U-602100, Annual Operating Rept for Jan-Dec 1992

From kanterella
Jump to navigation Jump to search
Annual Operating Rept for Jan-Dec 1992
ML20128M592
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/31/1992
From: Spangenberg F
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
U-602100, NUDOCS 9302220223
Download: ML20128M592 (6)


Text

7 ., U. 602100 L30-93 (02-10)LP lh no ower Company Chnton Power Station P.O. Box 676 -

Cunttin. IL 61727 Te' 217 935-8881 POWER

--February 10, 1993 10CFR50,36 Docket No. 50-461 Document Control Desk Nuclear Regulatary Commission Washington, D.C. 20"55

Subject:

6HUual Operatinn Report

Dear Sir:

In accordance with Section 6.9.1.4 of the Clinton Power Station Technical. Specifications, Illinois Power. Company is submitting the attached Clinton Power Station annual Operating-Report for the period of January 1,1992 through December 31, 1992.

Sincerely yours, I

C- A.  % ,,

F. A. Spa genbe 7, III Manager, .icens ng and fety SFB/msh Attachments cc NRC Region III, Regional Administrator NRC Clinton Licensing Project Manager NRC Resident Office, V-690 Director, Office of Nuclear Regulatory Research Illinois Department of Nuclear Safety 190129

'D I

g!8 agg gggg 1

,, .. + . , -

-as ,

k #-  %. 6' 5

+

y. ,

+ m

.7 i -

,s l-t

')

'Clinton Power Station; Clinton, Illinois

^C s

P J

- Annual Operating Report January 1, 1992 through December 31,-1992 s

?

) ._

+'

-USNRC Docket 50-461' I h h l i b" Y '

.. . -I ' [Attechmantill to.Us 602100 '

.. Page' 1. of ; 2 -

Attachments

'I. Personnel Man-Rem by Work and Job Function 4. <:

II. Performance'Characceristics and Tests Safety. Valve and . Safe ty/Reitef Valve ' Challenges Primary Coolant Specific Activity Analyses p

'n i

1.

e l'

i l .-

,.-,..-.,-,,,-,.-e . , , , . , , , , . ,,,w- -- . , - . + + . , .

-ILLIN0!$ POWER COMPANT CLIN 10N POWER STAil0N-BOX 678

-CLINTON,-lLLINOIS 61727 Reg. Ouide 1.16 Report

_ Reporting tear 92

  1. PERSONNEL (>100 MREM) _ TOTAL MAN REM WORK & JOS FUNCTION -STATION UTILITT CONTRACT STATION UTILITY  ! CONTRACT Routine operations and Surveillance Maintenence and Construction 136- 3 270- 6.215- 0.238 5.949 operations 45 0 11 10.111 0.000- 0.157.

Health PhysIer and Lab 46 0 58 .15.326 0.000' 15.596' Supervisory and offlee Staff 14 0 12 1.099. 0.000 0.437 '

Engineering Staff 14 0 13 0.975 0.000 0.323 g Routine Plant Maintenance Maintenance and Construction 115 2 82 5.046 '0.159 - 1.979 operations - 31 0 '2 1.015 0.000 0.030 Heatth Physics and Lab 24 0 5 0.692 0.000 0.150-Supervisory and office Staff 4 0 2 0.067 ~ 0.000 - 0.059-Engineering Staff 9 0 0 0.227. '0.000 'O 000 Inservice Inspection Miintenance and Construction 10 0 171 0.387 0.000 40.604

-operations 3 0 3 0.064 0.000- 0.970 '

Heatth Physics and Lab 5 0 .14 0.172 0.00. 0.704 Supervisory and Office Staff 1 0 1 0.056 0.000 0.275 -

Engineering Staff 4 0 11 0.094 0.000 = 4.416 Special Plant Maintenance Naintenance and Construction 154 3 362 57.703 0.914- 147.004-Operations 45 0 12 9.602 0.000 2.262 Health Physics and Lab 39 0 44 - 8.837 0.000 3.867 Supervisory and Office Staff 13 0 9 2.632- 0.000 2.744 Engineering Staff 12 0 13 2.332 0.000- -0.876-Waste Processing Maintenance and construction 8 0 2 0.684 i 0.000 - 0.651 -

Ope >ations 0 0 0 0.000- 0.000 0.000 Health Physics and Lab 7 0 1 0.462 0.000 0.060 Supervisory and Office staff 0 0 0 0.000 0.000 0.000 Engineering Staff 0 0 0 0.000 0.000 ' 0.000 . -

Refueling Operations Maintenance and construction 48 0 158 1.157 0.000 -21.069 Operations 17 0 2 0.206 0.000 0.025 Health Physics and Lab 14 0 26 1.603 0.000 2.495.

S @ervisory and Office Staff 7 0 8 0.109 0.000 2.174 Engineering staff 5 0 6 0.124 0.000 1.908

> VORK & JOB FUNCTIOP TOTALS 821 -8 1307 127.047 1.311 256.543

  1. PERSONNEL (>100 MREM) TOTAL MAN REM STATION UTILITT COCRCT STATION UTILITT CONTRACT ORAk0 TOTALS 268 3 498 127.047 1.311 256.543-

.f

,v a w--- ,

O[ - '

Report of Personnel-~and Man-Rem by Work and Job Function This report is a tabulation on a-annual basis of the .iumber of-station, utility'and other1 personnel-(including _ _ .

contractors) who received exposures greater than 100 mrem /hr and their associated man-rem exposure according to work and; job function.-

The work and job functionftotals for personnel greater 1than 100 mrem /yr are different:than grand' totals because an

' individual may perform work under more than-one work and job function during.the year.

The total man-rem is based on a ratio of the official-TLD' results.

1 4

- =g ,, -- , ,.

. Attachment 2 to U- 602100 Page 1 of 1 EfRFORMANCE CHARACTERISTICS AND TESTS S_afety Valve and Safety / Relief Valve Challentes

(

Reference:

l'UREG-0737, Action Item II.K.3.3)

Therewere no unplanned or planned challenges to Safety Relief Valves during 1992.

Primary Coolar.t Specific Activity Analyses

(

Reference:

CPS Technical Specifications, Section 6.9.1.5(c))

All analysos for specific activity of primary coolant were within tha limits of Technical Specification 3.4.5 for 1992.

- __ _ - _ _ - - _ _ _ _ _ _ - - _ - _ _.___m.____.-____-__.__-___._m_ - - . _ _ . - __ __.__-_-_______.__m-__m. ---. - _ - - - . - _ - _ . ___ --