Decesher 17, 1973 Docket No. 50-263 j '
?/
j i, Mr. Harold G. Mangelsdorf Chairman, Advisory Comittee on Reactor Safeguards U. S. Atomic Energy Commission Washington. D. C.
20545
Dear Mr. Mangelsdorf:
Sixteen (10) e pies of the following are transmitted for the Committce's inte mation:
Letter from dorthern States Power Company dated December 14, 1973, transmitting Monticello Segmented Test Rod Bundle Submittal (Supplement to Monticello Second Reload Submittal)"
PROPR1!"fARY INFORMATION.
Disgjkbution Sincerely, J. Docket File Branch Reading
?
,, f f k 'A h
^'
Donald J.4 ovholt Assistant Director for Operating Reactora Directorate of Licensing Enclosures :
As stated Cys 21 through 36
~
jp,;j g.,
h ?.!2
- oma,
?,A,,
sum t.
.58issS:83h 12/.17/.73 wr>
FC-lit (Rev,9-53) ALCM 0240 ese
+u-as-eten-i so4's 9211230499 731217 PDR ADOCK 05000263--
O PDR
NY Y
, pf i.
Q-n~
g,g-.
Regulatory Docket File gg
~-
" " " b tfcelfo N ee U2 "
February 4, 1974 6]
?
&g ' 'b Mr. J. G. Keppler, Pegional Director Directorate of Pegulatory Operations E
@j t
Pegion III Q
tinited States Atmic Energy Cocaission b
799 Roosevelt Road Glen Ellyn, Illinois 61073 (N 7 Dear Mr. Keppler
!ORICI11D IUC1. EAR GDGATI?C PIRR Docket No. 50-263 License No. DPR-22 0:1 Februaty 3,1974, during routine transfer of torus water to radwaste, the "A" Posidual llent Removal (THR) torus cooling injection valve operator (50 2008) motor failed due to stalled rotor current overheating the windings. Tim rutor stalled because the valve stem travel limit switches became misaligned. The misalignent was caused by the stem follower failina to retain the stem in its proper position, hip to the alignment of the stem travel limit switches.the stem po direct relations Further investigation and repair art in progress. The valve can be operated mantia11y if required. This failure kloes not affect IJCI operability.
Isolation festvres are preserved by the upstrean isolation valve.
Y(urs rery t w (J
,h
' w*
C. e. l4rson 6
Plant Manager bbnticello
/ 3/
CEI,/BIJ/kik
{.;
d'f>g /
.. k p ect J F O' Leary
'y hu A
N Q' % j [%
G Charnoff 4g blinnesota Pollution Control Agency Attn:
E. A. Pryzina g
Copies sent by telecopier to Keppler and O'!eary l1
.J USS Q((35GqOLfGl eee-
?
i AEC DISSitUTION FOR PART 50 BOCKET MATEPT AL (TEMPORARY FOPJt)
C0!ITROLNos_997 FILET FROMt DATE OF DOC DATE REC'D LTR MEMO RPT OTHER Northern States Power Cornpany Monticello, Minnesota 55362 2-4 74 2-5-74 Facsimile Co E. Larson it)g ORIG CC OTHER SENT AEC PDR X
J. G. Keppler 1
SENT LOCAL PDR X
CLASS UNCLASS PROP INFO INPUT NO CiS REC'D DOCKET NO:
XXX 1
50-263 DESCRIPTION:
ENCLOSURES:
Facsimile reporting abnormal eccurrence on 2-3-74, in which the "A" Residual llcat 'emoval DO N0ef RE,MOVEp torun cooling injection valve operator tnotot f ailed due to stalled rotor current overheating the windingn..........
ACKNOWLEDGED PLANT NAME Monticello Unit FOR ACTION /INFORMATION 2-5-74 GC LUTLER(L)
SCl!4ENCER(L) v7.IlliANN(L)
REGAN(E)
W/ Copies W/ Copics W/ 7 Copies W/ Copies CLARK (L)
STOLZ(L)
DICKER (E)
W/ Copies W/ Copics W/ Col,i e s W/ Copies j
COLLER(L)
VASSALLO(L)
D11CHION(E)
~
W/ Copies W/ Copies W/ Copies W/ Copies 13tIEL(L)
SCllEMEL(L)
YOUNGBLOOD(E)
W/ Copies W/ Copies W/ Copies W/ Copics INTERNAL DISTRIBUTION gG FIID TECH REVIEW DENTON A/T IUD LIC ASST M EC PDR MIENDRIE GRIMES BRAIIMAN A GC, ROOM P-506A SCHROEDER CAMMILL AIGGS(L)
SAL'I2 MAN
,)(UNTZING/ STAFF vMACCARY KASTNER GEARIN (L)
B. IlURT
.4ASE
)311 Gilt BALLARD GOULBOURNE (L) pyjpg GIAMBUSSO
.JAVLICKI SPANGLER LEE (L)
MCDONALD BOYD J11A0 MAIGRET (L)
DUBE v/I put MOORE (L)(IMR)
,)lTELLO ENVIRO SERVICE (L)
DEYOUNG (L) (l'JR)
- 10USTON MULLER S11EPPARD (E)
INTO 4 KOVHOLT (L) tJOVAK DICKER SMIT 11 (L)
C. MILES P. COLLINS
/OSS KNIGHTON TEETS (L)
/ B. KING (RO)
DENISE
/PPOLITO YOUNGBLOOD WADE (E) f EG OPR jTtDESCO REGAN WILLIAMS (E)
FILE & REGION (3)
/UNG PROJECT LDR WILSON (L)
J ORRIS p'AINAS S. REED (L)
.A TEELE fENAR0YA HARLESS
,Af0 LIBER m
EXTERNAL DISTRIBUTION ff g - LOCAL PDR___ Minneapolin. Minn. _
f
/1 - DTIE(ABERNATlIY)
(1)(2X10) NATIONAL LAB'S_
1-PDR-SAN /LA/NY
/1 - NSIC(BUCIWIAN) 1-ASLBP(E/W Bldg,Rm 529) 1-GERALD LELLOUCHE 1 - ASLB(YORE /SAYRE/
1-W. PENNINGTON, um E-201 GT BROOKHAVFN NAT. LAB WOODARD/"II" ST.
1-CONSULTANT' S 1-AGMED(Ruth Gusseap)
V16 - CYS ACRS H5EMIN5 SENT TO LIC. ASST.
NEWMARK/BLUME/AGDARIAN.
Pli-B- 12 7,
',T.
2-5-74 Diggs 1-GERALD ULRIl30N...ORNL 1-RD..MULLE:... F-309 GT