Getschow Company have been pro-active towards quality and regulatory performance improvements.

Management actions have been or are being taken to achieve an improved SALP rating.

o QUALITY ASSURANCE Braidwood Site Quality Assurances has focused considerable effort toward improving effectiveness in several areas over the past year.

The overall goal has been to continue the improving trend noted at the end of the previous SALP period and achieve a rating of "1"

for this period.

Positive changes have occurred in the area of organization, staf f size and experience, and audit program depth and techniques.

Also there has been increasing interface with the Operating Quality Assurance Group as preoperational testing and system turnover activities become increasingly important.

The nine slides which follow summarize the high points of each of the major areas of change.

We believe these changes place us in a position to achieve a SALP "1"

rating with our current level of effort in the Site QA organization.

0043K

~

n 4

AGENDA MARCH 15, 1985 1.

INTRODUCTION MIKE WALLACE II.

TESTING CHUCK T0MASHEK III.

MECHANICAL CONTRACTOR DAN SHAMBLIN PIPING SAFETY-RELATED EQUIPMENT TOM QUAKA IV.

QUALITY ASSURANCE J

r-e I

AGENDA MARCH 15, 1985 1.

INTRODUCTION MIKE WALLACE L

m e

n al g

jI E i

M 5

a~

-p il i

a i

II$

E e

Er lg!

a li

'.9 El 1

a n

il 1 i s

9 li gg I

e I

oe 8,

gs gl a

s r

=$

3 2

U l

181 1

8

EglI, e,

i y1 '

l Ig l

a

E l

21 1

s a

a

@s h

l 3

a s

5 I

t 9

f O

m II.

TESTING CHUCK T0MASHEK

" - " - ^

na m

~

~ ~~ -.--

e e

  • 6 TESTING CONCERNS BYRON /BNAHMBDS IMENAE l

e l

l I

e I

t l

SPECIFIC CONCERN 5 SAe ss

BRAllWOOD TEST AND STARTUP DENEILOPMEE STARTUP MANUAL & SCHEDULE 151TIALLY TNE SAME STRONGLY CONSIDERED LA SAUJE AND BYRON ORGNNI7ATIOS DEMELGrEE TG ARENEss PROBLEMS

"~

0 EASM2E ErfRan N

i 05ALITY AssuaANCE

\\

MC LESSON LEARNED RE-ALIGNMENT FAMILIAR ACTIVITIES DUPLICATE PROGRAMS 1

I 2004

i lj i

see 00.0 i

felMECT START-up surenturameauf

)

Quack Tomashek Y

l

}

t i

ADRINISTRATIVE ASSISTharr Chris Lenth see 44.0

{

recumcT O.A.o.

recuBCT STRETUF MiEMUWEB SUPERVISQR TEST REVIEW BoRAD -

WESTIaRINDUBE SITE sureEVISING WIGmune TERT Sur M vista Jeha Thunstedt SINSEV18tX WWIM E IN TERN uick Tomis nenk simmerman sill Bryant Mne Asstelps I

see 41.o see 42.0 see 43.0 see 43.0 gesthg i.

9 0

f i

esenarianer mano

! IEll pan

..____r l

TESTIRE RE-ALIGNMENT STARTUP MANUAL REVIEW COMPARE BYRON & BRAIDWOOD BRING BRAIDW00D TO BYRom APPROVE AND IMPLEMENT SUBSEQUENT UNIT TEST PROCEDURE REVIEW i

l EXAMPLE PROCEDURE I

JOINT REVIEW IBBEPEEBERT UNIT REVIEW l

FEEDBACK TO EXAMPLE PROCEDURE PREVI0ssLY APPROVED TESTS INTERFACE TRACKING l

TRACKING PERSONNEL l

BRAIDWOOD LESSONS LEARNED PROCEDURE MODIFICATION AGREEMENT BETWEEN TESTING MANAGEMENT COMMITMENTS TO NRC

SPECIFIC CONCERNS INDEPENDENT VERIFICATION OF JUMPERS AaB LIFTED LEADS FORM FOR MINOR TEST CHANGE REQUESTS TEST REVIEW BOARD CHECKLIST REVIEW 0F COMPLETED TEST REVIEW BOARDS VERIFY COMPLIAECE WITH ANSI 18.7 i

l 1

l l

I I

r

[

l l

_ _ 808s

9 9

e III.

MECHANICAL CONTRACTOR DAN SHAMBLIN PIPING SAFETY-RELATED EQUIPMENT e

MANAGFMENT ATTENTION TO PIPING CONTRACTOR PERFORMANCE I.

-PROJECT REVIEW MEETING PIPING QUALITY CONTROL EFFECTIVENESS WALLACE, FITZPATRICK, SHAMBLIN, QUAKA, VAHLE, SCHROEDER FEBRUARY 14, 1985 3 HOURS II.

