ML20128M654
| ML20128M654 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 10/08/1996 |
| From: | Mccollum W DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20128M657 | List: |
| References | |
| NUDOCS 9610160142 | |
| Download: ML20128M654 (3) | |
Text
ll l
Duke (bu:er Company WtumtR AlcGwv.JR Catau ba Nuclear Generatwn Dtpartment I've1%:shlent fW ConawdRoad (8tt])DIJM oflice krk. SC3745 (8W)DIJ4%ia.r DUKEPOWER October 8,1996 m U. S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D. C. 20555
SUBJECT:
Catawba N. Icar Gytion Docket No. 50-4137 Core Operating Limits Report (COLR)
Attached, pursuant to Catawba Technical Specification 6.9.1.9, is an information copy of r6 revision to the Core Operating Limits Repon for Catawba Unit 2 Cycle 8.
This revision is being made to include the burnup dependence on the 2.32 LOCA limits for MkBW fuelin Catawba 2 Cycle 8.
Please direct questions on this matter to J. L. Lowery at (803) 831-3414.
Sincerely,
/
f.
W. R. McCollum, Jr.
\\
)
i
,/ [
9610160142.N1000 PDR ADOCK 05000414-P PDR-na a, man
U. S. Nuclear Regulatory Commission October 8,1996 Page 2 1
4 1
}
Attachment j
xc w/att:
S. D. Ebneter, Regional Administrator USNRC, Region II P. S. Tam, Project Manager USNRC,ONRR R. J. Freudenberger Senior Resident Inspector (CNS) i 4
l i
k' ii i
s i
1 d
1 i
U. S. Nuclear Regulatory Commission October 8,1996 Page 3 bxc w/att:
ELL EC050 M. S. Kitlan CN0lRC R. H. Clark EC08G General Office Document Control EC03C-R. M. Propst (2 copies)
CN03CH NCMPA-1 NCEMC PMPA SREC Document Control File CN-801.01 Group File CN-801.01
_