Part 21 Rept Re Local Generator Control Panel.Initially Reported on 850401.Addl Info Provided in 850510 Meeting W/Colt Industries,Inc Indicates Potential Ventilation Problem Isolated to Power Section of Control Cabinet
ML20128B230
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 05/14/1985
From: Leusink H
LOUIS ALLIS CORP. (DIV. OF MAGNETEK, INC.)
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
REF-PT21-85, REF-PT21-85-237-000 HCC-NRC-3, PT21-85-237, PT21-85-237-000, NUDOCS 8505240452
Download: ML20128B230 (2)


Text

_

q 427 E. Stewart St., P.O. Box 2020, Milwaukee, WI 53201-2020 414-481-6000 TWX 910-262-3115 HCC-NRC-3 May 14, 1985 Dr. Thomas E. Murley U.S. NUCLEAR REGULATORY COMMISSION Region 1 631 Park Avenue King of Prussia, PA 19406

SUBJECT:

HOPE CREEK #1 - LOCAL GENERATOR CONTROL PAhcl 10CFR21 - DATED 4/1/85

Dear Dr. Murley:

This letter is a follow-up on the subject notification.

On May 10, Louis Allis and Colt Industries met to discuss the extent of the reported problem.

Louis Allis was provided additional information regarding the heat generation of the transformers in question.

This information indicates the potential ventilation problem is isolated to the power section of the control cabinet.

Colt Industries has requested additional time to research the problem and then they, Colt will schedule a meeting with all the principles.

Louis Allis will continue t'o work with the parties involved to reach an early completion to this project.

Sincerely, LOUIS ALLIS COMPANY DIV. OF MAGNETEK, INC.

fgy pf 4

p Harlan H. Leusink Vice President - Engineering HHL/vaj cc:

Mr. E. Klessig Mr. J. Borman Mr. A. Giesecke Mr. H. Schreiber Mr. R. Keyser - Colt Industries Il M