Partial Response to FOIA Request for Documents Generated in Connection W/Sser 22,NUREG-0675 Re Operation of Facilities. App a Documents Available in PDR
ML20129A362
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/18/1984
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Devine T, Dixon C
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML20129A367 List:
References
FOIA-84-744, RTR-NUREG-0675, RTR-NUREG-675 NUDOCS 8506040560
Download: ML20129A362 (4)


Text

__

s...._ rr.3 Y ~Olb

,,,,a

/

8 o,,

UNITED STATES NUCLEAR REGULATORY COMMISSION o

p WASHING TON, D. C. 20555 9.

f

\\..... *#

"/18 igal Mr. Thomas Devine Ms. Crystal Dixon Government Accountability Project Institute for Policy Studies 1901 Que Street, hA IN RESPONSE REFER Washington, DC 20009 TO F01A-84-744

Dear Mr. Devine and Ms. Dixon:

This is in partial response to your letter dated September 13, 1984, in which you requested, pursuant to the Freedom of Infonnation Act, all documents relevant to and/or generated in connection with the Safety Evaluation Report (SER) related to the operation of the Diablo Canyon Nuclear Power Plant Units 1 and 2, NUREG-0675, Supplement No. 22.

Copies of the documents listed on enclosed Appendix A are~ being placed in the NRC Public Document Room (PDR) located at 1717 H Street, NW, Washington, DC 20555.

They will be filed in PDR folder FOIA-84-744 ur. der your name.

The NRC has not completed its review of the remaining documents subject to your request.

We will respond as soon as that review is completed.

Sincerely,

. M. Felton, Director Division of Rules and Records Office of Administration

Enclosure:

As stated l

l So-%75 s o-3&3 8506040560 841118 PDR FOIA DEVINE84-744 PDR

t' Re: F01A-84-744 APPENDIX NUMER DATE TITLE PAGES 1.

04/16/82 PGandE Resolution Sheet IDVP File No. 1016 34 2.

06/16/82 General Co,nputation Sheet 5

3.

03/02/77 Discrepancy Report 50 4.

12/10/76 Procedure For Establishing Acceptance Criteria For Concrete Anchor Installations Diablo Canyon Power Plant 15 5.

07/02/77 03/03/77 1

02/14/77 01/21/77 M.W. Kellogg Company Q. A.

yf Instruction No. 98, Procedure For Inspection Of Existing Concrete Expansion Anchors In Hanger Installation 27 6.

09/02/78 Acceptance Criteria For Concrete Expansion Anchors Diablo Canyon l'roject 4

7.

03/02/77 Discrepency Report 2

4 8.

02/23/78 Concrete Expansion Anchors For Static And Seismic Loading 4

4 9.

04/19/77 Discrepency Report 44 10.

09/10/82 Diablo Canyon Project Pacific Gas And Electric Company l

Bechtel Power Corporation 9

11.

09/10/82 "As Built" G-140-1-notag S-102 Mounted From Ceiling Pacific Gas And Electric Co.

50 12.

01/17/84 Minor Variation Report, Diablo Canyon, Endurance Metal Products 13 l

l' L

Re: FOIA-84-744

'~

APPENDIX-(Continued) 13.

02/07/84 PGandE Letter No. OCL-84-047 5

14.

01/17/84 Minor Variation Report, Diablo Canyon, PTGC Electrical 1

15.

03/01/83 Design Criteria Memorandum 37 16.

11/07/83 Diablo Canyon Nuclear Power Plant Quality Control Procedure For Installation And Inspection Of Stud And Shell Concrete Expansion Anchors 13 17.

NA Howard P. Foley, QCP-9 Rev. 6 1

18.

12/16/83 QCP-9 " Installation and Inspec-tion of Stud and Shell Concrete Anchors" 1

19.

HPF/ABIR 11/07/83 Foley Electric Co., Anchor Bolt Inspection Report 1

20.

09/29/78 Foley Electric Co., Procedure For Inspecting In The Grid

-13 21.

NA Concrete Expansion Anchors For

{

Static And Seismic Loading 4

22.

10/23/80 Anchor Bolt Installation Inspec-tion Report 1

23.

08/23/83 Criteria V " Instructions Proced-ure..."

2 24.

09/15/78 Pullman Power Products 2

25.

01/27/84 Pacific Gas And Electric Company, Response to Allegations 25,58 and 96 - SSER 21 18 26.

02/07/84 PGandE Letter No: DCL-84-048 18 27.

02/16/84 PGandE Letter No: DCL-84-059 29 28.

03/06/84 Facsimile Transmittal Request D. Kirsch 8

29.

01/20/84 Write-up: Foley: changes to quality documents 8

30.

01/24/84 Mark up Copy of PGandE Letter No. DCL-84

, Quality Assurance Record Review 10 31.

01/04/84 Entrance Interview Continuing Special Inspection 1

Re: FOIA-84-744 p

APPENDIX-(Continued) 32.

NA Document Turnover Section 1

33.

06/22/83 The Howard P. Foley Company Document Deficiency Notice 4

34, 12/21/76 Quality Assurance Unit 1 Document Turnover Audits 3

35.

08/10/83 Document Turnover Review 5

36.

11/ /83 Diablo Canyon Project Quality Assurance 3

37.

10/06/83 Correction of Quality Documents 2

38.

06/29/76 Standards Practice Methods 3

39.

08/03/76 Letter to all department Managers 1 i

.---.--.,-n,

.--,.n-._

,.n--,

--