$saysCIS 101 Cahfornia Street, Suite 1000, San Francisco, CA 94111-5894 415 397-5600 May 2, 1985 84042.37 Mrs7 Juanita Ellis President, CASE 1426 S. Polk Dallas, Texas 75224
Subject:
Transmittal Numbers for ASLB Letters Texas Utilities Generating Company Comanche Peak Steam Electric Station Independent Assessment Program-Phase 3 Job No. 84042
Dear Mrs. Ellis:
As part of Cygna's Phase 3. review effort, we have maintained two outgoing correspondence logs - one for general review correspondence and one for ASLB related correspondence.
Both logs begin with the number 84042.
The difference between the two numbering schemes is that all general review correspondence is preceded by a zero and begins with sequence number 001.
The ASLB numbering system begins with 01 and is not preceded by a zero beyond the number 9.
While recently reviewing our files, we noticed that the numbering sequence for the ASLB outgoing correspondence did not follow this rule.
As a result, we have revised our ASLB log and are transmitting both the old and new versions for your reference.
If you require any clarification, please call.
Very truly yours, N.H. Williams
~ Project Manager NHW/ta Attachments cc:
Mr.
S. Treby (USNRC) w/a Mr. J. Bedding (TUGCO) w/a Mr. J. Beck (TUGCO) w/a
-Mr. D. Pigott w/o a Ms. J. Amerongen (EBASCO)w/a Mr. S. ' Burwell.
1 (USNRC)w/a Ms. V. Noonan (USNRC)w/a 323b
.BW S.,,,. _,
e.,.n c~.9 6 M6 8505210556 850502 PDR ADOCK 05000445 5p-Vh A
Outgoing Correspondence
[
t i mum"*****
Log Pmmet Independent Assessment Program-Phase III Job No.
84042 pag. 1 og Chant. Texas Utilities Services, Inc.
Fue lndex No.
15.2 Ndter Date Sutoct 01 2/14/84 TO:
D.H. Wade /TUSI RE:
CASE Request for Documents 02 3/2/84 TO:
J.
Ellis/ CASE RE:
Response to CASE Questions 03 3/7/84 TO:
J.
Ellis/ CASE RE:
Response to CASE Questions 04 3/9/84 TO:
J.
Ellis/ CASE RE:
Response to CASE Questions 05 3/13/84 TO:
J.
Ellis/ CASE RE:
Response to CASE Ques': ions 06 3/14/84 TO:
J.
Ellis/ CASE RE:
Response to CASE Questions i
07 3/15/84 To:
J.
Ellis/ CASE RE:
Response to CASE Questions 08 4/16/84 TO:
J.
Ellis/ CASE RE:
Response to CASE Questions 09 4/17/84 TO:
J.
Ellis/ CASE RE:
Response to CASE Questions 10 4/18/84 TO:
J.
Ellis/ CASE RE:
Response to CASE Request dtd. 4/17/84
Outgoing R W I'S E D OG Correspondence 4
Job No.
84042 p g.
2 og Independent Assessment Program-Phase III Pmisct Cuent Texas Utilities Services, Inc.
Fneindex No.
15.2 Number Date Sutvect 11 5/15/84 TO:
J. Ellis/ CASE RE:
Telecon Transmittal #1 12 5/16/84 TO:
J. Ellis/ CASE RE:
Telecon Transmittal #2 13 5/23/84 TO:
J. Ellis/ CASE RE:
Telecon Transmittal #3 14 5/31/84 TO:
J.
Ellis/ CASE RE:
Telecon Transmittal #4 15 6/1/84 TO:
J. Ellis/ CASE RE:
Telecon Transmittal #5 16 6/1/84 TO:
J. Ellis/ CASE RE:
Responses to Cygna Pipe Support
& Pipe Stress Questions 17 6/18/84 TO:
J. Ellis/ CASE RE:
Telecon Transmittal #6 j
18 6/18/84 TO:
J. Ellis/ CASE RE:
Gibbs & Hill Response to Pipe Stress Questions 19 6/19/84 TO:
J. Ellis/ CASE RE:
Gibbs & Hill Responses to Pipe Stress Questions 20 6/21/84 TO:
J. Ellis/ CASE RE:
Telecon Transmittal #7
. ses4.oo
Outgoing
~
REVISED LOG Correspondence Lk (
i a Prosect Independent Assessment Program-Phase III ace No.
