Forwards Revised General Review Correspondence & ASLB Related Correspondence Logs Re Plant Independent Assessment program-Phase 3
ML20127J727
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/02/1985
From: Williams N
CYGNA ENERGY SERVICES
To: Ellis J
Citizens Association for Sound Energy
References
NUDOCS 8505210556
Download: ML20127J727 (9)


Text

,

5040

$saysCIS 101 Cahfornia Street, Suite 1000, San Francisco, CA 94111-5894 415 397-5600 May 2, 1985 84042.37 Mrs7 Juanita Ellis President, CASE 1426 S. Polk Dallas, Texas 75224

Subject:

Transmittal Numbers for ASLB Letters Texas Utilities Generating Company Comanche Peak Steam Electric Station Independent Assessment Program-Phase 3 Job No. 84042

Dear Mrs. Ellis:

As part of Cygna's Phase 3. review effort, we have maintained two outgoing correspondence logs - one for general review correspondence and one for ASLB related correspondence.

Both logs begin with the number 84042. The difference between the two numbering schemes is that all general review correspondence is preceded by a zero and begins with sequence number 001.

The ASLB numbering system begins with 01 and is not preceded by a zero beyond the number 9. While recently reviewing our files, we noticed that the numbering sequence for the ASLB outgoing correspondence did not follow this rule. As a result, we have revised our ASLB log and are transmitting both the old and new versions for your reference.

If you require any clarification, please call.

Very truly yours, N.H. Williams

~ Project Manager NHW/ta Attachments cc: Mr. S. Treby (USNRC) w/a Mr. J. Bedding (TUGCO) w/a Mr. J. Beck (TUGCO) w/a

-Mr. D. Pigott w/o a Ms. J. Amerongen (EBASCO)w/a Mr. S. ' Burwell. 1 (USNRC)w/a Ms. V. Noonan (USNRC)w/a 323b S. , ,,. _ , e.,.n c~.9 _.. .BW 6 M6 8505210556 850502 PDR ADOCK 05000445 5p-Vh A PDR

Outgoing

[ t i Correspondence mum"***** Log Pmmet Independent Assessment Program-Phase III Job No. 84042 pag. 1 og Chant . Texas Utilities Services, Inc. Fue lndex No. 15.2 Ndter Date Sutoct 01 2/14/84 TO: D.H. Wade /TUSI RE: CASE Request for Documents 02 3/2/84 TO: J. Ellis/ CASE RE: Response to CASE Questions 03 3/7/84 TO: J. Ellis/ CASE RE: Response to CASE Questions 04 3/9/84 TO: J. Ellis/ CASE

  • RE: Response to CASE Questions 05 3/13/84 TO: J. Ellis/ CASE RE: Response to CASE Ques': ions 06 3/14/84 TO: J. Ellis/ CASE RE: Response to CASE Questions i

07 3/15/84 To: J. Ellis/ CASE RE: Response to CASE Questions 08 4/16/84 TO: J. Ellis/ CASE RE: Response to CASE Questions 09 4/17/84 TO: J. Ellis/ CASE RE: Response to CASE Questions 10 4/18/84 TO: J. Ellis/ CASE RE: Response to CASE Request dtd. 4/17/84

Outgoing R W I'S E D OG Correspondence 4

84042 p g. 2 og Pmisct Independent Assessment Program-Phase III Job No.

Texas Utilities Services, Inc. Fneindex No. 15.2 Cuent Number Date Sutvect 11 5/15/84 TO: J. Ellis/ CASE RE: Telecon Transmittal #1 12 5/16/84 TO: J. Ellis/ CASE RE: Telecon Transmittal #2 13 5/23/84 TO: J. Ellis/ CASE RE: Telecon Transmittal #3 14 5/31/84 TO: J. Ellis/ CASE RE: Telecon Transmittal #4 15 6/1/84 TO: J. Ellis/ CASE RE: Telecon Transmittal #5 16 6/1/84 TO: J. Ellis/ CASE RE: Responses to Cygna Pipe Support

& Pipe Stress Questions 17 6/18/84 TO: J. Ellis/ CASE j

RE: Telecon Transmittal #6 18 6/18/84 TO: J. Ellis/ CASE RE: Gibbs & Hill Response to Pipe Stress Questions .

19 6/19/84 TO: J. Ellis/ CASE RE: Gibbs & Hill Responses to Pipe Stress Questions 20 6/21/84 TO: J. Ellis/ CASE RE: Telecon Transmittal #7

. ses4.oo

l Outgoing

~ '

Lk ( i a REVISED LOG Correspondence Prosect Independent Assessment Program-Phase III ace No. 84042 Peee 3 of c h nt Texas Utilities Services, Inc. File index No. 15.2 Number Does Subsect 21 6/23/84 TO: J. Ellis/ CASE RE: Telecon Transmittal #8 22 6/23/84 TO: J. Ellis/ CASE RE: Responses to Cygna Pipe Support Questions 23 6/30/84 TO: J. Ellis/ CASE RE: Transmittal of Responses to Pipe Support and Pipe Stress Questions 24 7/24/84 TO: J. Ellis/ CASE RE: Telecon Transmittal #9 25 7/31/84 TO: J. Ellis/ CASE RE: Telecon Transmittal #10 26 8/6/84 TO: J. Ellis/ CASE RE: Responses to Cygna Design Control, Pipe Support, and Pipe Stress Questions 27 8/16/84 To: D. Pigott/OH&S RE: ASLB Request for Clarification on Phase,3 Report 28 8/29/84 TO: J. Ellis/ CASE RE: Communication Report Transmittal #11 29 8/31/84 TO: J. Ellis/ CASE RE: Communications Report Transmittal #12 30 10/3/84 TO: J. Ellis/ CASE RE: Responses to Cygna Desion Control, Pipe Support, and Pipe Stress Questions ees .oo

Outgoing rrMW ONO kk k &

REVISED LOG Independent Assessment Program-Phase III Job No. 84042 page 4 og monet Texas Utilities Services, Inc. Fusindex No. 15.2 Chant Dale Sutvect hmber 31 10/11/84 TO: J. Ellis/ CASE RE: Telecon Transmittal #13 32 11/13/84 TO: J. Ellis/ CASE RE: Communications Report Transmittal #14 33 11/28/84 TO: J. Ellis/ CASE RE: Responses to Cygna Questions from the IAP Reviews 34 11/28/84 TO: J. Ellis/ CASE RE: Communications Report Transmittal #15 35 2/19/85 TO: J.B. GEORGE /TUGCO RE: Stability of Pipe Supports (REISSUED W/ No. 84042.027 File 2.2.1) 36 3/25/85 TO: J.W. Beck /TUGCO RE: Phase 3 Open Items - Cinching of U-Bolts (REISSUED W/ NO. 84042.028 File 2.2.1) 9084.00

- - . . - - . ~ . - . - . . - - - . - . - . . . , . - . . - . . . . . . . . . , - . . - _ - . . ,..... .- .

' ~

,f Outgoing 4L( 0 Correspondence i

111 h [rvi "U ASLB HEARINGS N'* *'

Pmpd Independent Assessment Program - Phase III **"" 84042 1 File index N Texas Utilties Services, Inc. 15.2 1 I

Number Date Subiect 2/14/84 TO: D.H. Wade /TUSI FROM: N. Williams 01 RE: CASE Request for Documents i 02 3/2/84 TO: J. Ellis/ CASE FROM: N. Williams RE: Response to CASE Questions 03 3/7/84 TO: J. Ellis/ CASE FROM: N. Williams RE: Response to CASE Questions 04 3/9/84 TO: J. Ellis/ CASE FROM: N. Williams RE: Response to CASE Questions 05 3/13/84 TO: J. Ellis/ CASE FROM: N. Williams RE: Response to CASE Questions 06 3/14/84 TO: J. Ellis/ CASE FROM: N. Williams RE: Response to CASE Questions 07 3/15/84 TO: J. Elllis/ CASE FROM: N. Williams RE: Response to CASE Questions l

08 4/16/84 TO: J. Ellis/ CASE FROM: N. Williams RE: Response to CASE Questions 09 4/17/84 TO: J. Ellis/ CASE FROM: N. Williams

' RE: Response to CASE Questions J. Ellis/ CASE D. Oldag 10 4/18/84 TO: FROM:

