U.S. NUCLEAR REGULATORY COMMISSION
REGION I
Report No.
50-184/85-02 Docket No.
50-184 License No. TR-5 Licensee:
U. S. Department of Commerce National Bureau of Standards Washington, D. C. E234 l
Facility Name: National B eeau of Standards Inspection At: Gaitherburg, Maryland Inspection Conducted: April 23, 1985 Date of Last Physical Security Inspection:
February 8, 1983 Type of Inspection: Unanncunced Physical Protection Inspector:
</ I f-9 -BS'
S th,[hy ecurity date Accompanied by:
R. Rosano, Security Specialist, Inspector and forcement NRC HQ Approved by:
- f-Mf p. Ifeimi p ChipffSafeguards date 6ection, Nuclear Waterials Safety and Safeguards Inspection Summary: Routine, Unannounced Physical Protection Inspection on April 23, 1985, (Report No. 50-184/85-02)
Areas inspected: Physical protection measures for protecting special nuclear material of moderate strategic significance. The inspection involved 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> on-site by one NRC Region-Based Inspector and one NRC:01E Security Specialist.
Results: The licensee was in compliance with NRC regulations in the area
. inspected.
8506050688 850515 PDR ADOCK 05000194 G
__
_
_.
-_-
_
_.
_ _ _ - _ _ - _ _ _ - _ _ _ _...
.
7..
DETAILS
'1.
-Key Persons Contacted
- Dr.~-R. Carter, Reactcr Division Chief
- Mr. T. Raby,. Chief Reactor Operations
.
.I
-
Mr. J. Torrence, Deputy Chief Reactor Operations
.Mr. W. Rabbitt, Security Officer
- present at the exit. interview 2.
30703 - Exit Interview-The inspector met with licensee representatives (denoted in paragraph 1)
,at the conclusion of the inspection on April 23, 1985. At that time, the J
. purpose and scope of the inspection were reviewed and the findings' were
'
presented.
l 3.
81480-General-Requirements for'Special Nuclear Materials of Moderate Strategic Significance The' licensee was protecting special nuclear material in conformance with-the physical security. plan. The physical security plan met the gen'eral performance requirements and objectives of the governing regulations.
.