Forwards Rev 0 to Shoreham Decommissioning Project Termination Survey Plan
ML20128B958
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 12/02/1992
From: Leslie Hill
LONG ISLAND POWER AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20128B961 List:
References
LSNRC-2014, NUDOCS 9212040171
Download: ML20128B958 (2)


Text

Long Shor: ham Nucl:ar Pow:r Station Island P.O. Box 628 Power Nodh Country Road Authority Wading River, N.Y.11792 DEC 2 1992 LSNRC-2014 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 ATTN:

Director, Office of Nuclear Material Safety and Safeguards Decommissioning Plan Chango Notification:

Termination Survey Plan Shoreham Nuclear. Power Station - Unit 1 Docket No. 50-322 q

Ref:

1)

Order Approving the Decommissioning Plan and Authorizing Decommissioning of Shoreham Nuclear Power Station, Unit 1, dated June 11, 1392.

2)

Long Island Power Authority Shoreham Nuclear Power Station Decommissioning Plan, submitted December 29, 1990 (as supplemented).

Gentlemen:

In accordance with condition 4 (a), 4 (b) and 4(c) of Ref.

1, LIPA-5 l

hereby submits notification of pending changes to the Shoreham-Decommissioning Plan (Ref. 2).

It is LIPA's understanding that, unless directed otherwise, LIPA may ipnlement the changes described herein after 30 days of the cate of this notification. contains a' copy of the revised Shoreham Decommissioning Plan, Chapter 4.0 entitled " Proposed Termination Survey".

This termination survey overview was developed from the Shoreham Decommissioning Project, Termination Survey Plan, Revision 0, October 1992 which is hereby provided as enclosure 2.

A companion document entitled " Nuclear Organization Management l

Control Program For Decommissioning Termination Survey Program Description (PDXOM-01)" is also p'rovided as enclosure 3.

l -is a' safety evaluation which contains a detailed description of the changes and has been reviewed and approved by l

LIPA's Site Review Committee (SRC).

Evidence of this review, p

n.-

[

p C

O ss

-.~.

E.

i i

t i~

LSNRC-2014 Page 2 i

1.e.,

SRC meeting minutes, is' included in enclosure.5 as required:

by condition 4 (b) of the NRC Decommissioning Order.

I The pending changes have been determined to involve no unreviewed safety question, and will not result-in environmental impacts different from and exceeding those set forth in LIPA's Supplement j

to Environmental Report of December, 1990.

Additionally, the pending1 changes'were discussed during the October 22-23,-1992 meeting at Shoreham and-during subsequent i

phone conversations with-NMSS personnel.-:Because.of these j

detailed discussions-and exchange of information the NRC Staff i

notified LIPA;that they are sufficiently familiar with the l

Termination Strvey Plan to recommend that we begin implementing l

it by-proceeding with the outdoor surveys.

LIPA looks forward to further discussions with-NMSS which may lead to additional 2-enhancements to the Shoreham Termination Survey Plan.-

a i

Should there be any questions regarding the above information, l

please do not hesitate to contact me or my staff.

)

i i

Very truly yours, l

dM

[

M. Hill-Resident Manager l

L l-LMH/ap l

Enclosures L

cc:

L.-Bell (NMSS)

E. Wenzinger (NRC-Region I)'

I J. Austin (NMSS)'

R. Nimitz.(NRC-Region I)

G. Arlotto (NMSS)

J. Joyner-(NRC-RegionDI)_

L. Pittiglio (NMSS)

R.

Bangart (NMSS) i-I h

f

,e e%~c.

-e+

~..,,

.c m,

-v_

.y