ML20129A362

From kanterella
Jump to navigation Jump to search
Partial Response to FOIA Request for Documents Generated in Connection W/Sser 22,NUREG-0675 Re Operation of Facilities. App a Documents Available in PDR
ML20129A362
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/18/1984
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Devine T, Dixon C
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML20129A367 List:
References
FOIA-84-744, RTR-NUREG-0675, RTR-NUREG-675 NUDOCS 8506040560
Download: ML20129A362 (4)


Text

__ _ _ _ . ._

s...._ rr .3 8

/

,, ,,a o,, UNITED STATES Y ~Olb o

NUCLEAR REGULATORY COMMISSION p WASHING TON, D. C. 20555 9.

f

\ . . . . . *#  ;"/18 igal Mr. Thomas Devine Ms. Crystal Dixon Government Accountability Project Institute for Policy Studies 1901 Que Street, hA Washington, DC 20009 IN RESPONSE REFER TO F01A-84-744

Dear Mr. Devine and Ms. Dixon:

This is in partial response to your letter dated September 13, 1984, in which you requested, pursuant to the Freedom of Infonnation Act, all documents relevant to and/or generated in connection with the Safety Evaluation Report (SER) related to the operation of the Diablo Canyon Nuclear Power Plant Units 1 and 2, NUREG-0675, Supplement No. 22.

Copies of the documents listed on enclosed Appendix A are~ being placed in the NRC Public Washington, Document Room (PDR) located at 1717 H Street, NW, DC 20555.

ur. der your name.

They will be filed in PDR folder FOIA-84-744 The to yourNRC has not completed its review of the remaining documents subject request.

We will respond as soon as that review is completed.

Sincerely,

. M. Felton, Director Division of Rules and Records Office of Administration

Enclosure:

As stated l

l So-%75 s o-3&3 8506040560 841118 PDR FOIA DEVINE84-744 PDR

t'

1. 04/16/82 PGandE Resolution Sheet IDVP File No. 1016 34
2. 06/16/82 General Co,nputation Sheet 5 Discrepancy Report 50
3. 03/02/77
4. 12/10/76 Procedure For Establishing Acceptance Criteria For Concrete Anchor Installations Diablo Canyon Power Plant 15
5. 07/02/77 ,

03/03/77 1 02/14/77 01/21/77 M.W. Kellogg Company Q. A. yf Instruction No. 98, Procedure For Inspection Of Existing Concrete Expansion Anchors In Hanger Installation 27

6. 09/02/78 Acceptance Criteria For Concrete Expansion Anchors Diablo Canyon l'roject 4 4 7. 03/02/77 Discrepency Report 2
8. 02/23/78 Concrete Expansion Anchors For Static And Seismic Loading 4 4

Discrepency Report 44

9. 04/19/77
10. 09/10/82 Diablo Canyon Project Pacific Gas And Electric Company l Bechtel Power Corporation 9
11. 09/10/82 "As Built" G-140-1-notag S-102 Mounted From Ceiling Pacific Gas And Electric Co. 50
12. 01/17/84 Minor Variation Report, Diablo l Canyon, Endurance Metal Products 13 l'

L

'. Re: FOIA-84-744

'~ .

APPENDIX-(Continued)

13. 02/07/84 PGandE Letter No. OCL-84-047 5
14. 01/17/84 Minor Variation Report, Diablo Canyon, PTGC Electrical 1 03/01/83 Design Criteria Memorandum 37 15.
16. 11/07/83 Diablo Canyon Nuclear Power Plant Quality Control Procedure For Installation And Inspection Of Stud And Shell Concrete Expansion Anchors 13
17. NA Howard P. Foley, QCP-9 Rev. 6 1
18. 12/16/83 QCP-9 " Installation and Inspec-tion of Stud and Shell Concrete Anchors" 1
19. HPF/ABIR 11/07/83 Foley Electric Co., Anchor Bolt Inspection Report 1
20. 09/29/78 Foley Electric Co., Procedure For Inspecting In The Grid -13
21. NA Concrete Expansion Anchors For Static And Seismic Loading 4

{

22. 10/23/80 Anchor Bolt Installation Inspec- '

tion Report 1

23. 08/23/83 Criteria V " Instructions Proced-ure ..." 2 09/15/78 Pullman Power Products 2 24.
25. 01/27/84 Pacific Gas And Electric Company, Response to Allegations 25,58 and 96 - SSER 21 18
26. 02/07/84 PGandE Letter No: DCL-84-048 18
27. 02/16/84 PGandE Letter No: DCL-84-059 29
28. 03/06/84 Facsimile Transmittal Request D. Kirsch 8
29. 01/20/84 Write-up: Foley: changes to quality documents 8
30. 01/24/84 Mark up Copy of PGandE Letter No. DCL-84 , Quality Assurance Record Review 10
31. 01/04/84 Entrance Interview Continuing Special Inspection 1

p Re: FOIA-84-744

- APPENDIX-(Continued)

32. NA Document Turnover Section 1
33. 06/22/83 The Howard P. Foley Company Document Deficiency Notice 4 34, 12/21/76 Quality Assurance Unit 1 Document Turnover Audits 3 Document Turnover Review 5
35. 08/10/83
36. 11/ /83 Diablo Canyon Project Quality Assurance 3
37. 10/06/83 Correction of Quality Documents 2 Standards Practice Methods 3
38. 06/29/76
39. 08/03/76 Letter to all department Managers 1 i

.---.--.,-n, --

. . . - - , , , . . - , , , , - - - - .--,.n-._ --- ,.n--, , , , - - ---. . . . , _ - - - , - . , , - _ . . - . . - _ . --.