PIPING QUALITY CONTROL FEEDBACK SESSION I SHAMBLIN, QUAKA, VAHLE, PHILLIPS, GETSCHOW III.

PIPING QUALITY CONTROL FEEDBACK SESSION II WALLACE, FITZPATRICK AND SESSION I PEOPLE

IV.

PROJECT REVIEW MEETING PIPING AND OTHER QUALITY AREAS FEBRUARY 28, 1985 6 HOURS 69 ITEMS TOP 11 PRIORITY ITEMS V.

BRAIDWOOD PRIORITY ISSUES (BPI) LIST REVIEW WEEKLY GUIDELINES FOR ITEMS ON LIST t

BRAIDWOOD STATION - UNITS 1 & 2 MECHANICAL CONTRACTOR IE REPORT 83-09 ACTIONS LATE 1982 TO MID 1983 IN EARLY 1983, COMMONWEALTH EDIS0N PROJECT MANAGEMENT DETERMINED THE NEED TO SUBSTANTIALLY INCREASE THE LEVEL OF MANAGEMENT TALENT IN THE MECHANICAL CONTRACTORS ORGANIZATION.

THE BRAIDWOOD STATION MECHANICAL CONTRACTOR HIRED A NUMBER OF TOP MANAGEMENT PERSONNEL PREVIOUSLY EMPLOYED BY THE LASALLE COUNTY STATION MECHANICAL CONTRACTOR.

AUGUST 1983 SITE MANAGER ASSISTANT TO SITE MANAGER SITE SUPERINTENDENT STAFF ASSISTANT TO QUALITY CONTROL / ENGINEERING PROJECT ENGINEER SEPTEMBER /0CTOBER 1983 AREA SUPERINTENDENTS ASSISTANT AREA SUPERINTENDENTS 4

AREA GENERAL FOREMAN NIGHT SHIFT SUPERINTENDENT THE MECHANICAL CONTRACTOR ENGINEERING DEPARTMENT WAS STRENGTHENED BY ADDITION OF PROJECT ENGINEER, ASSISTANT PROJECT ENGINEER AND 4 - GROUP SUPERVISORS WITH A COMBINED TOTAL NUCLEAR EXPERIENCE OF 45 YEARS.

MOST OF THESE PEOPLE HAS LSCS EXPERIENCE.

LATER 7 OTHER EXPERIENCED PERSONNEL WERE ADDED TO THE ENGINEERING DEPARTMENT.

(1585A)

BRAIDWOOD STATION - UNITS 1 & 2 MECHANICAL CONTRACTOR IE REPORT 83-09 ACTIONS LATE 1982 TO MID 1983 IMPROVE QUALITY DOCUMENTATION AREA BY " DOCUMENT STATION i'

CONCEPT".

THIS CONCEPT PLACED STANDARDIZED AND STRINGENT CONTROLS OVER ALL PROCESS DOCUMENTS.

THIS SYSTEM EMPLOYED MANY EX-LSCS MECHANICAL CONTRACTOR PERSONNEL.

MECHANICAL CONTRACTOR QUALITY CONTROL ORGANIZATION WAS SPLIT INTO A FIELD SECTION AND AN OFFICE SECTION.

QUALITY CONTROL WORKFORCE INCREASED FROM 57 PEOPLE TO 125 PEOPLE.

A NEW QUALITY CONTROL SUPERVISOR WAS ASSIGNED TO THE BRAIDWOOD SITE MECHANICAL CONTRACTOR.

GENERAL FOREMAN OF FIELD INSPECTIONS WERE APPOINTED TO PROVIDE MORE DIRECT FIELD SUPERVISION.

LEAD QUALITY CONTROL TECHNICIAN POSITION WAS ESTABLISHED AND FILLED IN PART WITH LSCS EXPERIENCED PEOPLE.

NUMBER OF MECHANICAL CONTRACTOR Q.C. TECHNICIANS INCREASED FROM 18 TO 56.

THESE TECHNICIANS INCREASED THEIR INVOLVEMENT IN THE INITIAL AND FINAL REVIEWS OF QUALITY DOCUMENTATION.

NUMBER OF MECHANICAL CONTRACTOR FIELD INSPECTORS INCREASED FROM 25 TO 50.

FULL TIME ON-SITE MECHANICAL CONTRACTOR Q.A. MANAGER AND 3 Q.A. ENGINEERS WERE ADDED IN LATE 1982/EARLY MID-1983.

