ML20128M561

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Epips,Including Rev 93-01 to Vol B,Change 3 to HP/0/B/1009/09,Change 7 to HP/0/B/1009/12,Change 13 to HP/0/B/1009/15 & Change 9 to HP/0/B/1009/16.W/930216 Release Memo
ML20128M561
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/19/1993
From: Hampton J
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20128M567 List:
References
NUDOCS 9302220210
Download: ML20128M561 (3)


Text

_ - _ - _ _ - _ _ - _ - - - -

'(

,m IV. lY

l'

,o p

>n-h ro I, m 1

a v,

k S

DUKCPOWER Q

January 19, 1993 U. S, Nuclear Regulatory Commission Document Control Desk Washington, D. C.

20555

Subject:

Oconee Nuclear Statica Docket Nos. 50-269, -270

-287 Emergency Plan Volume B, Revision 93-01 Volume C, Revision 93-01 Please find attached for your use and review copies of the revisions to the Oconee Nuclear StatJon Emergency Plan:

5'olume B Revision 93-01 January 12, 1993 Volume C Revision 93-01 January 12, 1993 These revisions are being submitted in accordance with 10 CFR 50-54(q) and do not decrease the effectiveness of the Emergency Plan or the Emergency Plan 1rplementing Procedures.

Please delete privacy material in the form of personal telephone numbers prior to placing in the Public Document Room, By copy of this letter, two copics of this revision are being provided to the NRC, Region 11, Atlanta, Georgia.

Very truly yours, h.W.Ilamton VP, Oconee Nuclear Site xc:

(w/2 copies of attachments)

Mr. Stewart D. Ebneter, Regional Administrator U. S. Nuclear Re,,ulatory Commission Region 11 101 Marietta Street, hW, Suite 2900 Atlanta, Georgia 30323 (w/o Attachments, Oconee Nuc. lear Station)

NRC Resident lospector C. C. Jennings, Manager, Emergency Planning i-0101M'

-1 4j

\\

9302220210 930119 PDR ADOCK 05000269 F

PDR

f

-.c t j January 19, 1993-SUDJECT:

Oconee-Nuclear Site Emergency Plan Volume B. Revision 93-01 Please make the following changes to the Emergency Plan. Volume B by following these directions:

ADJ).

D REMOVE Title Page. Rev. 92-12 Title Page, Rev. 93-01 l

Table of Contents. Pages 2&4 Table of Contents, Pages 2&4 HP/0/B/1009/09 HP/0/B/1009/09 -

Procedure for Determining the Inplant Procedure for Determining the Airborne Radiciodine Concentration Inplant Airborne Radiciodine During Accident Conditions Conc. During Accident Conditions 1/1/93-Hr/0/B/1009/12 HP/0/B/1009/12 Dist. of Potassium' Iodine Tablets Dist. of Potassium' Iodine: Tablets lu.the Event of a Radiciodine in the Event'of a'Radiciodine Release-Release - 1/1/93 HP/0/B/1009/15 HP/0/B/1009/15 Proced. for Sampling & Quantifying Proced..for Sampling and.

High Level Gaseous. Radiciodine Quantifying High Level Gaseous, L. Particulate Radioactivity Radiolodine & Particulate

-Radioactivity - 1/1/93 HP/0/B/1009/16 HP/0/B/1009/16 Proced, for Emerg. Decon, Proced. for Emerg.-Decon, of Personnel & Vehicles Onsite1 of Personnel & Vehicles Onsite-

&Efrom-offsite Remote Assembly Areas

'& from Offsite Remote Assembly-Areas;- 1/1/93-i; Radiation. Protection Manual Sect. 11.1.

' Radiation Prot.. Manual Sect.:-11.1-Radiation Protection Emerg. Response Radiation Prot. Emerg.' Response 1/1/93

' Radiation Protection Manual-Sect. 11.4 Radiation Prot. Manual" Sect.E11.4 Radiatien Prot. Site Assembly Radiation Prot. Site Assembly.

1/1/93-1 I

y

'q NUCLE AR REGULATORY COMMISSION vre.vuw ommu----

y ',3 4 g

watmwt oN. o c. rom t

l 9-

%..... +,e 7>//6/f 3

,@ 247 p n e g f Y '7# & er>x,Igp

$P~? f ggy MEMORANDUM FOR:

Chief, Document Control Branch, IRM FROM:

Director, Division of freedom of Infonnation and Publications Services, ADM

SUBJECT:

REVIEW OF UTillTY EMERGENCY PLAN DOCUMENTATION The Division of Freedom of Infonnation and Publications Services has reviewed the attached document and has detennined that it may now be made publicly available.

Ydw<~ W /$56<,

Donnie H. Grimsley, Director Division of Freedom of Infonnation and Publications Services Office of Administration 180003