Order Revoking CPPR-88,based on Util 840127 Plan to Convert Facility to Coal Fuel
ML20129A375
Person / Time
Site: Zimmer
Issue date: 05/16/1985
From: Thompson H
Office of Nuclear Reactor Regulation
To:
CINCINNATI GAS & ELECTRIC CO.
Shared Package
ML20129A374 List:
References
NUDOCS 8506040564
Download: ML20129A375 (2)


Text

_

r .

r

p. ,

UNITED STATES OF. AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of .

Cincinnati Gas & Electric Company Dayton Power & Light Company Docket.No. 50-358 Columbus & Southern Ohio Electric Company ORDER REVOKING CONSTRUCTION PERMIT h

Construction Permit No. CPPR-88 authorizes construction of the Wm. H.

Zimmer Nuclear Power Station, Unit 1, located in Moscow, Ohio, approximately 24 miles southeast of Cincinnati, Ohio. This construction permit is held by Cincinnati Gas and Electric Company (CG&E or permittee) on its own behalf and.

on behalf of Dayton Power and Light Company and Columbus and Southern Ohio Electric Company. Construction Permit No. CPPR-88 was issued on October 27, 1972. . The latest construction completion date in the permit, as amended, was December 31, 1982. CG&E filed a timely request on November 24, 1982 to extend the latest completion.date to December 31, 1984. .

II.

On January 27, 1984, CG&E informed the Commission that the owners of Zimer Unit 1 planned to convert the nuclear fueled facility to a coal fueled plant.

By motion dated March 20, 1984, CG&E requested the Atomic Safety and Licensing Board (ASLB) to authorize withdrawal of its application for a license to operate 8506040564 850516 PDR ADOCK 05000358 A PDR

y the Zimmer. Station; CG&E removed all nuclear fuel from the site and disabled.

the reactor so that it could not be operated as a nuclear fuel . utilization facility. The ASLB' authorized withdrawal of the operating license application on August 29, 1984, subject to staff verification that the site would be re-stored to stable environmental conditions. The NRC staff verified that CG&E had satisfactorily restored the site to an environmentally stable condition.

The environmental impact of terminating the plant construction at this stage of completion was assessed by the NRC staff. Pursuant to 10 CFR 51.32, the Commission has determined that the termination of this construction permit will have no significant impact on the environment. An Environmental Assess-r ment and Finding of No Significant Impact was published in the Federal Register on April 16 ,1985 (50 FR 15010).

III.

A notice of withdrawal of the Zimmer operating license application was published in the Federal-Register on November 8, 1984 (49 FR 44695).

For reasons set forth above, it is hereby ordered that Construction Permit No. CPPR-88 is revoked.

This Order is effective upon issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

_$ff-fhk#ulfar Hugh L. bESiiYh/rJr., Director Division of Licensing Office of Nuclear Reactor Regulation 985 Effective Date: MAY ,

LR T:DL LB 4:DL LB O / D:DL I MRu ook:kab LKintner BJio ngblood K'EL M y A t' ,k HT ompson 03/g/85 03/0[/85 03/()/85 03/s2/85  % U< /85 /85

. Y

.