(1585A)

m-BRAIDWOOD STATION - UNITS 1 & 2 MECHANICAL CONTRACTOR LATE 1983/EARLY MID-1984 ACTIONS EXPERIENCED MECHANICAL CONTRACTOR PERSONNEL ADDITIONS ENGINEERING QUALITY CONTROL (0FFICE AND FIELD)

PRODUCTION REVISED / ENHANCED ALL MAJOR INSTALLATION AND INSPECTION PROCEDURES (LB/SB PIPING, HANGERS, INSTRUMENTATION, WHIP RESTRAINTS, HYDROSTATIC TESTING, MATERIAL CONTROL, EQUIPMENT, ETC.)-

WROTE / IMPLEMENTED NEW INSTALLATION, RETROFIT AND INSPECTION PROCEDURES (CALIBRATION, DOCUMENT DEFICIENCY REPORT, MTV, IRV, IDENTIFICATION OF IN-PROCESS DEFICIENCIES, ETC.)

STARTED IMPLEMENTATION OF VARIOUS DATA MANAGEMENT PROGRAMS.

l l

IMPROVED Q.C. INSPECTION RECORD OF DEFICIENCIES (I.E. 9006 FORM)

INCREASED Q.C. MONITORING ACTIVITIES TO INCLUDE ALL PROCESS ACTIVITIES, WAREHOUSING AND HOUSEKEEPING.

l L

CONTINUED PREVIOUS IMPROVEMENT IMPLEMENTATIONS IN ALL AREAS.

(1585A) i

r 1

BRAIDWOOD STATION - UNITS 1 1 2 MECHANICAL CONTRACTOR HEXOND MID 1984 ACTIONS MECHANICAL CONTRACTOR INSTALLATION / INSPECTION PROCEDURES NUMBER 107 (MID 1983 AT 71 PROCEDURES)

WORK INSTRUCTION NOW SUPPLEMENT PROCEDURES MECHANICAL CONTRACTOR Q.C. PERSONNEL NUMBER 239 (MID 1983 AT 87 Q.C. PERSONNEL)

(MID 1983 NUMBER)

Q.C. MANAGER - 1 (0)

Q.C. SUPERVISOR - 1 (1)

ASST. Q.C. SUPERVISOR - 1 (1)

Q.C. OFFICE SUPERVISORS - 10 (0)

Q.C. LEAD TECHNICIANS - 13 (2)

Q.C. TECHNICIANS - 83 (21/7 TRAINEES)

Q.C. CLERKS - 10 (3)

Q.C. AREA G.F. - 1 (1)

Q.C. G. F. - 5 (1)

Q.C. FOREMAN - 18 (5)

Q.C. INSPECTORS - 99 (29/16 TRAINEES)

PERSONNEL ADDITIONS HAVE BEEN EXPERIENCED IN NUCLEAR CONSTRUCTION WORK OCTOBER 1984 HIRED 6 EXPERIENCED Q.C. SUPERVISORS TO MANAGE SPECIFIC DISCIPLINES.

MODIFIED Q.C. 0FFICE SPACE TO IMPROVE WORKING ENVIRONMENT TO MAINTAIN HIGH MORALE.

(1585A)

BRAIDWOOD STATION - UNITS 1 & 2 MECHANICAL CONTRACTOR BEYOND MID 1984 ACTIONS SIGNIFICANTLY STRENGTHENED THE SPIRIT OF COOPERATION BETWEEN QUALITY CONTROL, ENGINEERING, PRODUCTION AND SITE MANAGEMENT SO ANY TYPE OF PROBLEMS CAN BE IDENTIFIED, QUICKLY ADDRESSED AND CORRECTIVE MEASURES IMPLEMENTED.

IMPLEMENTED IMPROVED TREND ANALYSIS SYSTEM WITH FEEDBACK TO ALL MECHANICAL CONTRACTOR DEPARTMENTS.

STARTED " QUALITY CIRCLES" BETWEEN Q.C. DOCUMENT REVIEW GROUPS, FIELD INSPECTORS AND LEAD PERSONNEL.

HIRED A PROFESSIONAL TRAINER TO ASSIST CRAFT TRAINING EFFORTS WITH EMPHASIS ON PIPING SUPPORT ERECTION ACTIVITIES.

EXTENSIVE DATA MANAGEMENT CAPABILITIES HAVE BEEN IMPLEMENTED FOR PRODUCTION AND QUALITY RELATED RECORDS.

PROJECT MANAGER CONDUCTED SELF-IMPROVEMENT STUDIES THROUGH INTERVIEWS OF PERSONNEL IN ALL DEPARTMENTS.

FEEDBACK OBTAINED IS BEING PUT INTO SPECIFIC IMPROVEMENT ACTION PLANS.

i-(1585A)

I l

BRAIDWOOD STATION - UNITS 1 & 2 MECHANICAL CONTRACTOR RECENT ACTIONS - 1985 Q.C. DEPARTMENT MANAGER PERFORMED A COMPREHENSIVE "NEEDS" ANALYSIS TO IDENTIFY AREAS NEEDING ADDITIONAL PERSONNEL.

