Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129A389 + (17:17:14, 12 December 2024)
- ML20129A387 + (17:17:15, 12 December 2024)
- ML20129A388 + (17:17:15, 12 December 2024)
- ML20129A384 + (17:17:16, 12 December 2024)
- ML20129A386 + (17:17:16, 12 December 2024)
- ML20129A382 + (17:17:18, 12 December 2024)
- ML20129A381 + (17:17:19, 12 December 2024)
- ML20129A379 + (17:17:20, 12 December 2024)
- ML20129A378 + (17:17:23, 12 December 2024)
- ML20129A376 + (17:17:24, 12 December 2024)
- ML20129A375 + (17:17:24, 12 December 2024)
- ML20129A370 + (17:17:25, 12 December 2024)
- ML20129A369 + (17:17:26, 12 December 2024)
- ML20129A364 + (17:17:27, 12 December 2024)
- ML20129A365 + (17:17:27, 12 December 2024)
- ML20129A362 + (17:17:28, 12 December 2024)
- ML20129A360 + (17:17:29, 12 December 2024)
- ST-HL-AE-1274, Forwards Updated Response to Generic Ltr 83-28 Re Generic Implications of Salem ATWS Events.Sections 4.1,4.2.1 & 4.2.2 Address NRC 850530 Request.Action Item 15 Closed.Automatic Shunt Trip Mod Info Will Be Submitted by 851001 + (17:17:29, 12 December 2024)
- ML20129A359 + (17:17:30, 12 December 2024)
- ML20129A358 + (17:17:30, 12 December 2024)
- 05000344/LER-1985-005, :on 850601,1/2-inch Circumferential Crack Discovered in Test Connection Pipe During Local Leak Rate Testing of Containment Penetration P-50.Caused by Fatigue. Pipe Replaced.Similar Test Connections Checked + (17:17:32, 12 December 2024)
- ML20129A354 + (17:17:34, 12 December 2024)
- ML20129A355 + (17:17:34, 12 December 2024)
- ML20129A353 + (17:17:35, 12 December 2024)
- ML20129A351 + (17:17:36, 12 December 2024)
- IR 05000318/2004022 + (17:17:51, 12 December 2024)
- ML20129A346 + (17:17:52, 12 December 2024)
- ML20129A349 + (17:17:52, 12 December 2024)
- 05000275/LER-1985-019, :on 850602,limiting Condition for Operation Time Requirement Exceeded Re Thermocouple Monitoring Sys Channel Check.Caused by Personnel Failure to Review Computer Generated Preventive Maint Tracking Sys + (17:17:55, 12 December 2024)
- ML20129A342 + (17:17:56, 12 December 2024)
- ML20129A340 + (17:17:56, 12 December 2024)
- ML20129A339 + (17:17:57, 12 December 2024)
- ML20129A336 + (17:17:58, 12 December 2024)
- ML20129A334 + (17:17:58, 12 December 2024)
- ML20129A333 + (17:17:59, 12 December 2024)
- ML20129A331 + (17:18:00, 12 December 2024)
- ML20129A327 + (17:18:01, 12 December 2024)
- ML20129A325 + (17:18:02, 12 December 2024)
- ML20129A322 + (17:18:02, 12 December 2024)
- ML20129A321 + (17:18:03, 12 December 2024)
- ML20129A320 + (17:18:03, 12 December 2024)
- U-600075, Forwards Advance Copies of FSAR Changes Requested,Per 850509 Agreements.Encl Changes Will Be Incorporated Into FSAR Amend 34 Scheduled for Issuance in Jul 1985.Status Rept of Observation Repts Already Committed to Also Encl + (17:18:05, 12 December 2024)
- ML20129A318 + (17:18:05, 12 December 2024)
- ML20129A316 + (17:18:06, 12 December 2024)
- ML20129A315 + (17:18:07, 12 December 2024)
- ML20129A311 + (17:18:08, 12 December 2024)
- ML20129A314 + (17:18:08, 12 December 2024)
- 05000344/LER-1984-021, :on 841011,high Svc Water Strainer Differential Pressure Alarms Received on Both Svc Water Trains.Caused by Suspended Mud,Silt & Organic Matter Entering Svc Water Intake Structure Due to Wake from Passing Ship + (17:18:10, 12 December 2024)
- ML20129A309 + (17:18:11, 12 December 2024)
- NRC-96-0109, Summarizes Results of Evaluation & Describes Remaining Activities That Will Be Completed Prior to Restart from Upcoming Fifth Refueling Outage + (17:18:12, 12 December 2024)
- ML20129A305 + (17:18:13, 12 December 2024)
- ML20129A306 + (17:18:13, 12 December 2024)