UFEMABAfh UA I A KI:PLM i DOCKET NO. 50 - 277 DATE JUNE 15,1985 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M. ALD E N ENGINE E R-I N-CH ARGE LICENSING SECTION GENERA) ION DIVISION-NUCLEAR TELEPHONE (2151 841-5022 OPERATING STATUS

1. LMIT MAME: PEACH BOTTOM UNIT 2 i NOTES: UNIT 2 CONTINUED ITS I

I I

2. REPORTING PER1003 M AY, 1985 i

SCHEDULED SHUTDOWN FOR l

l l

3. LICENSED THERMAL POWER (MWT):

3293 I

ITS SIXTH REFUELING ANO I

I i

4. NAMEPLATE RATING (GROSS MWEls 1152 l

MAINTENANCE OUTAGE.

I I

I

5. DESIGN ELECTRICAL RATING (NET MWEl s 1065 I

I I

I

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWEl s 1098 i

l I

i

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE)a 1051 l

l

8. IF CHAEES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONSI
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWEla
10. REASONS FOR RESTRICT 10NS, IF ANYS THIS MONTH YR-TO-MTE CUMULATIVE
11. HOURS IN REPORTING PERIOD 744 3,623 95,615
12. NUMBER OF HOURS REACTOR W AS CRITICAL 0

0 62,283.6

13. REACTOR RESERVE SHUTDOWN TOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINc 0.0 0.0 60,556.6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 lb. GROSS THERMAL ENERGY LENERATED (MWH1 0

0 178,420,001

17. GROSS ELECTRICAL ENERGY GENERATED (MWHI O

O 58,718,660

18. NET ELECTRICAL kNERGY GENERATED (MWHI

-10,067

-36,470 56,225,868

19. UNIT SERVICE FACTOR 0.0 0

63.3

20. UNIT AVAILABILITY FACTOR 0.0 0.0 63.3
21. UNIT CAPACITY FACTOR (USING MOC NET) 0.0 0.0 56.0
22. UNIT Ct.PACITY FACTOR (USING DER NET 1 -

. --.. - 0. 0 -- _.. -. - 0. 4 - -. - -. 5 5. 2 -.

23. LMIT FORCED OUTAGE RATE 0.0 0.0 12.5
24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACHi s SCHEDULED SHUTDOWN FGR REFUELING AND MAINTENANCE, l

STARTED 4/27/84

45. IF SHUTDOWN AT Etc 0F REPORT PERIOD, ESTIMATED DATE OF STARTUP 06/20/85
25. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECA ST ACHIEVED r

INITIAL CRITICALITY INITIAL ELECTRICITY 8506240117 850531 l

PDH ADOCK 05000277

~l COMMERCI AL OPERA TION.

R PDR

(

i o - NEGATIVE VALUE REPORTED FOR CONSIhlENCY WITH FEDERA1 EfER3Y RfYYMWTIl NM") D@3Yb

p --

OPERATING DATA REPORT DOCKET NO. 50 - 278 -

DATE JUNE 15,1985 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (2153 841-5022

~~

QPERATING STATUS

1. UNIT NAMES PEACH BOTTOM UNIT 3 i NOTES: UNIT 3 INCURRED ONE SCHEDULED 1 1

1

2. REPORTING PERIODS M AY, 1985 i

LOAD DROP. UNIT IN POWER l

l l

3. LICENSED THERMAL POWER (MWT):

3293 l

COASTDOWN.

I I

I

4. NAMEPLATE RATING (GROSS MWEl s 1152 l

l l

I

5. DESIGN ELECTRICAL RATING- (NET MWE) 1065 l

1 1

I

e. MAXIMUM DEPENDABLE CAPACITY (GROSS MWEla 1098 i

l I

l

7. MAXIMUM DEPENDA8LE CAPACITY (NET MWE) 1035 l

l

8. IF CNANGES OCCUR IN CAPACITY RATINh5 (ITEMS NUMBER 3 THROUGH 73 SINCE LAST REPORT, GIVE REASONS 8
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWEla
10. REASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH YR-TO-DA T E CUMULATIVE

11. HDURS IN REPORTING PERIOD 744 3,623 91,511

~

12. NUM8ER OF HOURS REACTOR WAS CRITICAL 744.0 2,964.7 67,542.2
13. REACTOR RESERVE SHUTDOWN TOURS 0.0 O.0 0.0
14. HOURS GENERATOR ON-LINc 744.0 2,933.3 65,798.4
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 00

~

14. GROSS THERMAL ENERGY GENEkATED (MWH3 2,062,152 8,285,064 L92,484,872
17. GROSS ELECTRICAL ENERGY GENERATED (MWHI 661,220 2,703,6 63,211,1
18. NET ELECTRICAL ENERGY GENERATED (MWHI 629,440 2,589,956 60,699.258
19. UNIT SERVICE F ACTOR 100.0 81.0 71.9
20. UNIT AVAILABILITY FACTOR 100.0 41.0 71.9
21. UNIT CAPACITY FACTOR (USING MDC NET) bl.7 69.1 64.1

_ A22._ UNI T_ CAPACI T Y. FA CTOR dUSI NG. DER _ AeF.T1 29 A A7.1 A2.3

23. ' UNIT FORCED OUTAGE RATE 0.0 1.1 7.2
24. SHuTD0 tees SCHEuuLED DVER NdXT 6 MONTHS (TYPSE DATE AND DURATION OF EACHis McFUELING AND HAINTENANCE OUTAGES FROM 6/28/85 FOR 8 WEEKS UNTIL 8/27/85.
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP s
24. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONI FORECAST ACHIEVED INITIAL CRITICALITY

~

INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE JUNE 15,1985 COMPANY PHILADELPHI A ELECTRIC COMPANY W.M. AL D EN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH MAY 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-N ET )

(MWE-NET) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 O

16 0

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE JUNE 15,1985 COMPANY PHILADELPHIA ELECTRIC COMPANY W.H.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-502,2 MONTH MAY 1985 DA Y AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-N ET)

(MWE-NET) 1 89 2 17 815 2

888 18 852 3

885 19 842 4

883 20 838 5

881 21 840 6

881 22 839 7

879 23 826 6

874 24 826 9

875 25 822 10 87 2 26 8 17 11 869 27 813 12 829 28 809 13 869 29 808 14 860 30 806 15 820 31 805 16 811

s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 2T7 UNIT NAME PEACH BOTTOM UNIT 2

+

DATE JUNE 15,1985 RE PORT MONTH MAY, 1985 COMPLETED BY PHILADELPHI A ELECTRIC COMP N W.M.ALDEN ENGINE ER-IN-CH ARGE LICENSING SECTION GENERATION DIVISION-MJCLEAR TELEPHONE (215) 841-5022 l

l I

I l METHOD OF l L ICENS EE ISYSTEMICOMPONENTl CAUSE AND CORRECTIVE I

lTYPEIDURATIONIRE ASONISHuTTING DOWN!

EVENT l CODE I CODE l ACTION TO

'NO.I DATE I (131 (HOUR $ll (2) i RE ACTOR ( 3 ) l REPORT 8 I (4) l (5) l PREVENT RECURRENCE 1

1 I

I I

I I

I I

1 i R50501 1 5 1 744.0 I

C i 1

1 NA I RC 1 FUELXX l SHUTDOWN FOR ITS SIXTH REFUELING, MAINTENANCE, I

l l

l 1

l l

l l AND MAJOR MODIFICATION DUTAGE.

1 I

I I

I I

I i

1 l

l l 744.0 l

I I

l l

1 (1)

(2)

(3 )

(4)

J - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS 3 - SCHEDUL ED A - EQUIPMENT FAILURE (EXPLAIN) 1 - M ANUAL FOR PREPARATIDt OF DATA 8 - MAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (NUREG-01613 E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPL AINI H - OTHERIEXPLAIN)

EXHIBIT I - S AME SOURCE 9

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 278 UNIT NAME PEACH 80TTOM UNIT 3 DATE JUNE 15,1985 REPORT MONTH MAY, 1985 COMPLETED SY PHILADELPHIA ELECTRIC COM N W.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLE AR TELEPHONE (215) 641-5022 1

l l

.1 I METHOD OF l LICENSEE 15YSTEMICOMPONENTI CAUSE AND CORREGTIVE I

ITYPElDURATIONIRE ASONISHUTTING DOWN!

EVENT l CODE I CODE I ACTION 10 10 8 DATE I ( t il ( HOUR 581 (2) i RE ACTOR (3) l REPORT e I (4) l (5) l PREVENT RECURRENCE I

I I

I I

I I

I I

O I c50512 I S I 000.0 l

F l 4

i N/A l RC i ZZZZZZ l LDAD REDUCTION FOR CONTROL ROD ADJULTMENT.

I I

i -- 1 I

I I

I I

1 I

I I

I I

I I

I S

1 1

s (1)

(2)

(3)

(4)

J - FORCED REASCN METHOD EXHISIT G - INSTRUCTIONS 5 - SCHEDULED A - EQU]P9ENT FAILURE (EXPLAIN) li-M ANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - M ANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - P,EFUELING 3 -' AUTOMATIC SCRAM.

EVENT REPORT (LER)

' O,hEGuijiORY RESTRICTION 4 -- OTHER (EXPLAIN)

FILE (NOREG-01613 E - OPERAjOR TRAINING + LICENSE EXAMINATION F..- ADMITNSTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPL AIN)

EXHIBIT I - SAME SOURCE q.

