ML20129C842
| ML20129C842 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 06/25/1985 |
| From: | Hunter D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Cambell T ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20129C848 | List: |
| References | |
| NUDOCS 8507160347 | |
| Download: ML20129C842 (2) | |
Text
-
jfUb i 1 -,
JUN 2 5 BE In Reply Refer To:
Docket:
50-313/0L-85-02 Arkansas Power & Light ATTN:
T. Gene Campbell Vice President - Nuclear Operations P.O. Box 551 Little Rock, Arkansas 72203 Gentlemen:
SUBJECT:
REACTOR OPERATOR AND SENIOR REACTOR OPERATOR LICENSING EXAMINATIONREPORT(0L-35-02)
During the week of May 20, 1985 NRC administered Reactor Operator and Senior Reactor Operator examinations at Arkansas Nuclear One - Unit 1.
These examinations involved one site visit. The results of these examinations have been discussed with those members of your staff identified in the enclosed report.
In summary, nine of the ten candidates successfully completed these examinations and have been issued the appropriate licenses.
Should you have any questions concerning this letter, please contact us.
Sincerely,
" Original Signed By:
D. R. HUNTER
Darwin R. Hunter, Chief Reactor Projects Branch 2
Enclosures:
as stated cc w/ enclosures:
J. M. Levine, General Manager Arkansas Nuclear One P.O. Box 608 Russellville, Arkansas 72801 J. Vandergrift, Training Superintendent (Same address)
E. Force, Operations Training Supervisor, Unit 1 (Same address)
Arkansas Radiation Control Program Director 8507160347 050625
((I PDR ADOCK 0500 13 4
A
e o
l bec to DM9 (IE42) bec distrib. by RIV w/ encl.:
Resident Inspector R. Martin. RA RP82 Section Chief (RPB2/A)
R. Denise, DRS&P RIV File D. Weiss,LFMB(AR-2015)
R. Cooley J. Pellet E. Haycraft W. Apley, Battelle, PNL, P. O. Box 999, Richland, WA 99352
/
RACool(eyh b RPB2 4/
RPB2 RPB JPellet DRHu er 6/z1/85 6/jg/85 6/y85
- - - - - - - - - -