BECO-85-172, Revised Application for Amend to License DPR-35,changing Proposed Tech Specs Re Implementation of Inservice Insp Program & Snubber Testing Requirements.Minor Changes Made to Page 224,Section 6.10.B.5.Revised Page 224 Encl

From kanterella
Jump to navigation Jump to search
Revised Application for Amend to License DPR-35,changing Proposed Tech Specs Re Implementation of Inservice Insp Program & Snubber Testing Requirements.Minor Changes Made to Page 224,Section 6.10.B.5.Revised Page 224 Encl
ML20132D888
Person / Time
Site: Pilgrim
Issue date: 09/24/1985
From: Harrington W
BOSTON EDISON CO.
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML20132D892 List:
References
BECO-85-172, NUDOCS 8509300319
Download: ML20132D888 (2)


Text

__

.s ROSTON ED15DN COMPANY 500 BOYLSTON ETREET BDSTON, M ABBACHUE ETTs 0219 9 WILLIAM D. HARRINGTON g.g............

September 24, 1985 8ECo 85-172 Mr. Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C. 20555 License DPR-35 Docket 50-293

References:

(a) Boston Edison Company letter (W. D. Harrington) to NRC (D. B. Vassallo) dated April 17,.1985 (b) Boston Edison Company letter (J. E. Howard) to NRC (T. A. Ippolito) dated October 15, 1981

Dear Str:

In Reference (a) Boston Edison Company submitted revised Pilgrim Station proposed technical specifications which affected the implementation of our Inservice Inspection Program and snubber testing requirements.

In discussions with your staff on this proposed change we were made aware that minor related changes should be made to page 224 of the Pilgrim Station Technical Specifications. Accordingly, Section 6.10.8.5 on page 224 has been revised to be in conformance with our proposed change. The references to Tables 3.6.I(a) and 3.6.I(b) have been changed to reference the PNPS procedures. A revised page 224 is enclosed for your review and should be incorporated with our Reference (a) proposal.

During the preparation of this proposed change it was discovered that page 151b had not been deleted as previously requested in Reference (b). He believe this to be an oversight on your part in the issuance of Amendment Number 60 to the Pilgrim Station Technical Specifications and request that page 151b be deleted from the Technical Specifications when you issue the amendment to our Reference (a) proposal.

i 8509300319 850924 PDR ADOCK 05000293 A

4,,

1 l

BOSTON EDISON COMPANY September 24, 1985 Page 2 In all other aspects the Reference (a) prcposed technical specifications remain unchanged. Should you have any questions concerning this submittal, please do not hesitate to contact us.

Very truly yours, Attachment W."'G 3 ilgned origirals and 37 copies Commonwealth of Massachusetts)

County of Suffolk )

Then personally appeared before me W. D. Harrington, who, being duly sworn, did state that he is Senior Vice President - Nuclear of the Boston Edison Company, the applicant herein, and that he is duly authorized to execute and file the submittal contained herein in the name and on behalf of the Boston Edison Company and that the statements in said submittal are true to the best of his knowledge and belief.

My Commt ssion expires: 0,,CM.2b /969 9 VIJ E(

Notary Public AL)