Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BSEP-93-0006, Provides Addl Info as Suppl to Response to Notice of Violation Re Insp Repts 50-324/92-32 & 50-325/92-32, Submitted in Ltr + (21:13:30, 12 December 2024)
- ML20127J791 + (21:13:30, 12 December 2024)
- ML20127J789 + (21:13:31, 12 December 2024)
- IR 05000461/1985029 + (21:13:32, 12 December 2024)
- ML20127J787 + (21:13:32, 12 December 2024)
- 05000409/LER-1985-007, :on 850412,after Reactor Vessel Hydrostatic Test Performed,Alternate Core Spray Sys Noticed to Be Manually Lined Up to River,Rather than Reactor Vessel.Caused by Personnel Error.Procedure Modified + (21:13:34, 12 December 2024)
- ML20127J784 + (21:13:35, 12 December 2024)
- ML20127J783 + (21:13:36, 12 December 2024)
- ML20127J782 + (21:13:37, 12 December 2024)
- ML20127J781 + (21:13:37, 12 December 2024)
- ML20127J780 + (21:13:38, 12 December 2024)
- ML20127J778 + (21:13:38, 12 December 2024)
- ML20127J777 + (21:13:39, 12 December 2024)
- ML20127J776 + (21:13:40, 12 December 2024)
- ML20127J773 + (21:13:40, 12 December 2024)
- 05000263/LER-1985-008, :on 850411,turbine Control Sys Initiated Scram When Phase Fault Occurred.Caused by Personnel Neglecting to Remove Grounding Cables After Completion of Maint Activity. Substation Relaying Will Be Modified + (21:13:42, 12 December 2024)
- ML20127J771 + (21:13:43, 12 December 2024)
- ML20127J770 + (21:13:44, 12 December 2024)
- ML20127J769 + (21:13:45, 12 December 2024)
- ML20127J768 + (21:13:45, 12 December 2024)
- ML20127J764 + (21:13:46, 12 December 2024)
- ML20127J765 + (21:13:46, 12 December 2024)
- ML20127J763 + (21:13:47, 12 December 2024)
- IR 05000324/1985002 + (21:13:51, 12 December 2024)
- ML20127J761 + (21:13:51, 12 December 2024)
- ML20127J759 + (21:13:52, 12 December 2024)
- ML20127J757 + (21:13:53, 12 December 2024)
- 05000369/LER-1992-012-02, :on 921116,RWST Transmitter Determined to Be Past Inoperable.Caused by Possible Inappropriate Action & Defective Procedure.Suppl Rept Will Be Submitted When Investigation Completed + (21:13:55, 12 December 2024)
- RBG-21278, Interim Deficiency Rept DR-301 Re Altered Torque Switch Limiter Plates on Motors Supplied by Limitorque for motor- Operated Valves.Next Rept Will Be Provided by 850618 + (21:13:56, 12 December 2024)
- ML20127J753 + (21:13:56, 12 December 2024)
- ML20127J750 + (21:13:57, 12 December 2024)
- ML20127J751 + (21:13:57, 12 December 2024)
- ML20127J749 + (21:13:58, 12 December 2024)
- ML20127J747 + (21:13:59, 12 December 2024)
- 05000244/LER-1985-009, :on 850408,during Secondary Sys Pressure Transient,Condensate Bypass Valve Automatically Opened Causing Turbine to Trip.Caused by Condensate Bypass Valve Switch in Automatic Position + (21:14:00, 12 December 2024)
- ML20127J745 + (21:14:01, 12 December 2024)
- ML20127J743 + (21:14:02, 12 December 2024)
- ML20127J742 + (21:14:03, 12 December 2024)
- ML20127J741 + (21:14:03, 12 December 2024)
- ML20127J740 + (21:14:04, 12 December 2024)
- ML20127J739 + (21:14:04, 12 December 2024)
- ML20127J738 + (21:14:05, 12 December 2024)
- ML20127J732 + (21:14:06, 12 December 2024)
- ML20127J737 + (21:14:06, 12 December 2024)
- ML20127J731 + (21:14:07, 12 December 2024)
- ML20127J730 + (21:14:08, 12 December 2024)
- ML20127J727 + (21:14:09, 12 December 2024)
- RBG-21273, Discusses Insp & Maint Programs to Assure Applicability of Flooding Analysis for man-made Portions of West Creek,Per Util 850528 Commitment.Encl Revs Will Be Included in Future Amend to FSAR + (21:14:09, 12 December 2024)
- ML20127J724 + (21:14:10, 12 December 2024)
- BSEP-85-0527, Responds to NRC Re Violations Noted in Insp Repts 50-324/85-02 & 50-325/85-02.Corrective Actions:Fluke Digital Thermometer Installed to Continuously Monitor Calibr Room Temp & Temp Readings Recorded Routinely + (21:14:11, 12 December 2024)
- ML20127J723 + (21:14:11, 12 December 2024)