Text
, _ . .
.
. - - - . _ - . . . . . _ _ .
- ~ .
- - .
- .
- - - - - - . .
. . . -
_ _ . .
.
,
!
UNitiD StM ES
[p* MiagIg
NUCLEAR REGULATORY COMMISSION
.
j'
fy
j
ntoiou av
f
611 RY AN PL AZA DRIVE, Sulf E 400
o
g' <
f'
anuNotoN itxAs 76011 eose
!
'****
f/W l l 1993
"
Docket:
50-285
License:
OPR-40
i
,
Omaha Public Power District
ATTN:
W. G. Gates, Division Manager
Nuclear Operations
444 South 16th Street Hall
Mail Stop BE/EP4
-
Omaha, Nebraska 68102-2247
SUBJECT:
NRC INSPECTION REPORT 50-285/92-32 (NOTICE OF VIOLATION)
1his refers to the inspection conducted by Mr. A. D. Gaines of this office
December 14-18, 1992.
The inspection included a review of activities
'
authorized for your Fort Calhoun Generating Station. At the conclusion of the
inspection, the findings were discussed with you and those members of your
staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. The
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observation of activities in progress.
The inspection findings are documented in the enclosed inspect 4 )n report.
We also reviewed the circumstances surrounding Radiological Occurrence
Report 92-300 and your subsequent Root Cause Analysis Report concerning the
uptake of transuranics by one individual.
We commend you for your willingness
to confront the issues of transuranics and their implications for your plant.
'
The thoroughness of your review of this incident was notable.
The results of
our review are discussed in Section 7 of the enclosed report.
Your Root Cause
Analysis Report identified seven violations. Normally, in matters such as
this, we would exercise discretion in accordance with the NRC Enforcement
Policy and not cite these seven violations because they were self identified.
Even though we do not believe this matter to be indicative of a programmatic
breakdown, we are concerned with the large number of barriers that broke down
and led to the internal exposure. Also, one of violations identified was a
repeat of a violation i' itified in NRC Inspection Report 50-285/92-07.
Therefore, based on the results of this inspection, a Notice of Violation
(Notice) is issued herewith.
You are required to respond to this letter and should follow the instructions
.
specified in the enclosed Notice when preparing your response.
In your
respon_se, you should document the specific actions taken and any additional
actions you plan to prevent recurrence.
After reviewing your response to this
Notice, including your proposed corrective actions and the' results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
.
140C B1
1
9301150064 930111-
}' '
ADOCK 05000285
g
G
-
..
_
. .
-
.
_
..
~
.
. .
..
. - _ . - ..-
- _
- ..
- _
....
- -_.
-.- .._.-. . - .- - . . _ - - -. -_-_. .. .-.
.
.
-
.
.
Omaha Public Power District
-3-
bec to DMB (IE06)
bec distrib. by RIV:
J. L. Milhoan
B. Murray, DRSS/flPS
A. D. Gaines, DRSS/flPS
Section Chief, DRP/TSS
1
Resident inspector - Fort Calhoun Station
,
MIS System
DRSS/FIPS File
RIV file
Lisa Shea, RM/ALF (MS MNBB 4503)
S. Bloom, NRR Project Manager (MS 13 H3)
,
A
L,,w.A
[ JfDhkEM
- RIV:FIPS W [.e
C:flPS M ,
0:DRSS
/
ADGaines:nh
BMurray k(tdJCallan k ..ABffe\\pch
8 /9 /93
/ / f /U
\\ _ /d/9]
t7(k g
'
/
_.
-.eww.,-,
7,
,
,
n
._
y
.,.
__..-.-_%.+p
y
.
---ew+yy
.4-.-g
. , ,
,ws
.-
w.,3
.
.
-
.
Omaha Public Power District
-2-
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
',
9.
L. J.
illan, Director
Divisi n of Radiation Safety
and Safeguards
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendir B - NRC Inspection Report
50-28b/92-32
cc w/ enclosures:
LeBoeuf, Lamb, Leiby & MacRae
ATIN: Harry H. Voigt. Esq.
1875 Connecticut Avenue, NW
Washington, D.C.
20009-5728
l
Washington County Board
of Supervisors'
ATTN: Jack Jensen, Chairman
l
Blair, Nebraska 68008
l
Combustion Engineering, Inc.
-ATTN:
Charles B. Brinkn.., Manager
Washington Nuclear Operations
'
12300 Twinbrook Parkway, Suite 330
u
l
Rockville, Maryland 20852
Nebraska Department of Health
ATIN: Harold Borchert, Director
Division of Radiological Health
301 Centennial Mall, South
y
P.O. Box 95007
Lincoln, Nebraska 68509-5007
fort Calhoun Station
.
L
ATTN:
T. L. Patterson, Manager
P.O. Box 399
'
Fort Calhoun, Nebraska 68023
l
l
-
-
.
.
Omaha Public Power District
-3-
bec to DMB (IE06)
bcc distrib. by RIV:
J. L. Milhoan
B. Murray, DRSS/FIPS
A. D. Gaines, DRSS/FIPS
Section Chief, DRP/TSS
Resident inspector - Fort Calhoun Station
MIS System
DRSS/FIPS File
-
RIV File
Lisa Shea, RM/ALF (MS MNBB 4503)
S. Bloom, NRR Project Manager (MS 13 H3)
_
/
_-
RIV:FIPS W [.e
C : FIPS 'Y$S ,
D:DRSS
'[ MQkW
ADGaines:nh
BMurray 0# (/ dJCallan k. .ABBepch
' / V / 9)
//W/93
\\ /4/Q3
't7Ik /RT
- _ _ _ .-_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -