Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20127L398 + (20:56:58, 12 December 2024)
- ML20127L397 + (20:56:59, 12 December 2024)
- IR 05000416/1985010 + (20:57:00, 12 December 2024)
- ML20127L394 + (20:57:00, 12 December 2024)
- 3F0193-06, Responds to Issues Identified in NRC as Not Satisfying Requirements of NUREG-0737,Item II.D.1 Re Pressurizer Safety & Relief Valves & Discusses Position on PORV Control Circuitry Qualification + (20:57:01, 12 December 2024)
- IR 05000255/1985013 + (20:57:05, 12 December 2024)
- ML20127L391 + (20:57:06, 12 December 2024)
- ML20127L389 + (20:57:07, 12 December 2024)
- ML20127L388 + (20:57:07, 12 December 2024)
- 05000382/LER-1992-013-01, :on 920403,determined That SI-3291B Had Been Replaced W/Asme Class 3 Valve Instead of Required Class 1 Valve Due to Inadequate Maintenance Procedure.Valve Replaced + (20:57:11, 12 December 2024)
- B14352, Responds to NRC Re Violations Noted in Combined Insp Repts 50-245/92-26,50-336/92-28 & 50-423/92-22. Corrective Actions:Spent Resin Shall Not Be Shipped to Disposal Site Until Representive Sampling Resolved + (20:57:12, 12 December 2024)
- ML20127L385 + (20:57:13, 12 December 2024)
- ML20127L384 + (20:57:13, 12 December 2024)
- 05000263/LER-1992-012-01, Forwards LER 92-012-01 Initially Re Failure to Include Manual Valves in Section XI Testing.Results of Review & Other ASME Section XI Program Discrepancies,Noted in Insp Rept 50-263/92-10 Warranted Rev to LER + (20:57:22, 12 December 2024)
- ET-NRC-93-3800, Forwards Updated Schedules for AP600 Testing Program to Reflect Progress in AP600 Testing Program as of 930108 + (20:57:23, 12 December 2024)
- ML20127L375 + (20:57:23, 12 December 2024)
- 05000369/LER-1985-016-01, :on 850508,discovered That Temp Compensation Chart Not Incorporated in Hydrogen Analyzer Operation Emergency Procedure.Caused by Procedural Deficiency.Temp Compensation Charts Incorporated in Procedure + (20:57:26, 12 December 2024)
- ML20127L370 + (20:57:27, 12 December 2024)
- 05000269/LER-1985-008-02, :on 850520,surveillance Interval for Plant Fire Protection Sys Exceeded Tech Spec Limits.Caused by Personnel Error Involving Entry of Wrong Work Request Number Into Computer.Surveillance Test Completed + (20:57:30, 12 December 2024)
- ML20127L368 + (20:57:31, 12 December 2024)
- ML20127L365 + (20:57:36, 12 December 2024)
- 05000361/LER-1992-009-01, Forwards LER 92-009-01 Re Misalignment of Salt Water Cooling Pump Emergency Seal Water Supply Isolation Valve + (20:57:42, 12 December 2024)
- ML20127L359 + (20:57:43, 12 December 2024)
- ML20127L358 + (20:57:44, 12 December 2024)
- ML20127L356 + (20:57:45, 12 December 2024)
- ML20127L355 + (20:57:46, 12 December 2024)
- ML20127L351 + (20:57:47, 12 December 2024)
- ML20127L353 + (20:57:47, 12 December 2024)
- ML20127L348 + (20:57:48, 12 December 2024)
- ML20127L346 + (20:57:49, 12 December 2024)
- ML20127L345 + (20:57:49, 12 December 2024)
- ML20127L344 + (20:57:50, 12 December 2024)
- ML20127L343 + (20:57:51, 12 December 2024)
- TXX-9302, Advises That Rept Describing Program Utilized to Select Specific Components for Inclusion in ASME Boiler & Pressure Vessel Code Section XI Inservice Test Program Will Be Submitted by 930701,in Response to NRC Request for Info + (20:57:51, 12 December 2024)
- ML20127L339 + (20:57:52, 12 December 2024)
- ML20127L338 + (20:57:53, 12 December 2024)
- ML20127L336 + (20:57:53, 12 December 2024)
- ML20127L335 + (20:57:54, 12 December 2024)
- ML20127L334 + (20:57:55, 12 December 2024)
- 05000295/LER-1989-025-01, :on 891218,auxilary Feedwater Discharge Monitor Operated Valve Failed Due to Inadequate Design.Original Design Reviewed & Revised by Onsite Engineering + (20:57:57, 12 December 2024)
- ML20127L330 + (20:57:58, 12 December 2024)
- ML20127L326 + (20:57:59, 12 December 2024)
- ML20127L324 + (20:58:00, 12 December 2024)
- ML20127L323 + (20:58:00, 12 December 2024)
- ML20127L321 + (20:58:01, 12 December 2024)
- ML20127L320 + (20:58:02, 12 December 2024)
- ML20127L318 + (20:58:03, 12 December 2024)
- ML20127L317 + (20:58:04, 12 December 2024)
- ML20127L315 + (20:58:05, 12 December 2024)
- ML20127L313 + (20:58:06, 12 December 2024)
- ML20127L310 + (20:58:07, 12 December 2024)
- ML20127L308 + (20:58:08, 12 December 2024)