Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128B990 + (19:39:12, 12 December 2024)
- ML20128B986 + (19:39:13, 12 December 2024)
- ML20128B985 + (19:39:13, 12 December 2024)
- PNO-V-85-030, on 850521,Region V Notified That Facility Shut Down Based on USGS Declaration of Volcano Alert. Facility Located 50 Miles South/Southwest of Mount St Helens.No Significant Threat to Facility Expected + (19:39:14, 12 December 2024)
- ML20128B984 + (19:39:14, 12 December 2024)
- ML20128B982 + (19:39:15, 12 December 2024)
- ML20128B980 + (19:39:16, 12 December 2024)
- ML20128B978 + (19:39:17, 12 December 2024)
- ML20128B979 + (19:39:17, 12 December 2024)
- ML20128B977 + (19:39:18, 12 December 2024)
- ML20128B976 + (19:39:19, 12 December 2024)
- ML20128B972 + (19:39:20, 12 December 2024)
- ML20128B971 + (19:39:21, 12 December 2024)
- 05000382/LER-1985-014, :on 850415,reactor Protective Sys Automatically Actuated.Caused by Feedwater Pump Trip Due to Increase in Feedwater Pump Turbine Drain Tank Water Level.Operators Cautioned + (19:39:23, 12 December 2024)
- ML20128B965 + (19:39:27, 12 December 2024)
- ML20128B964 + (19:39:28, 12 December 2024)
- TAC:57410 + (19:39:30, 12 December 2024)
- ML20128B963 + (19:39:30, 12 December 2024)
- ML20128B960 + (19:39:31, 12 December 2024)
- SNRC-2014, Forwards Rev 0 to Shoreham Decommissioning Project Termination Survey Plan + (19:39:32, 12 December 2024)
- ML20128B957 + (19:39:32, 12 December 2024)
- ML20128B956 + (19:39:33, 12 December 2024)
- ML20128B955 + (19:39:34, 12 December 2024)
- ML20128B954 + (19:39:34, 12 December 2024)
- ML20128B952 + (19:39:35, 12 December 2024)
- ML20128B950 + (19:39:36, 12 December 2024)
- ML20128B949 + (19:39:37, 12 December 2024)
- ML20128B948 + (19:39:38, 12 December 2024)
- ML20128B942 + (19:39:39, 12 December 2024)
- ML20128B946 + (19:39:39, 12 December 2024)
- ML20128B940 + (19:39:40, 12 December 2024)
- ML20128B939 + (19:39:41, 12 December 2024)
- ML20128B937 + (19:39:42, 12 December 2024)
- ML20128B938 + (19:39:42, 12 December 2024)
- ML20128B936 + (19:39:44, 12 December 2024)
- ML20128B932 + (19:39:45, 12 December 2024)
- RBG-38-063, Forwards Response to Notice of Violation & Proposed Imposition of Civil Penalty for Insp Rept 50-458/92-33 on 921007-16 & 19-23.Corrective Actions:Two Individuals Involved Were Body Counted & MPC Hours Assigned.Fee Paid + (19:39:47, 12 December 2024)
- ML20128B929 + (19:39:47, 12 December 2024)
- ML20128B927 + (19:39:48, 12 December 2024)
- RBG-21-319, Interim Deficiency Rept DR-307 Re Stainless Steel Olets Supplied by Hub,Inc & Mfg by Bonney Forge.Next Rept Will Be Provided by 850708 + (19:39:49, 12 December 2024)
- ML20128B925 + (19:39:50, 12 December 2024)
- ML20128B922 + (19:39:51, 12 December 2024)
- ML20128B918 + (19:39:52, 12 December 2024)
- ML20128B915 + (19:39:53, 12 December 2024)
- IR 05000423/1985009 + (19:39:54, 12 December 2024)
- ML20128B913 + (19:39:54, 12 December 2024)
- 0CAN019307, Forwards Response to NRC 921116 Request for Addl Info Re in-structure Response Spectra,Per Suppl 1 to GL 87-02. Confirms That Util Used Generic Implementation Procedure 2 Guidance to Resolve USI A-46 + (19:39:55, 12 December 2024)
- ML20128B906 + (19:39:56, 12 December 2024)
- ML20128B901 + (19:39:57, 12 December 2024)
- ML20128B898 + (19:39:57, 12 December 2024)
- AECM-85-0133, Part 21 & Final Deficiency Rept 85-02 Re Tdi Diesel Generator Air Start Header Check Valve Failure.Design Change Initiated to Replace Eight Existing Check Valves on Div I & II W/Appropriate Check Valves Suitable for Design + (19:39:58, 12 December 2024)