-, ~ -,. -

y Dockot No. 50-277 Attach 2cnt to:

Monthly Operating Report for May, 1985 REFUELING INFORMATION 1.

Name of facility:

Peach Bottom Unit 2 2.

Scheduled date for next refueling shutdown:

April 27, 1984 - In progress 3.

Scheduled date for restart following refueling:

June 20, 1985 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes If answer is yes, what, in general, will these be?

Amendment #108 was issued March 19, 1985.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

Reload 6 license amendment was issued March 19, 1985.

6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

Not applicable.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool i

4 i

(a)

Core - 764 Fuel Assemblies to be returned from fuel pool (b)

Fuel Pool - 1170 Fuel Assemblies, 58 Fuel Rods

~

8.

The present license ~d spent fuel pool storage capacity and the size of any: increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies The spent fuel pool storage capacity has.been relicensed for 2816 fuel assemblies.

.9.

The projected'date of the last-refueling that can be discharged to the spent fuel pool assuming the present licensed ~ capacity.

September, 1990 (March, 1986, with reserve full core discharge) t n-

.~s

. ~,,

y,

-,,n,

w Docket No. 50-278

..._a

. Attach 22nt to Monthly Operating Report for May, 1985 4

REFUELING INFORMATION 1.

Name of' facility Peach.Botton Unit 3 2.-

Scheduled date for next. refueling shutdown:

June.28, 1985

-3.

Scheduled ate for' restart following refueling:

August 27, 1985 4.

Will refueling or resumption of operation thereafter require.a technical specification change or other license amendment?

Yes.

i l

r If answer is'yes, yhat, in general', will-these be?

d

}-

3 O'

. Technical',Specificatidne, to accommodate reload fuel.

Modifications to react 0h cor4 operating limits.

y, g

x 6.

5. -Scheduled date(s) for submitting proposed liceinsing action and supporting information

<v f

MAPLHGR<Lisits. Submitted' January 7, 1985I Addition'al' Core Limits Information-- Aprihll2, 1985

.+

6.

Important-licensing considerations associated with refueling, e.g.,:new.or different fuel, design'or: supplier, unreviewed design or: performance analysis-methods,-significant changes in< fuel design, new2 operating procedures None~ expected.

7.

The number'of fuel assemblies-(a) in-the core and (b) in the spentW ?

fuel storage pool:

q 1

.(a)

< Core

.764 Fuel Assemblies (b)

Fuel' Pool -il212 Fuel Assemblies,

6. Fuel' Rods

.8."*'_The present licensed spent fuel.-pool storage capacity,and the size of any increase inLlicensed storage capacity that has been

-requested-or is, planned,.in number'of. fuel ~ assemblies:,

~

a

The spent?fuellpool storage capacity has been relicensed;for-2816 fuel assemblies.

J : i,.

9.

.The projected date of.the'last refueling:that can be discharged to-thez spent fuel pool assuming L the present licensed' capacity.

' September,11991 (Nhrch, 1987, with reserve for

. full; core discharge):

.g.

w d..

Docket Non. 50-277/50-278 Attachment to Monthly Operating Report for May, 1985 Peach Bottom Atomic Power Station Narrative Summary of Operating Experiences 4-May, 1985 UNIT 2 The Refueling / Pipe Replacement outage continued throughout the month of May.

The principal work items during the month were:

fuel loading and core verification; installation of the steam separator and steam dryer; the Emergency Service Water (ESW) piping flush; inspection of the

'B' and

'D' core spray pumps; vessel hydrostatic pressure testing; and installation of the reactor vessel head.

Preparations were being made for the drywell Integrated Leak Rate Testing (ILRT) at the end of the report period.

UNIT 3 l

The unit began the month limited to 89% power due to end-of-cycle coastdown.

On May 12, load was reduced to 41% power to accommodate control rod pattern adjustment and Main Steam Isolation Valve (MSIV) closure time testing, j

On May 15, the inner seal on the 3B recirculation pump failed.

Power was reduced to 81% until May 17 in an effort to determine if pump speed and seal performance were related.

No change in seal performance occurred.

The operating seal parameters continue to be monitored for signs of deterioration.

I By the end of the report period, power was reduced to 81% due to l

end-of-cycle coastdown.

/SLZ

~

r PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 215 e41400o June 14, 1985 Docket Nos. 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Attention:

Document Control Desk c

SUBJECT:

Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:

Attached are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of May, 1985 forwarded pursuant to Technical Specification 6.9.1.C under the guidance of Regulatory Guide 10.1, Revision 4.

Very truly yourr, R. H. Logue Superintendent Nuclear Services Attachment cc:

Dr. T. E. Murley, NRC Mr. T.

P. Johnson, Resident Inspector Mr. Stan P. Mangi, Dept. of Envir. Resources Mr.

P. A.

Ross, NRC (2 copies)

INPO Records Center ZE xt 7/