Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128M658 + (18:10:09, 12 December 2024)
- ML20128M655 + (18:10:10, 12 December 2024)
- ML20128M654 + (18:10:10, 12 December 2024)
- ML20128M650 + (18:10:11, 12 December 2024)
- ML20128M649 + (18:10:12, 12 December 2024)
- ML20128M646 + (18:10:13, 12 December 2024)
- ML20128M645 + (18:10:14, 12 December 2024)
- 05000423/LER-1996-033-01, :on 960909,spent Fuel Pool Storage Potentially Outside of Design Basis During Seismic Events as Result of Boraflex Embrittlement Discovered.Caused by Original Design Seismic Analysis.Tss Revised + (18:10:16, 12 December 2024)
- ML20128M642 + (18:10:17, 12 December 2024)
- ML20128M637 + (18:10:21, 12 December 2024)
- HL-3141, Forwards Owners Data Rept for Inservice Insp Ei Hatch Nuclear Plant Unit 2 Sept 1992 - Nov 1992. Core Spray Sparger & Associated Piping Examined Per NRC Bulletin 80-13 + (18:10:22, 12 December 2024)
- ML20128M636 + (18:10:22, 12 December 2024)
- PNO-IV-93-005, a:on 930210,incorrectly Read Survey Meter in Terms of Scale Multiplier Re Package of Radioactive Matl Received from Mallinckrodt.Correct Measurement Should Be 50 Mr/Hr Which Is within Regulatory Limits + (18:10:23, 12 December 2024)
- ML20128M627 + (18:10:25, 12 December 2024)
- ML20128M625 + (18:10:26, 12 December 2024)
- ML20128M623 + (18:10:27, 12 December 2024)
- ML20128M622 + (18:10:28, 12 December 2024)
- ML20128M621 + (18:10:29, 12 December 2024)
- ML20128M618 + (18:10:30, 12 December 2024)
- ML20128M620 + (18:10:30, 12 December 2024)
- ML20128M617 + (18:10:32, 12 December 2024)
- ML20128M616 + (18:10:33, 12 December 2024)
- ML20128M614 + (18:10:34, 12 December 2024)
- 05000296/LER-1985-010-02, :on 850421,inadvertent Initiation of Safety Sys Associated W/Primary Containment Isolation Signal Occurred Due to Short Caused During Fuse Removal.Caused by Personnel Error.Sys Returned to Standby Readiness + (18:10:35, 12 December 2024)
- ML20128M606 + (18:10:37, 12 December 2024)
- ML20128M604 + (18:10:38, 12 December 2024)
- ML20128M603 + (18:10:39, 12 December 2024)
- ML20128M601 + (18:10:40, 12 December 2024)
- ML20128M600 + (18:10:41, 12 December 2024)
- IR 05000461/1996008 + (18:10:42, 12 December 2024)
- ML20128M596 + (18:10:43, 12 December 2024)
- ML20128M595 + (18:10:43, 12 December 2024)
- U-602100, Annual Operating Rept for Jan-Dec 1992 + (18:10:44, 12 December 2024)
- ML20128M591 + (18:10:45, 12 December 2024)
- 05000271/LER-1996-021, :on 960907,inadequate Procedural Controls of MOVs Limit Switch Settings Results in Potential Common Cause Failure Mode W/Capacity to Affect Multiple Safety Significant Components + (18:10:47, 12 December 2024)
- 05000413/LER-1985-041, :on 850613,main Feedwater Pump Trip Resulted in Manual Reactor Trip.Caused by Pump Recirculation Valve Not Capable of Modulating Quickly During Flow Reduction.Design Deficiency Corrected + (18:10:49, 12 December 2024)
- PNO-IV-93-006A, on 930209,insp Conducted at Hazardous Waste Processor Facility in Tulsa,Ok to Make Measurements on 32 Barrels Containing Waste.Barrels Will Be Sampled from Top & Bottom to Determine Source Matl Before Disposal + (18:10:50, 12 December 2024)
- ML20128M585 + (18:10:51, 12 December 2024)
- ML20128M582 + (18:10:52, 12 December 2024)
- ML20128M583 + (18:10:52, 12 December 2024)
- 05000341/LER-1985-026, :on 850615,emergency Equipment Cooling Water Sys Automatically Initiated When Third Pump Started.Caused by Bypass Valve Overshoot.Operating Procedure Revised to Place Sys in Override Prior to Switching Pumps + (18:10:54, 12 December 2024)
- ML20128M579 + (18:10:55, 12 December 2024)
- 05000318/LER-1985-001-02, :on 850423,manual Trip Occurred as Result of Degradation of Reactor Coolant Pump 21A Shaft Seal. Degradation Caused by Temp Fluctuations Resulting in Pressure Oscillations Between Stages of Seal + (18:10:57, 12 December 2024)
- 05000423/LER-1996-032-01, :on 960910,HPSI Rv Piping Hydrostatic Test Was Found to Be non-compliance W/Asme Code Due to Personnel Error.Performed Test at Required Test Frequency + (18:10:59, 12 December 2024)
- ML20128M574 + (18:11:01, 12 December 2024)
- ML20128M573 + (18:11:01, 12 December 2024)
- ML20128M568 + (18:11:03, 12 December 2024)
- ML20128M569 + (18:11:03, 12 December 2024)
- ML20128M565 + (18:11:04, 12 December 2024)
- ML20128M560 + (18:11:05, 12 December 2024)
- ML20128M561 + (18:11:05, 12 December 2024)