REQUEST MADE TO COMMONWEALTH EDIS0N COMPANY FOR 18 ADDITIONAL Q.C. PERSONNEL.

THESE EXPERIENCED PERSONNEL ARE BEING PROVIDED THROUGH DANIEL CONSTRUCTION COMPANY, SCIENCE APPLICATIONS, INC. AND NUCLEAR POWER SERVICES, INC.

MECHANICAL CONTRACTOR IS BEING FURTHER PROVIDED WITH DATA MANAGEMENT TOOLS THROUGH COMMONWEALTH EDIS0N COMPUTER SYSTEMS GROUP.

TWO FULL TIME TRAINERS HAVE BEEN ASSIGNED-F0R CERTIFICATION TRAINING AND ACT AS TECHNICAL ADVISORS FOR PROBLEMS.

THIS RELIEVES SOME BURDENS OF Q.C. INSPECTOR GENERAL FOREMAN AND ALLOWS MORE TIME FOR SUPERVISION OF INSPECTORS.

SITE MANAGEMENT /Q.C. MANAGEMENT CONDUCTED A SERIES OF FEEDBACK SESSIONS WITH ALL DEPARTMENTS.

IDENTIFIED A LISTING OF SELF-IMPROVEMENT ACTION ITEMS.

CONTINUE TO STRESS TO ALL PERSONNEL THE PERFORMANCE OF THEIR JOB IN A QUALITY MANNER.

IN SOME CASES PERSONNEL EMPLOYMENT HAS BEEN TERMINATED FOR LACK 0F QUALITY WORK.

(1585A)

BRAIDWOOD STATION - UNITS 1 & 2 MECHANICAL CONTRACTOR

~

OUTSIDE ASSESSMENTS A.

INSTITUTE OF NUCLEAR POWER OPERATIONS CONSTRUCTION PROJECT EVALUATION - JUNE / JULY 1984.

1.

RECOMMENDATION -

" MANAGERS AND SUPERVISORS SHOULD TAKE INITIATIVES TO BECOME MORE KNOWLEDGEABLE OF AND INVOLVED IN DAY-TO-DAY WORK ACTIVITIES INCLUDING INSTALLATION AND INSPECTION WORK."

RESPONSE - ADDITIONAL EXPERIENCED PERSONNEL ADDED TO MECHANICAL CONTRACTORS ORGANIZATION.

SOME DEPARTMENTS, SUCH AS QUALITY CONTROL, WERE RESTRUCTURED TO ALLOW FOR SPECIFIC PERSONNEL TO HANDLE DAY-TO-DAY ACTIVITIES (Q.C. SUPERVISOR) AND OTHERS TO LOOK AT PROGRAMMATIC ASPECTS (Q.C. MANAGER).

2.

RECOMMENDATION "lMPROVEMENTS REQUIRED IN IMPLEMENTATION OF MECHANICAL CONTRACTOR'S MATERIAL TRACEABILITY VERIFICATION PROGRAM."

RESPONSE - ADDITIONAL EXPERIENCED PERSONNEL ADDED TO SUPERVISE MTV PROGRAM.

FOCUSED TRAINING GIVEN TO PERSONNEL PERFORMING MTV PROGRAM.

3.

RECOMMENDATION "lMPROVE PIPING SUPPORT ACTIVITIES."

RESPONSE - ONG0ING TASK FORCE OF UTILITY, MECHANICAL CONTRACTOR AND ARCHITECT ENGINEER PERSONNEL RECEIVE FEEDBACK ON ALL PIPING SUPPORT ERECTION ASPECTS AND EFFECT IMPROVEMENTS.

SPECIAL AND FOCUSED TRAINING GIVEN TO CRAFT AND Q.C. PERSONNEL.

TREND PROGRAM ACTIVITIES IDENTIFY SPECIFIC PROBLEMS FOR CORRECTIVE ACTION.

4.

RECOMMENDATION "lMPROVE Q.C. INSPECTOR PERFORMANCE."

RESPONSE - ADDITIONAL SUPERVISORY PERSONNEL ADDED TO MONITOR Q.C. INSPECTOR EFFECTIVENESS AND FORWARD TRAINING GIVEN.

FEEDBACK SESSIONS BETWEEN CRAFT AND Q.C. INSPECTORS HELD TO IMPROVE JOB PERFORMANCE.

ONG0ING TASK FORCE CONTINUALLY ADDRESSES Q.C.

INSPECTOR EFFECTIVENESS.