84042 Peee 3
of c h nt Texas Utilities Services, Inc.
File index No.
15.2 Number Does Subsect 21 6/23/84 TO:
J.
Ellis/ CASE RE:
Telecon Transmittal #8 22 6/23/84 TO:
J. Ellis/ CASE RE:
Responses to Cygna Pipe Support Questions 23 6/30/84 TO:
J. Ellis/ CASE RE:
Transmittal of Responses to Pipe Support and Pipe Stress Questions 24 7/24/84 TO:
J. Ellis/ CASE RE:
Telecon Transmittal #9 25 7/31/84 TO:
J. Ellis/ CASE RE:
Telecon Transmittal #10 26 8/6/84 TO:
J.
Ellis/ CASE RE:
Responses to Cygna Design Control, Pipe Support, and Pipe Stress Questions 27 8/16/84 To:
D.
Pigott/OH&S RE:
ASLB Request for Clarification on Phase,3 Report 28 8/29/84 TO:
J.
Ellis/ CASE RE:
Communication Report Transmittal #11 29 8/31/84 TO:
J.
Ellis/ CASE RE:
Communications Report Transmittal #12 30 10/3/84 TO:
J. Ellis/ CASE RE:
Responses to Cygna Desion Control, Pipe Support, and Pipe Stress Questions ees.oo
Outgoing rrMW ONO kk k &
REVISED LOG Job No.
84042 page 4
og Independent Assessment Program-Phase III monet Chant Texas Utilities Services, Inc.
Fusindex No.
15.2 hmber Dale Sutvect 31 10/11/84 TO:
J. Ellis/ CASE RE:
Telecon Transmittal #13 32 11/13/84 TO:
J. Ellis/ CASE RE:
Communications Report Transmittal #14 33 11/28/84 TO:
J. Ellis/ CASE RE:
Responses to Cygna Questions from the IAP Reviews 34 11/28/84 TO:
J.
Ellis/ CASE RE:
Communications Report Transmittal #15 35 2/19/85 TO:
J.B.
GEORGE /TUGCO RE:
Stability of Pipe Supports (REISSUED W/ No. 84042.027 File 2.2.1) 36 3/25/85 TO:
J.W.
Beck /TUGCO RE:
Phase 3 Open Items - Cinching of U-Bolts (REISSUED W/ NO. 84042.028 File 2.2.1) 9084.00
. ~. -. -.. - - -. -. -...,. -.
~
Outgoing
,f 4L(
0 Correspondence i
h
[rvi 111 "U
ASLB HEARINGS N'*
1 Independent Assessment Program - Phase III **"" 84042 Pmpd File index N Texas Utilties Services, Inc.
15.2 1
Number Date Subiect 01 2/14/84 TO:
D.H. Wade /TUSI FROM:
N. Williams i
RE:
CASE Request for Documents 02 3/2/84 TO:
J. Ellis/ CASE FROM:
N. Williams RE:
Response to CASE Questions 03 3/7/84 TO:
J. Ellis/ CASE FROM:
N. Williams RE:
Response to CASE Questions 04 3/9/84 TO:
J. Ellis/ CASE FROM:
N. Williams RE:
Response to CASE Questions 05 3/13/84 TO:
J. Ellis/ CASE FROM:
N. Williams RE:
Response to CASE Questions 06 3/14/84 TO:
J. Ellis/ CASE FROM:
N. Williams RE:
Response to CASE Questions 07 3/15/84 TO:
J. Elllis/ CASE FROM:
N. Williams RE:
Response to CASE Questions l
08 4/16/84 TO:
J. Ellis/ CASE FROM:
N. Williams RE:
Response to CASE Questions 09 4/17/84 TO:
J. Ellis/ CASE FROM:
N. Williams RE:
Response to CASE Questions 10 4/18/84 TO:
J. Ellis/ CASE FROM:
D. Oldag RE:
Response to CASE Request dtd. 4/1,7/84 I
11 5/15/84 TO:
J. Ellis/ CASE FROM:
N. Williams RE:
Telecon Transmittal #1 1
12 5/16/84 TO:
J. Ellis/ CASE FROM:
N. Williams RE:
Telecon Transmittal #2 1
-.. ~.
