Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20127D092 + (22:13:46, 12 December 2024)
- ML20127D091 + (22:13:47, 12 December 2024)
- ML20127D090 + (22:13:48, 12 December 2024)
- ML20127D089 + (22:13:48, 12 December 2024)
- IR 05000254/1992022 + (22:13:49, 12 December 2024)
- PNO-III-85-028F, on 850617,decontamination Activities Continued Uneventfully.All Contents of Gloveboxes Removed from Facility,Quantified,Packaged & Transported for Storage Until Final Disposition.To date,20 Ci Am-241 Confiscated + (22:13:52, 12 December 2024)
- ML20127D080 + (22:13:53, 12 December 2024)
- ML20127D079 + (22:13:54, 12 December 2024)
- 05000454/LER-1985-055, :on 850515,containment Floor Drain Isolation Valves 1RF026 & 1RF027 Declared Inoperable When Xomox Valve Manufacturer Reported That Valves Not Seismically Qualified. Brackets Installed on Valves + (22:13:56, 12 December 2024)
- ML20127D076 + (22:13:57, 12 December 2024)
- ML20127D075 + (22:13:58, 12 December 2024)
- 05000374/LER-1992-010-05, :on 920810,MOV Tripped Due to Torque Switch Failure to Trip.Caused by Torque Switch Being Set Too High for SMB-00 Operator.Switch Removed,Inspected & Replaced.W/ + (22:14:00, 12 December 2024)
- ML20127D073 + (22:14:03, 12 December 2024)
- ML20127D072 + (22:14:04, 12 December 2024)
- 05000328/LER-1990-012-01, :on 900822,gas Accumulated in Centrifugal Charging Pump Suction Piping as Result of Gas Stripping in Miniflow Line orifices.Manually-operated Vent Valves Installed in Vertical Lines + (22:14:06, 12 December 2024)
- ML20127D069 + (22:14:07, 12 December 2024)
- ML20127D068 + (22:14:08, 12 December 2024)
- ML20127D065 + (22:14:11, 12 December 2024)
- ML20127D066 + (22:14:11, 12 December 2024)
- ML20127D064 + (22:14:13, 12 December 2024)
- PNO-III-85-049, on 850615,radiographer Received 1,660 Mrems from Disconnected 60-Ci Ir-192 Source After Dismantling Source Guide Tube.No Signs of Radiation Sickness Reported. Region III Will Perform Special Insp After Consultant Rept + (22:14:13, 12 December 2024)
- ML20127D061 + (22:14:14, 12 December 2024)
- ML20127D056 + (22:14:29, 12 December 2024)
- ML20127D055 + (22:14:30, 12 December 2024)
- 3F0685-18, Advises That 841031 Relief Request 120 from ASME Boiler & Pressure Vessel Code,Section XI No Longer Required Since Chilled Water Sys,Including Header,Hydrostatically Tested to Design Pressure + (22:14:31, 12 December 2024)
- ML20127D052 + (22:14:32, 12 December 2024)
- ML20127D051 + (22:14:33, 12 December 2024)
- ML20127D050 + (22:14:34, 12 December 2024)
- ML20127D047 + (22:14:34, 12 December 2024)
- ML20127D046 + (22:14:35, 12 December 2024)
- ML20127D045 + (22:14:35, 12 December 2024)
- 05000425/LER-1992-013-01, :on 920807,discovered Control Room Controls Area Inadequately Attended.Caused by Mental Lapse on Part of balance-of-plant Operator.Operator Counseled Re Importance of Maintaining Station in Controls Area + (22:14:37, 12 December 2024)
- ML20127D041 + (22:14:42, 12 December 2024)
- ML20127D039 + (22:14:43, 12 December 2024)
- RBG-37-989, Application for Amend to License NPF-47,consisting of Proposed TS & Environ Protection Program,For Util Request to Become Licensed Operator of Facility + (22:14:45, 12 December 2024)
- B830718, Forwards Updated Const Status Rept as of 830630.Const 67.8% Completed.Commercial Operation Planned for 860501 + (22:14:47, 12 December 2024)
- ML20127D033 + (22:14:48, 12 December 2024)
- 05000455/LER-1992-003-01, :on 920610,feedwater Alarm Received on Loop SG C,Resulting in Regulating Valve Failing Closed & Manual Reactor Trip.Caused by Failure of Valve Operator Diaphragm. Diaphragms Replaced & Torque Increased + (22:14:50, 12 December 2024)
- ML20127D031 + (22:14:51, 12 December 2024)
- ML20127D030 + (22:14:52, 12 December 2024)
- ML20127D028 + (22:14:53, 12 December 2024)
- ML20127D027 + (22:14:54, 12 December 2024)
- ML20127D026 + (22:14:54, 12 December 2024)
- ST-HL-AE-4193, Forwards Vols 1 & 2 of Level 2 PRA & IPE, in Response to Generic Ltr 88-20,Suppls 1,2,3 & 4 + (22:14:56, 12 December 2024)
- ML20127D025 + (22:14:56, 12 December 2024)
- IR 05000317/1985011 + (22:14:57, 12 December 2024)
- ML20127D021 + (22:14:58, 12 December 2024)
- ML20127D016 + (22:15:02, 12 December 2024)
- ML20127D015 + (22:15:03, 12 December 2024)
- ML20127D014 + (22:15:03, 12 December 2024)
- ML20127D013 + (22:15:04, 12 December 2024)