Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129A141 + (17:19:58, 12 December 2024)
- ML20129A140 + (17:19:59, 12 December 2024)
- ML20129A136 + (17:20:00, 12 December 2024)
- 05000409/LER-1985-010, :on 850424,degraded Fire Barrier Penetration Discovered.Caused by Improper Installation.Barriers Repaired.Caution Sign Posted Near Electrical Penetrations in Fire Barriers Protecting safety-related Areas + (17:20:02, 12 December 2024)
- 05000413/LER-1985-038, :on 850110,valve Stroke Time Test Not Performed After Steam Leak Repair.Caused by Personnel Error.Stroke Time Test Performed & Personnel Retrained + (17:20:04, 12 December 2024)
- ML20129A131 + (17:20:05, 12 December 2024)
- ML20129A130 + (17:20:06, 12 December 2024)
- ML20129A129 + (17:20:06, 12 December 2024)
- ML20129A128 + (17:20:07, 12 December 2024)
- ML20129A125 + (17:20:08, 12 December 2024)
- ML20129A122 + (17:20:09, 12 December 2024)
- ML20129A123 + (17:20:09, 12 December 2024)
- ML20129A120 + (17:20:10, 12 December 2024)
- ML20129A116 + (17:20:11, 12 December 2024)
- ML20129A118 + (17:20:11, 12 December 2024)
- W3P85-1420, Potentially Reportable Deficiency Rept PRD-180 Re Failure to Maintain Adequate Document Control of Vendor Manuals. Initially Reported on 840918.Submittal of Written Rept on Deficiency Rescheduled for 850801 + (17:20:12, 12 December 2024)
- ML20129A113 + (17:20:13, 12 December 2024)
- ML20129A112 + (17:20:14, 12 December 2024)
- 05000423/LER-1996-035, Forwards LER 96-035-00.MOV Calculations Will Be Revised Based on Bounding Application Factor/Pullout Efficiency or MOV Specific Performance Characteristics Prior to start-up from Current Outage + (17:20:14, 12 December 2024)
- ML20129A109 + (17:20:15, 12 December 2024)
- ML20129A107 + (17:20:16, 12 December 2024)
- ML20129A106 + (17:20:16, 12 December 2024)
- ML20129A104 + (17:20:17, 12 December 2024)
- ML20129A099 + (17:20:24, 12 December 2024)
- ML20129A094 + (17:20:27, 12 December 2024)
- ML20129A093 + (17:20:27, 12 December 2024)
- ML20129A088 + (17:20:28, 12 December 2024)
- ML20129A089 + (17:20:28, 12 December 2024)
- ML20129A087 + (17:20:29, 12 December 2024)
- IR 05000382/1996008 + (17:22:10, 12 December 2024)
- ML20129A081 + (17:22:10, 12 December 2024)
- 05000333/LER-1985-017, :on 850610,reactor Scram Occurred.Caused by MSIV Closure While in Run Mode Due to Improper Valve Lineup on Steam Flow Instrumentation.Scram Procedures Followed & Personnel Reinstructed + (17:22:13, 12 December 2024)
- ML20129A076 + (17:22:14, 12 December 2024)
- ML20129A074 + (17:22:15, 12 December 2024)
- ML20129A072 + (17:22:18, 12 December 2024)
- ML20129A065 + (17:22:19, 12 December 2024)
- ML20129A067 + (17:22:19, 12 December 2024)
- ML20129A064 + (17:22:20, 12 December 2024)
- ML20129A063 + (17:22:21, 12 December 2024)
- ML20129A062 + (17:22:22, 12 December 2024)
- 05000315/LER-1985-027, :on 850604,during Hydrostatic Testing,Three 8-inch Diameter Fire Penetrations Found Nonfunctional.Cause for Removal of Silicone Foam Undetermined.Openings Sealed & Safety Evaluation Performed + (17:22:24, 12 December 2024)
- ML20129A057 + (17:22:25, 12 December 2024)
- ML20129A055 + (17:22:26, 12 December 2024)
- ML20129A053 + (17:22:27, 12 December 2024)
- ML20129A051 + (17:22:28, 12 December 2024)
- ML20129A052 + (17:22:28, 12 December 2024)
- ML20129A050 + (17:22:29, 12 December 2024)
- 05000361/LER-1985-027, :on 850507,containment Purge Isolation Sys Actuated.Caused by Noise Spike on Containment Area Radiation Monitor 2RT-7856.Detailed Study of Plant Ground Sys in Progress + (17:22:32, 12 December 2024)
- ML20129A045 + (17:22:34, 12 December 2024)
- ML20129A044 + (17:22:34, 12 December 2024)
- ML20129A042 + (17:22:35, 12 December 2024)
- ML20129A041 + (17:22:35, 12 December 2024)