(1585A)

BRAIDWOOD STATION - UNITS 1 & 2 MECHANICAL CONTRACTOR

~

OUTSIDE ASSESSMENTS A.

' INSTITUTE OF NUCLEAR POWER OPERATIONS CONSTRUCTION PROJECT EVALUATION - JUNE / JULY 1984 (CONT.)

5.

RECOMMENDATION -

" IMPROVE CHANGES TO AND REVIEWS OF QUALITY RECORDS."

RESPONSE - ESTABLISHED BETTER RECORDS REVIEW PLANS AND PROCEDURES.

ADDED EXPERIENCED PERSONNEL.

CONDUCT ONG0ING TRAINING SPECIFICALLY FOCUSED TOWARDS RECORDS REVIEWS.

6.

TANGIBLE STRENGTHS "THE MECHANICAL CONTRACTOR'S WELDER QUALIFICATION PROGRAM ENFORCES HIGH STANDARDS FOR PERFORMANCE CAPABILITY.

B.

MECHANICAL CONTRACTOR Q.C. MANAGEMENT EVALUATION REPORT AUGUST 1984 - CORPORATE MANAGEMENT DECIDED TO CONDUCT MANAGEMENT EVALUATION OF BRAIDWOOD SITE Q.C.

ORGANIZATION.

OCTOBER 1984 - MANAGEMENT EVALUATION DELAYED UNTIL RECENT Q.C. ORGANIZATION / ADDITION CHANGES COULD BE COMPLETED.

NOVEMBER 1984 - N.C. KIST & ASSOCIATES, INC.

CONTRACTED TO PERFORM MANAGEMENT EVALUATION.

NOVEMBER / DECEMBER 1984 - MANAGEMENT EVALUATION PERFORMED.

DECEMBER 1984 - MANAGEMENT EVALUATION REPORT ISSUED.

(1585A)

BRAIDWOOD STATION - UNITS 1 1 2 MECHANICAL CONTRACTOR

~

OUTSIDE ASSESSMENTS B.

MECHANICAL CONTRACTOR Q.C. MANAGEMENT EVALUATION REPORT (CONT.)

JANUARY / FEBRUARY 1985 --MECHANICAL CONTRACTOR REVIEW AND DISCUSSION OF REPORT RESULTS IN-HOUSE AND WITH CONSULTANT.

FEBRUARY 1985 - MANAGEMENT EVALUATION REPORT AND ACTION PLAN FORWARDED TO COMMONWEALTH EDISON COMPANY FOR INFORMATION.

a (1585A)

BRAIDWOOD STATION - UNITS 1 & 2 MECHANICAL CONTRACTOR

~

0.C. MANAGEMENT EVALUATION PURPOSE -

CONDUCT A MANAGEMENT EVALUATION OF THE BRAIDWOOD SITE Q.C. ORGANIZATIONAL STRUCTURE AND INTERVIEW SUPERVISORY PERSONNEL FOLLOWING ADDITION OF EXPERIENCED PERSONNEL ADDED TO 1

HANDLE INCREASED SCOPE OF ACTIVITIES DUE TO REVERIFICATION PROGRAMS.

EVALUATION METHODS -

INTERVIEWING PERSONNEL.

ATTENDING STAFF MEETINGS.

DETERMINING SIGNIFICANT RESPONSIBILITIES FROM Q.C. MANUAL.

CHECKING WITH PERSONNEL FOR ASSIGNMENT OF RESPONSIBILITIES.

REVIEWING CURRENT ORGANIZATION CHART.

REVIEWING SAMPLES OF WORK.

REVIEWING RESUME'S.

PERSONNEL INTERVIEWED -

SITE Q.A. COORDINATOR Q.C. MANAGER-l SUPERVISOR - Q.C.

l ADMINISTRATIVE ASSISTANT - Q.C.

t ASST. SUPERVISOR - Q.C. FIELD ASST. SUPERVISOR - Q.C. 0FFICE RECORDS REVIEW SUPERVISOR N5 DATA REPORT SUPERVISOR RETROSPECTION SUPERVISOR MATERIAL CONTROL & CALIBRATION SUPERVISOR DOCUMENT CONTROL SUPERVISOR COMPLIANCE SUPERVISOR SITE MANAGER PROJECT ENGINEER (1585A) i

e BRAIDWOOD STATION - UNITS 1 1 2 MECHANICAL CONTRACTOR

~

0.C. MANAGEMENT EVALUATION CONCLUSIONS AND RECOMMENDATIONS PREPARE A WRITTEN FUNCTIONAL CHART LISTING ALL THE SPECIFIC RESPONSIBILITIES FOR EACH SUB-TIER SUPERVISOR.

