Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129C898 + (16:51:59, 12 December 2024)
- 05000413/LER-1985-039, :on 850523,spacers Required for Seismic Qualification of Channel 2 Vital Battery Bank 1EBB Not Reinstalled After Cells of Bank Replaced.Caused by Personnel Error.Spacers Replaced + (16:52:02, 12 December 2024)
- ML20129C892 + (16:52:03, 12 December 2024)
- ML20129C891 + (16:52:04, 12 December 2024)
- ML20129C889 + (16:52:05, 12 December 2024)
- ML20129C883 + (16:52:06, 12 December 2024)
- ML20129C885 + (16:52:06, 12 December 2024)
- U-600126, Forwards Proposed Tech Spec 3/4.4.1 Re Implementation of Improved Stability Monitoring During High Power,Low Flow Operating Conditions as Resolution of Open SER License Condition 2 Concerning Thermal Hydraulic Stability + (16:52:07, 12 December 2024)
- ML20129C879 + (16:52:08, 12 December 2024)
- ML20129C875 + (16:52:09, 12 December 2024)
- ML20129C878 + (16:52:09, 12 December 2024)
- ML20129C874 + (16:52:10, 12 December 2024)
- ML20129C871 + (16:52:11, 12 December 2024)
- ML20129C870 + (16:52:11, 12 December 2024)
- ML20129C869 + (16:52:12, 12 December 2024)
- ML20129C868 + (16:52:13, 12 December 2024)
- ML20129C865 + (16:52:13, 12 December 2024)
- IR 05000184/1985002 + (16:52:14, 12 December 2024)
- 05000397/LER-1985-040, :on 850606,two Reactor Protection Sys Actuations Occurred.Caused by Reactor Recirculation Sys Pump 1B Testing Evolution.Temporary Reactor Recirculation Sys Pump 1B Testing Procedure Canceled + (16:52:16, 12 December 2024)
- ML20129C860 + (16:52:17, 12 December 2024)
- ML20129C859 + (16:52:18, 12 December 2024)
- ML20129C858 + (16:52:18, 12 December 2024)
- ML20129C853 + (16:52:19, 12 December 2024)
- ML20129C852 + (16:52:20, 12 December 2024)
- ML20129C847 + (16:52:20, 12 December 2024)
- ML20129C846 + (16:52:21, 12 December 2024)
- ML20129C845 + (16:52:22, 12 December 2024)
- ML20129C842 + (16:52:22, 12 December 2024)
- ML20129C837 + (16:52:23, 12 December 2024)
- ML20129C835 + (16:52:23, 12 December 2024)
- 05000263/LER-1985-012, :on 850603,reactor Bldg Ventilation Isolation & Initiation of Standby Gas Treatment Sys Occurred.Caused by Personnel Error While Performing Maint Procedure on Channel a Reactor Bldg Vent wide-range Gas Monitor + (16:52:25, 12 December 2024)
- B11581, Informs That Schedule for Human Factors Review for Fire Protection Will Be Included in Control Room Design Review Program.Review Performed Per Suppl 1 to NUREG-0737.Safe Shutdown Procedures Will Be Implemented Following Mods + (16:52:26, 12 December 2024)
- ML20129C828 + (16:52:27, 12 December 2024)
- ML20129C823 + (16:52:28, 12 December 2024)
- IR 05000440/1985029 + (16:52:30, 12 December 2024)
- ML20129C821 + (16:52:30, 12 December 2024)
- ML20129C820 + (16:52:31, 12 December 2024)
- ML20129C819 + (16:52:31, 12 December 2024)
- ML20129C818 + (16:52:32, 12 December 2024)
- IR 05000506/2006017 + (16:52:33, 12 December 2024)
- ML20129C816 + (16:52:33, 12 December 2024)
- ML20129C809 + (16:52:34, 12 December 2024)
- ML20129C808 + (16:52:35, 12 December 2024)
- ML20129C807 + (16:52:35, 12 December 2024)
- ML20129C806 + (16:52:36, 12 December 2024)
- 05000374/LER-1996-006-08, :on 960918,Unit 2A & 2B RHR SW Pumps Not Tested Per ASME Section XI Due to Human Performance Error. Tested RHR SW Pumps IAW Special Test LST-96-069 in Full Compliance W/Asme/Ansi Part 6 + (16:52:38, 12 December 2024)
- IR 05000511/2006021 + (16:52:39, 12 December 2024)
- ML20129C803 + (16:52:39, 12 December 2024)
- ML20129C799 + (16:52:40, 12 December 2024)
- ML20129C795 + (16:52:41, 12 December 2024)
- ML20129C793 + (16:52:42, 12 December 2024)
- ML20129C792 + (16:52:42, 12 December 2024)