U-602100, Annual Operating Rept for Jan-Dec 1992

From kanterella
Jump to navigation Jump to search
Annual Operating Rept for Jan-Dec 1992
ML20128M592
Person / Time
Site: Clinton 
Issue date: 12/31/1992
From: Spangenberg F
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
U-602100, NUDOCS 9302220223
Download: ML20128M592 (6)


Text

.,

U. 602100 7

L30-93 (02-10)LP lh no ower Company Chnton Power Station P.O. Box 676 -

Cunttin. IL 61727 Te' 217 935-8881 POWER

--February 10, 1993 10CFR50,36 Docket No. 50-461 Document Control Desk Nuclear Regulatary Commission Washington, D.C.

20"55

Subject:

6HUual Operatinn Report

Dear Sir:

In accordance with Section 6.9.1.4 of the Clinton Power Station Technical. Specifications, Illinois Power. Company is submitting the attached Clinton Power Station annual Operating-Report for the period of January 1,1992 through December 31, 1992.

Sincerely yours, I

C-A.

F. A. Spa genbe 7,

III

Manager,

.icens ng and fety SFB/msh Attachments cc NRC Region III, Regional Administrator NRC Clinton Licensing Project Manager NRC Resident Office, V-690 Director, Office of Nuclear Regulatory Research Illinois Department of Nuclear Safety 190129

'D I

g!8 agg gggg 1

,,.. +

k 6'

5

-as

+

y.

+

m

.7 i

,s l-t

' )

'Clinton Power Station; Clinton, Illinois

^ C s

P J

- Annual Operating Report January 1, 1992 through December 31,-1992 s

?

)

+ '

-USNRC Docket 50-461' 4

h

$ 5 l

4 yrrsb -wy 3

7%k w

  • -e-1' 9

N

&M

.r&3

.-T%

b'W'1 Mv"

ME' 41""

F I h i

b" Y '

T

. -I

[Attechmantill to.Us 602100

.. Page' 1. of ; 2 -

Attachments

'I.

Personnel Man-Rem by Work and Job Function

4. <:

II.

Performance'Characceristics and Tests Safety. Valve and. Safe ty/Reitef Valve ' Challenges Primary Coolant Specific Activity Analyses p

'ni 1.

e l'

i l

-+

,.-,..-.,-,,,-,.-e

,,,w-

+

+.,.

-ILLIN0!$ POWER COMPANT CLIN 10N POWER STAil0N-BOX 678

-CLINTON,-lLLINOIS 61727 Reg. Ouide 1.16 Report

_ Reporting tear 92

  1. PERSONNEL (>100 MREM) _

TOTAL MAN REM WORK & JOS FUNCTION

-STATION UTILITT CONTRACT STATION UTILITY

! CONTRACT Routine operations and Surveillance Maintenence and Construction 136-3 270-6.215-0.238 5.949 operations 45 0

11 10.111 0.000-0.157.

Health PhysIer and Lab 46 0

58

.15.326 0.000' 15.596' Supervisory and offlee Staff 14 0

12 1.099.

0.000 0.437 '

Engineering Staff 14 0

13 0.975 0.000 0.323 g

Routine Plant Maintenance Maintenance and Construction 115 2

82 5.046

'0.159 -

1.979 operations

- 31 0

'2 1.015 0.000 0.030 Heatth Physics and Lab 24 0

5 0.692 0.000 0.150-Supervisory and office Staff 4

0 2

0.067

~ 0.000 -

0.059-Engineering Staff 9

0 0

0.227.

'0.000

'O 000 Inservice Inspection Miintenance and Construction 10 0

171 0.387 0.000 40.604

-operations 3

0 3

0.064 0.000-0.970 '

Heatth Physics and Lab 5

0

.14 0.172 0.00.

0.704 Supervisory and Office Staff 1

0 1

0.056 0.000 0.275 -

Engineering Staff 4

0 11 0.094 0.000

= 4.416 Special Plant Maintenance Naintenance and Construction 154 3

362 57.703 0.914-147.004-Operations 45 0

12 9.602 0.000 2.262 Health Physics and Lab 39 0

44 -

8.837 0.000 3.867 Supervisory and Office Staff 13 0

9 2.632-0.000 2.744 Engineering Staff 12 0

13 2.332 0.000-

-0.876-Waste Processing Maintenance and construction 8

0 2

0.684 i 0.000 -

0.651 -

Ope >ations 0

0 0

0.000-0.000 0.000 Health Physics and Lab 7

0 1

0.462 0.000 0.060 Supervisory and Office staff 0

0 0

0.000 0.000 0.000 Engineering Staff 0

0 0

0.000 0.000

' 0.000. -

Refueling Operations Maintenance and construction 48 0

158 1.157 0.000

-21.069 Operations 17 0

2 0.206 0.000 0.025 Health Physics and Lab 14 0

26 1.603 0.000 2.495.

S @ervisory and Office Staff 7

0 8

0.109 0.000 2.174 Engineering staff 5

0 6

0.124 0.000 1.908

> VORK & JOB FUNCTIOP TOTALS 821

-8 1307 127.047 1.311 256.543

  1. PERSONNEL (>100 MREM)

TOTAL MAN REM STATION UTILITT COCRCT STATION UTILITT CONTRACT ORAk0 TOTALS 268 3

498 127.047 1.311 256.543-

.f a

w---

,v

O[

Report of Personnel-~and Man-Rem by Work and Job Function This report is a tabulation on a-annual basis of the.iumber of-station, utility'and other1 personnel-(including _

contractors) who received exposures greater than 100 mrem /hr and their associated man-rem exposure according to work and; job function.-

The work and job functionftotals for personnel greater 1than 100 mrem /yr are different:than grand' totals because an

' individual may perform work under more than-one work and job function during.the year.

The total man-rem is based on a ratio of the official-TLD' results.

1 4

=g

to U-602100 Page 1 of 1 EfRFORMANCE CHARACTERISTICS AND TESTS S_afety Valve and Safety / Relief Valve Challentes

(

Reference:

l'UREG-0737, Action Item II.K.3.3)

Therewere no unplanned or planned challenges to Safety Relief Valves during 1992.

Primary Coolar.t Specific Activity Analyses

(

Reference:

CPS Technical Specifications, Section 6.9.1.5(c))

All analysos for specific activity of primary coolant were within tha limits of Technical Specification 3.4.5 for 1992.