Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132D926 + (14:56:09, 12 December 2024)
- ML20132D924 + (14:56:09, 12 December 2024)
- ML20132D922 + (14:56:12, 12 December 2024)
- ML20132D919 + (14:56:13, 12 December 2024)
- ML20132D918 + (14:56:14, 12 December 2024)
- ML20132D917 + (14:56:14, 12 December 2024)
- ML20132D916 + (14:56:15, 12 December 2024)
- ML20132D915 + (14:56:15, 12 December 2024)
- ML20132D914 + (14:56:16, 12 December 2024)
- ML20132D912 + (14:56:17, 12 December 2024)
- ML20132D913 + (14:56:17, 12 December 2024)
- ML20132D908 + (14:56:18, 12 December 2024)
- ML20132D911 + (14:56:18, 12 December 2024)
- ML20132D907 + (14:56:19, 12 December 2024)
- ML20132D905 + (14:56:20, 12 December 2024)
- ML20132D904 + (14:56:20, 12 December 2024)
- ML20132D903 + (14:56:21, 12 December 2024)
- ML20132D901 + (14:56:22, 12 December 2024)
- ML20132D902 + (14:56:22, 12 December 2024)
- ML20132D897 + (14:56:23, 12 December 2024)
- NSD-NRC-96-4907, Responds to Item 6.a(9) of NRC Re Explanation of Why VBS Does Not Isolate on Containment Isolation + (14:56:23, 12 December 2024)
- IR 05000322/1985030 + (14:56:27, 12 December 2024)
- ML20132D894 + (14:56:28, 12 December 2024)
- ML20132D890 + (14:56:29, 12 December 2024)
- ML20132D889 + (14:56:29, 12 December 2024)
- BECO-85-172, Revised Application for Amend to License DPR-35,changing Proposed Tech Specs Re Implementation of Inservice Insp Program & Snubber Testing Requirements.Minor Changes Made to Page 224,Section 6.10.B.5.Revised Page 224 Encl + (14:56:30, 12 December 2024)
- HL-5264, Forwards Revisions to Physical Security Plan for Ei Hatch. Encl Withheld + (14:56:31, 12 December 2024)
- ML20132D885 + (14:56:31, 12 December 2024)
- ML20132D884 + (14:56:32, 12 December 2024)
- ML20132D880 + (14:56:33, 12 December 2024)
- ML20132D882 + (14:56:33, 12 December 2024)
- ML20132D877 + (14:56:34, 12 December 2024)
- ML20132D875 + (14:56:34, 12 December 2024)
- B15970, Provides NRC W/Info Required to Assess Util Proposed Selection of Contractor & Independent Verification Team for Conduct of Independent CA Verification Program for Plant Unit 3.NRC Approval of Proposed Contractor & Team Requested + (14:56:35, 12 December 2024)
- IR 05000315/1985018 + (14:56:37, 12 December 2024)
- PNO-IV-96-068, on 961217,reported Troxler Asphalt Content Gauge,Model 3241C,stolen from Trailer at San Xavier Rock & Matls in Tucson.Gauge Contains 100-mCi Am-241 Sealed Source. Lab & Computer Equipment Stolen Also + (14:56:37, 12 December 2024)
- ML20132D867 + (14:56:38, 12 December 2024)
- ML20132D864 + (14:56:39, 12 December 2024)
- ML20132D862 + (14:56:40, 12 December 2024)
- NSD-NRC-96-4913, Forwards W Responses to NRC RAI Re in-vessel Retention of Molten Core Debris & Response to NRC Request Made at 960624-26 W/Nrc AP600 PRA Meeting + (14:56:40, 12 December 2024)
- NSD-NRC-96-4874, Forwards Copies of Design Issues Tracking Repts for Human Factors Issues & Makeup of AP600 SSAR Chapter 18 to Reflect Resolution of Listed Dser Open Item Tracking Sys Items for NUREG-0711 Elements 2 & 4 + (14:56:41, 12 December 2024)
- ML20132D853 + (14:56:45, 12 December 2024)
- NSD-NRC-94-4916, Forwards Outline of Plan to Address Uncertainty of Temp Profiles for Thermal Stratification & Methods to Be Used for Review + (14:56:46, 12 December 2024)
- ML20132D850 + (14:56:46, 12 December 2024)
- ML20132D849 + (14:56:47, 12 December 2024)
- ML20132D848 + (14:56:48, 12 December 2024)
- PLA-2466, Monthly Operating Repts for Apr 1985 + (14:56:52, 12 December 2024)
- PNO-III-96-075, on 961216,hosp Performed Radiation Surveys on Packages & Found Elevated Radiation Levels at Surface of Two Packages.Licensee Survey Showed Radiation Levels of 400 Mrem Per H at Surface of Package + (14:56:52, 12 December 2024)
- ML20132D843 + (14:56:53, 12 December 2024)
- ML20132D841 + (14:56:54, 12 December 2024)
- 05000265/LER-1996-003-13, :on 961112,Unit 2 LPCI Was Declared Inoperable to 2D RHR Pump Discharge Check Valve Failure.Lpci Kf Was re-established within 1 Hour & Operability Determination Was Completed for PIF 96-3196 + (14:56:56, 12 December 2024)
- NG-96-2597, Forwards Response to RAI Re thermo-lag Related Ampacity Derating Issues + (14:56:57, 12 December 2024)