LJtgOIng D
COrreSPOndenCO
[
O G b
(_ o G log
-AStE HEAR 1NaS 84042 h*'
2 of Pmpa Independent Assessment Program - Phase III
- h*-
File index No.
15.2 cue
- Texas Utilities Services, Inc.
subact b
Date 013 5/23/04 TO:
J.Ellis/ CASE FROM: N. Williams RE:
Telecon Transmittal f3 814 5/31/84 TO:
J. Ellis/ CASE FROM: N. Williams j
RE:
Telecon Transmittal #4 jr15 6/1/04 TO:
J. Ellis/ CASE FROM: N. Williams RE:
Telecon Transmittal #5 s016 6/1/84 TO:
J. Ellis/ CASE FROM: N. Williams RE:
Responses to Cygna Pipe Support
& Pipe Stress Questions
- F17 6 A8 /84 TO:
J. Ellis/ CASE FROM: N. Williams RE:
Telecon Transmittal #6 Ellis/ CASE FROM: N. Williams J.
s516 6/18/84 TO:
Gibbs & Hill Response to Pipe Stress Questions RE:
l J. Ellis/ CASE FROM: N. Williams s&19 6/19/84 TO:
Gibbs & Hill Responses to Pipe Stress Questions RE:
l i
f WF20 6/21/84 TO:
J. Ellis/ CASE FROM:
N. Williams l
RE:
Telecon Transmittal #7 421 6/23/84 TO:
J. Ellis/ CASE FROM:
N. Williams RE:
Telecon Transmittal #8 h
WP 2 6/23/84 TO:
J. Ellis/ CASE FROM:
N. Williams 2
Responses to Cygna Pipe Support Questions RE:
J. Ellis/ CASE FROM:
N.' Williams MD23 6/30/84 TO:
Transmittal of Responses to Pipe Support and RE:
Pipe Stress Questions s(24 7/24/84 00:
J. Ellis/ CASE FROM: N. Williams RE:
Telecon Transmittal #9 l
9034.00
. ~.. -
..l Udtgoing 9
Correspondence
(
mammmmImm,u OLO LOC Log A**
3 heNa 84042 Independent Assessment Program - Phase III Pmpd client Texas Utilities Services, Inc.
15.2 SW Nunter Date A25
'7/31/84 TO:
J. Ellis/ CASE FROM:
N. Williams RE:
Telecon Transmittal #10 JG6 8/6/84 TO:
J. Ellis/ CASE FROM:
N. Williams RE:
Responses to Cygna Design Control, Pipe Support, and Pipe Stress Questions 427 8/16/84 TO:
David Pigott/OH&S FROM:
N. 'illliams RE:
ASLB Recuest for Clarification on Phase 3 Report e628 8/29/84 TO:
J. Ellis/ CASE FROM:
N. Williams RE:
Communication Report Transmittal #11 429 8/31/84 TO:
J. Ellis/ CASE FROM:
N. Williams RE:
Communications Report Transmittal #12 E30 10/3/84 TO:
J. Ellis/ CASE FROM:
N. Williams RE:
Responses to Cygna Design Control, Pipe support, and Pipe Stress Questions A31 10/11/84 TO:
J. Ellis/ CASE RE:
Telecon Transmittal #13
/G2 11/13/84 TO:
J. Ellis/ CASE FROM:
N. Williams RE:
Communications Report Transmittal #14 l
g33 11/28/84 TO:
J. Ellis/ CASE RE:
Responses to Cygna Questions from the IAP l
Reviews l
j 34 11/28/84 TO:
J. Ellis/ CASE s
RE:
Communications Report Transmittal #15
- 35 02/19/85 TO:
J.B. George /TUGCO f
- F RE
Stability of Pipe Supports
\\
kmn',sv J-aja-
? Q o ((2.
O ) ]
d'36 03/25/85 TO:
J.W. Beck /TUGCO RE:
Phase 3 Open Items - Cinching of U-Bolts j
l h (55 d 6
94cy). 61 k'
~~
3e 34.00