DESIGNATE'BY JOB TITLE ONE INDIVIDUAL WHO IS RESPONSIBLE FOR PROVIDING ANSWERS TO CODE & STANDARDS QUESTIONS.

THE BRAIDWOOD SITE Q.C. ORGANIZATIONAL STRUCTURE IS SUITABLE FOR THE INCRCASED SCOPE OF ACTIVITIES.

THE EXPERIENCE OF SITE Q.C. SUPERVISORY PERSONNEL IN NUCLEAR QA/QC IS EXTENSIVE AND ADEQUATE FOR THE SCOPE OF ACTIVITIES.

THE SITE Q.C. SUPERVISION IS TAKING POSITIVE ACTIONS TO IMPROVE THE MANAGEMENT, CONTROL AND INTERFACES OF THE Q.C. FUNCTIONS.

THE CURRENT OFFICE ARRANGEMENTS AND OFFICE SPACES ARE NOT CONDUCIVE TO WORKING EFFICIENTLY.

THE Q.A. MANUAL NEEDS TO REFLECT IN BETTER DETAIL THE CURRENT PROVISIONS FOR VERIFYING THAT CORRECT MATERIAL FOR THE APPLICATION WAS RELEASED AND INSTALLED.

MECHANICAL CONTRACTOR ACTIONS WRITTEN FUNCTIONAL CHART LISTING EACH SUB-TIER SUPERVISOR AND THEIR SPECIFIC RESPONSIBILITIES WILL BE ISSUED IN MARCH, 1985.

OFFICE SPACE IMPROVEMENTS AND GROUPING OF FUNCTIONAL GROUPS HAS BEEN COMPLETED.

THE Q.A. MANUAL IS UNDER REVISION TO REFLECT CURRENT VERIFICATION OF MATERIAL APPLICATION PRACTICES.

(1585A)

e BRAIDWOOD STATION - UNITS 1 & 2 MECHANICAL CONTRACTOR

' COMMONWEALTH EDISON PROJECT MANAGEMENT ACTIONS SEARCHED FOR AND PROVIDED TO THE MECHANICAL CONTRACTOR NULCEAR EXPERIENCED PERSONNEL.

PROVIDED EXTENSIVE DATA MANAGEMENT HARDWARE AND SOFTWARE.

CONDUCTED ONG0ING MINI-EVALUATIONS WITH IN-HOUSE EXPERTISE IN RESPONSE TO INP0 CONSTRUCTION PROJECT EVALUATIONS.

THESE MINI-EVALUATIONS WILL CONTINUE UTILIZING INP0 CRITERIA.

ORGANIZE AND. CHAIR ONG0ING TASK FORCES WHICH LOOK AT SPECIFIC WORK AND INSPECTION ACTIVITIES.

THESE TASK FORCES ARE MADE UP OF COMMONWEALTH EDISON COMPANY, MECHANICAL CONTRACTOR, AND ARCHITECT ENGINEER PRODUCTION, ENGINEERING AND QUALITY CONTROL PERSONNEL.

s 1

(1585A)

BRAIDWOOD STATION - UNITS 1 & 2 MECHANICAL CONTRACTOR

~

MANAGEMENT FEEDBACK SESSIONS IN RESPONSE TO RECENT NRC CONCERNS, COMMONWEALTH EDISON COMPANY STARTED SPECIAL FEEDBACK SESSIONS WITH COMMONWEALTH EDIS0N COMPANY PROJECT FIELD ENGINEERING MANAGER, SITE QUALITY ASSURANCE SUPERINTENDENT AND PROJECT CONSTRUCTION SUPERINTENDENT AND MECHANICAL CONTRACTOR PRODUCTION, ENGINEERING QUALITY CONTROL AND QUALITY ASSURANCE MANAGEMENTS AND SUPERVISION.

PURPOSE PROVIDE. COMMONWEALTH EDIS0N MANAGEMENT A DIRECT AWARENESS OF SUPERVISION AND WORKING LEVEL PERSPECTIVE.

PROVIDE CONTRACTOR PERSONNEL AN OPPORTUNITY FOR SIMULTANEOUS FEEDBACK TO COMMONWEALTH EDIS0N ENGINEERING, CONSTRUCTION AND QUALITY ASSURANCE.

PROVIDE A FORUM FOR SOLICITING CONTRACTOR SUGGESTIONS.

PROVIDE A FORUM FOR COMMUNICATING COMMONWEALTH EDISON SITE MANAGEMENTS PERSPECTIVE ON CRITICAL ISSUES.

PROVIDE AN OPPORTUNITY FOR TEAM BUILDING.

STRUCTURE OF SESSIONS IDENTIFY TOPIC 0F DISCUSSION.

FOCUS ON POSITIVES AND NEGATIVES OF TOPIC.

IDENTIFY OPPORTUNITIES WHICH WOULD CONTRIBUTE TO OVERALL SUCCESS OF TOPIC.

PRIORITIZE OPPORTUNITIES.

DEVELOP VIABLE ALTERNATIVES FOR IMPLEMENTING OPPORTUNITIES.

ASSIGN ACTIONS.

(1585A)

BRAIDWOOD STATION - UNITS 1 & 2 MECHANICAL CONTRACTOR MANAGEMENT FEEDBACK SESSIONS PARTICIPANTS D. L. SHAMBLIN (CONSTRUCTION SUPT.), T. E. QUAKA (Q.A. SUPT.), W. E. VAHLE (FIELD ENG. MGR.)

SUPERVISION STAFF COMMONWEALTH EDISON DEPARTMENTS T. O'CONNOR (PROJ. MGR.), J. CARLSON (Q.C. MGR.),

S. FORBES (0.A. MGR.), J. STEWERT (PROJ. ENG.),

W. NICHOLSON (GENERAL SUPT.)

SUPERVISION AND WORKING PERSONNEL MECHANICAL CONTRACTOR DEPARTMENTS TOPIC OF MECHANICAL CONTRACTOR SESSION

" PIPING QUALITY CONTROL DOCUMENTATION AND INSPECTION ACTIVITIES" "WHAT THINGS IN THE MECHANICAL CONTRACTOR AREA CAN BE DONE TO HELP Q.C. INSPECTORS DO THEIR JOBS BETTER?"

SUGGESTED OPPORTUNITIES FINALIZE AND IMPLEMENT N-5 REVIEW PROGRAM.

IDENTIFY IMPORTANT PROCEDURE CHANGES AND EXPEDITE THEIR APPROVAL.

MINIMIZE PROCEDURE REVISIONS.

REVIEW FLOW 0F WORK FOR ALL ACTIVITIES.

IN SOME CASES, PROVIDE BETTER ENGINEERING DIRECTION.

IMPLEMENT MORE CRAFT TRAINING.

CONTINUE THESE TYPES OF FEEDBACK SESSIONS.

(1585A)

e-,

-e-------h

-w.

q e-

,._y 4----

7 9

-m 94,

e 4 BRAIDWOOD STATION - UNITS 1 & 2 MECHANICAL CONTRACTOR S1!MMARY.

MECHANICAL CONTRACTOR HAS BEEN PRO-ACTIVE COMMONWEALTH EDIS0N HAS DEEN PRO-ACTIVE MECHANICAL CONTRACTOR ORGANIZATIONAL STRUCTURE AND PERSONNEL ARE EXPERIENCED AND TOTALLY CAPABLE OF PERFORMING QUALITY WORK WHEN PROBLEMS IDENTIFIED, " MANAGEMENT" ATTENTION IS DIRECTED TO PROBLEM AND IMPLEMENTATION OF CORRECTIVE ACTION FEEDBACK SESSIONS / QUALITY CIRCLE SESSIONS HAVE STARTED TO IDENTIFY FURTHER OPPORTUNITIES FOR SELF IMPROVEMENT ACTIONS HAVE BEEN/ARE BEING TAKEN TO ACHIEVE A BETTER SALP RATING (G0AL = 1)

(1585A)

e IV.

QUALITY ASSURANCE TOM QUAKA P

(1361D)

-*.-,a.

4

.a.

..,-.,A._A

  • ---.__-__,A_

mh*M

+

    • a4Em h 4ED.mNa s.e,-_m_

m,g_

EO 5

E A

l' gu x,

g g

W w

W.g I E

I l

g i

a g

eiEE 3

ggr e

t 5

3 gg@ 'E si Esi 3

a c;

  • mas

, rig 5 1 E

WG:

E !

i I"E E

33 i

~

1

. I I

I T

~

W s

4 E

Ei

$GE5 E*.E 5 l

55 !

O l

l5',4l I

m 1

8 i

l gla i

i gs g

-8E E

B a

EH E

1

.5 q,H E

gg ij H s

[s,!.

L s..

E s

u q

JI ____I gi-

-Wg E

l

~

j s

i 1,3,lg,y,

,gl 15g

,%g

,,g ji-I-

1 l!I 5sg E

I l

l g

sm8 '8.

8E0 MEI

~

3g5 g

11 1~

I 8

~

t l

l I

~

M PFRIOD 1/R3 THROHCM S/84 0

0.A. RATED "3" WITH IMPROVING TREAD N

ACTIONS BY 0.A. HAVE CONTINUED IN AN EFFORT TO MAKE OUR ORGANIZATION MORE EFFECTIVE

- ~

(2705A)

ma L

.,n.ua

.._a-

-m,

---a a

t e

.e

- ~ ~ ~ -

t e

o e

se MR.IDE AREAS OF CHAMGE S ORGANIZATION 9

STAFF SIZE S STAFF EXPERIENCE S SITE AUDIT PROGRAM e

INTERFACE WITH OPERATING Q.A.

e'y

'% e e om e

nsa

+

L.