RE: Response to CASE Request dtd. 4/1,7/84 I

11 5/15/84 TO: J. Ellis/ CASE FROM: N. Williams RE: Telecon Transmittal #1 1

12 5/16/84 TO: J. Ellis/ CASE FROM: N. Williams RE: Telecon Transmittal #2 1 _ ___ ___

LJtgOIng D

COrreSPOndenCO

[ , ,

log O G b (_ o G

-AStE HEAR 1NaS h*' 2 of

    • h*- 84042 Pmpa Independent Assessment Program - Phase III File index No. 15.2 cue
  • Texas Utilities Services, Inc.

subact b Date FROM: N. Williams 013 5/23/04 TO: J.Ellis/ CASE RE: Telecon Transmittal f3 5/31/84 TO: J. Ellis/ CASE FROM: N. Williams j814 Telecon Transmittal #4 RE:

6/1/04 TO: J. Ellis/ CASE FROM: N. Williams jr15 Telecon Transmittal #5 RE:

s016 6/1/84 TO: J. Ellis/ CASE FROM: N. Williams RE: Responses to Cygna Pipe Support

& Pipe Stress Questions

  • F17 6 A8 /84 TO: J. Ellis/ CASE FROM: N. Williams RE: Telecon Transmittal #6 TO: Ellis/ CASE FROM: N. Williams s516 6/18/84 J.

Gibbs & Hill Response to Pipe Stress Questions RE:

l TO: J. Ellis/ CASE FROM: N. Williams s&19 6/19/84 Gibbs & Hill Responses to Pipe Stress Questions RE:

l i

6/21/84 TO: J. Ellis/ CASE FROM: N. Williams f WF20 l RE: Telecon Transmittal #7 TO: J. Ellis/ CASE FROM: N. Williams 421 6/23/84 RE: Telecon Transmittal #8 h _

J. Ellis/ CASE FROM: N. Williams WP2 2 6/23/84 TO:

RE: Responses to Cygna Pipe Support Questions J. Ellis/ CASE FROM: N.' Williams 6/30/84 TO:

MD23 RE: Transmittal of Responses to Pipe Support and Pipe Stress Questions 7/24/84 00: J. Ellis/ CASE FROM: N. Williams s(24 RE: Telecon Transmittal #9 l

9034.00

l Udtgoing

" Correspondence 9

(

mammmmImm,u OLO LOC Log A** #

Pmpd Independent Assessment Program - Phase III heNa 84042 3

      • "" 15.2 client Texas Utilities Services, Inc.

SW Nunter Date TO: J. Ellis/ CASE FROM: N. Williams A25 '7/31/84 RE: Telecon Transmittal #10 TO: J. Ellis/ CASE FROM: N. Williams JG6 8/6/84 RE: Responses to Cygna Design Control, Pipe Support, and Pipe Stress Questions TO: David Pigott/OH&S FROM: N. 'illliams 427 8/16/84 RE: ASLB Recuest for Clarification on Phase 3 Report e628 8/29/84 TO: J. Ellis/ CASE FROM: N. Williams RE: Communication Report Transmittal #11 429 8/31/84 TO: J. Ellis/ CASE FROM: N. Williams RE: Communications Report Transmittal #12 E30 10/3/84 TO: J. Ellis/ CASE FROM: N. Williams RE: Responses to Cygna Design Control, Pipe support, and Pipe Stress Questions A31 10/11/84 TO: J. Ellis/ CASE RE: Telecon Transmittal #13 11/13/84 TO: J. Ellis/ CASE FROM: N. Williams

/G2 Communications Report Transmittal #14 RE:

g33 11/28/84 TO: J. Ellis/ CASE l RE: Responses to Cygna Questions from the IAP l Reviews __

l js34 11/28/84 TO: J. Ellis/ CASE RE: Communications Report Transmittal #15

  1. 35 02/19/85 TO: J.B. George /TUGCO f
F RE
Stability of Pipe Supports kmn',sv J- aja-  ? Q o ((2. O)]

\

d'36 03/25/85 TO: J.W. Beck /TUGCO j <$

RE: Phase 3 Open Items - Cinching of U-Bolts l

94cy). 61 k' h (55 d 6 ~~ _,

3e 34.00