Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128B261 + (19:52:48, 12 December 2024)
- ML20128B260 + (19:52:50, 12 December 2024)
- ML20128B259 + (19:52:52, 12 December 2024)
- ML20128B257 + (19:52:55, 12 December 2024)
- 05000155/LER-1992-002, Advises That Commitment Due Dates for LER 92-002 Re as-found Setpoint Failure of Liquid Poison Relief Valve RV-5049 & LER 92-009 Re Reactor Scram During Plant Startup for Cycle 26 Overdue.Operator Training Delayed Until 930301 + (19:52:56, 12 December 2024)
- ST-HL-AE-1279, First Interim Deficiency Rept Re Improper Consideration of Prying Action for Pipe Support Anchorages.Initially Reported on 850524.Calculations Being Reviewed as Part of Design Freeze Effort for Pipe Supports.Next Rept by 851017 + (19:52:58, 12 December 2024)
- ML20128B254 + (19:53:00, 12 December 2024)
- 05000458/LER-1992-029, :on 921230,ESF Actuation Occurred,Resulting in Isolation of RCIC Sys & Causing RCIC Outboard Steam Isolation Valve to Close.Root Cause Indeterminate.Isolation Signal Reset & RCIC Sys Restored + (19:53:05, 12 December 2024)
- ML20128B250 + (19:53:07, 12 December 2024)
- ML20128B249 + (19:53:08, 12 December 2024)
- ML20128B246 + (19:53:14, 12 December 2024)
- ML20128B244 + (19:53:15, 12 December 2024)
- 05000302/LER-1992-027, :on 921229,plant Tripped Due to High RCS Pressure Caused by Inadequate MFW Flow Reduction.Caused by Buildup of Deposits in Pump Control Actuator.Program Implemented to Replace Mfwp Actuators + (19:53:20, 12 December 2024)
- IR 05000245/1985012 + (19:53:23, 12 December 2024)
- TXX-4504, Forwards Rev 2 to Comanche Peak Response Team Program Plan & Issue-Specific Action Plans, Incorporating NRC Comments & Input.Umbrella QA Effort Being Developed for All Response Team Activities Not Under Util App B Program + (19:53:26, 12 December 2024)
- ML20128B239 + (19:53:28, 12 December 2024)
- ML20128B235 + (19:53:31, 12 December 2024)
- ML20128B234 + (19:53:33, 12 December 2024)
- ML20128B233 + (19:53:36, 12 December 2024)
- ML20128B232 + (19:53:37, 12 December 2024)
- ML20128B230 + (19:53:40, 12 December 2024)
- ML20128B229 + (19:53:41, 12 December 2024)
- 05000282/LER-1992-017-01, :on 921230,component Cooling Water Pump 12 auto-started Due to Low Header Pressure.Caused by Failure of CR Operator to Use self-checking.Timely & Corrective Restoration Performed & Mgt Counseled + (19:53:46, 12 December 2024)
- ML20128B225 + (19:53:50, 12 December 2024)
- ML20128B222 + (19:53:52, 12 December 2024)
- ML20128B219 + (19:53:57, 12 December 2024)
- ML20128B215 + (19:54:00, 12 December 2024)
- ML20128B214 + (19:54:01, 12 December 2024)
- ML20128B212 + (19:54:03, 12 December 2024)
- RBG-38068, Forwards Revised Response to NRC Re Violations Noted in Insp Rept 50-458/92-26 on 920705-0815.Corrective Actions:Addended Instructions to Velan Valve Co Manual Received on 920901 & Incorporated Into Util Vendor Manual + (19:54:06, 12 December 2024)
- ML20128B205 + (19:54:08, 12 December 2024)
- ML20128B204 + (19:54:11, 12 December 2024)
- ML20128B203 + (19:54:12, 12 December 2024)
- ML20128B202 + (19:54:14, 12 December 2024)
- ML20128B200 + (19:54:16, 12 December 2024)
- ST-HL-AE-1277, First Interim Deficiency Rept Re Incorrect Wall Thickness of Auxiliary Feedwater Pipe Spools.Initially Reported on 850524.Installation of Affected Piping on Hold. Engineering Practices Under Review.Next Rept by 850913 + (19:54:18, 12 December 2024)
- ML20128B196 + (19:54:20, 12 December 2024)
- RBG-21-403, Forwards Suppl to Util Re Insp & Mod Repts for Facility Tdi Standby Diesel Generators.End Revises Notes Pages & Applicable Entries in Rept to Further Clarify Various Items + (19:54:21, 12 December 2024)
- ML20128B194 + (19:54:24, 12 December 2024)
- RBG-21-322, Interim Deficiency Rept DR-304 Re Potential Wall Thickness Problem w/SA106 Pipe Supplied by Phoenix Steel Corp.Next Rept Will Be Provided by 850708 + (19:54:26, 12 December 2024)
- IR 05000333/1985006 + (19:54:27, 12 December 2024)
- ML20128B190 + (19:54:30, 12 December 2024)
- ML20128B185 + (19:54:32, 12 December 2024)
- ML20128B184 + (19:54:35, 12 December 2024)
- ML20128B182 + (19:54:37, 12 December 2024)
- ML20128B181 + (19:54:40, 12 December 2024)
- IR 05000413/1992027 + (19:54:46, 12 December 2024)
- ML20128B179 + (19:54:47, 12 December 2024)
- ST-HL-AE-1276, First Interim Deficiency Rept Re Altered Certificates of Compliance.Initially Reported on 850524.Appropriate Documentation Obtained from Supplier.Investigation in Progress.Next Rept Will Be Submitted by 850802 + (19:54:53, 12 December 2024)
- ML20128B174 + (19:54:54, 12 December 2024)
- ML20128B173 + (19:54:57, 12 December 2024)