4 f

1 (2705A) s

oe

'P&o/2 To i

BRAIDWOOD QUALITY ASSURANCE 2NN#

REPORTING RELATIONSHIPS i

Manager I

Quality Assurance I

Assistant Manager Quality Assurance Braidwood Generel Supervisor 4

~~,

~'

- Quality Assurance Braidwood Superintendent Quality Assurance Audit Office I

Coordinotor Superv.isor j

I I

I

~I l

l Testing Agency Electrical /

HVAC/

Meenical

& Procurement Pre-Ops Structural Suprvisor Site Design

.BCAP Supervisor Supervisor Supervisor Quality Quality Assurance Group Assurance Group l

,1 i

f i

s j

--,m-

~-

l 3

j l

BRAIDWOOD QUALITY ASSURANCE d OJ l

REPORTING RELATIONSHIPS v2#

3[WY Manager Quality Assurance l

Assistant Monoger j

Quality Assurance I

I I

Braidwood l

General Supervisor 4-f',,,

- Quality Assurance Braidwood Supwintendet Quality Assurance Audil Office t

Coordinotor Supervisor I

i s

I s

a Testing Agency Electrical /

Q'jve Current 8 Procurement Pre-Ops Programs Work Sife Design BCAP i

Supervisor Supervisor Supervisor Supervisor evelity ouality AllufenesGroup Assurance Group i

i i

l

[j

~

j 1

4

+

4 BR41u nna ottaaITY AttilRA M letMMES COMPARISGM JARMARY 1984 ll ARCH 1985 ASSaSTANT MANAGER 0

1 SITE QUALITY ASSURANCE 1

1 SUPERINTENDENT SITE QUALITY ASSURANCE GENERAL G

1 SUPERVISOR AUDIT COORDINATOR 0

1 QUALITY ASSURANCE SUPERVISORS 2

4 QUALITY ASSURANCE ENGINEERS /

19 42 IRSPECTORS WELITY ASSURANCA SUPPORT 10 40 (CLERICAL & CONTRACTOR)

TOTAL 32 90*

l

  • INCLUDES 18 BCAP DEDICATED PEOPLE

(

(2705A)

~ - "

. a.-

-. ~

L

_a

_r

-_a6 aa m

w

.-a a.h-a

-..-. -.A a _..

e e

e 9

RDATI1 WOOD OllAl ITY AEstlRAMcF FYPFRIFMCF COMPARISON fAVFRACF YRK_ PER PERKOM)

PERCENT JAllilARY 1984 HARCIL1985 INCRFASE TOTAL EXPERIENCE 8.3 13.4 61 NUCLEAR EXPERIENCE 4.2 7.4 76 00ALITY ASSURANCE /0UALITY 2.7 5.1 89 CONTi}0LEXPERIENCE

~

i i

SLIDE !!!

(2705A) e

,_._r..

______.m.,,,

m,,....,m._.__.-.m.,

4

,o o

AUDIT PROGRAN IMPROVEMENTS 9

ASSIGNED PERMANENT AUDIT COORDINATOR S

PRE-AUDIT PREPARATION

9. MORE INVOLVEMENT.0F AUDIT COORDINATOR / LEAD AUDITORS IN AUDIT S BETTER AUDIT TEAM DEBRIEFINGS S

PROMPT RESOLUTION OF UNACCEPTABLE AUDIT RESPONSES AND CORRECTIVE ACTIONS S

SPECIFIC CORRECTIVE ACTION PROGRAMS INCLUDED IN 1985 AUDIT SCHEDULE

~

1.c_ g 1 _...

(2705A)

IMPROVFD INTERFA5F MITH OPFRATING O_A_

IN THE FORIOWING ARFAS 4 PRE-OP TEST PACKAGE REVIEW ISSUES 0

0.A. COVERAGE OF CONSTRUCTION WORK ON SYSTEMS TURNED OVER FOR TEST 3

0 COVERAGE OF START-UP GROUP l

(

'8 r

a -

a-1 i

I l

(2705A) i

g,

./

r.

EDISON MANAGEMENT IS ORGANIZED STAFFED FUNCTIONING TO FULLY AND ADE00ATEl1 COMPLETE CAP's COMPLETE PRODUCTION EVALUATE ONG0ING WORK ADDRESS ANY NEW CONCERNS r

i AND MEET MARCH, 1986 FUEL LOAD DATE

\\