Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000324/1985004 + (14:29:53, 12 December 2024)
- ML20132G190 + (14:29:53, 12 December 2024)
- ML20132G188 + (14:29:54, 12 December 2024)
- U-600252, Final Deficiency Rept 55-84-18 Re Yield & Tensile Strength of ASTM-A-36 Plate Matl Less than Required by Matl Spec. Initially Reported on 840803.Item Not Reportable Per 10CFR50.55(e) + (14:29:55, 12 December 2024)
- 05000368/LER-1985-012, :on 850617,core Operating Limits Supervisory Sys (COLSS) Declared Inoperable Due to Error in Calculation of DNBR Power Operating Limit.Caused by Input Error During Cycle 5 COLSS Update.Coding Error Corrected + (14:30:00, 12 December 2024)
- IR 05000338/1985003 + (14:30:01, 12 December 2024)
- ML20132G183 + (14:30:01, 12 December 2024)
- DD-96-16, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision DD-96-16 Expired.Decision Became Final Agency Action on 961125. W/Certificate of Svc.Served on 961218 + (14:30:02, 12 December 2024)
- ML20132G181 + (14:30:05, 12 December 2024)
- ML20132G178 + (14:30:06, 12 December 2024)
- ML20132G177 + (14:30:07, 12 December 2024)
- ML20132G173 + (14:30:11, 12 December 2024)
- 05000278/LER-1985-011-01, :on 850621,fire Watch Not Established for Degraded Fire Barrier.Caused by Design Drawing & Personnel Errors.Fire Watch Established & Penetration Seal Drawings Corrected.Penetrations Will Be Sealed + (14:30:13, 12 December 2024)
- IR 05000413/1985005 + (14:30:14, 12 December 2024)
- ML20132G168 + (14:30:15, 12 December 2024)
- ML20132G165 + (14:30:16, 12 December 2024)
- ML20132G166 + (14:30:16, 12 December 2024)
- ML20132G161 + (14:30:17, 12 December 2024)
- U-600180, Interim Deficiency Rept 55-84-18 Re ASTM A-36 Plate Matl. Addl Info Re Safety Significance Identified.Approx 30 Addl Days Necessary to Complete Review & Provide Final Rept + (14:30:18, 12 December 2024)
- ML20132G154 + (14:30:19, 12 December 2024)
- 05000369/LER-1985-022-01, :on 850623,unplanned ESF Actuation Occurred on Loss of Both Main Feed Pumps Signal.Caused by Voltage Transient When Trend Chart Recorder Reinserted.Recorder Will Be Replaced + (14:30:25, 12 December 2024)
- IR 05000324/1985001 + (14:30:26, 12 December 2024)
- ML20132G147 + (14:30:27, 12 December 2024)
- 2CAN088504, Monthly Operating Rept for Jul 1985 + (14:30:28, 12 December 2024)
- ML20132G143 + (14:30:29, 12 December 2024)
- RBG-21421, Final Deficiency Rept DR-296 Re Linear Indications in Areas of Longitudinal Weld Seams of Structural Tubing.Tube Steel Will Perform Intended Safety Function.Condition Not Reportable Per 10CFR50.55(e) + (14:30:30, 12 December 2024)
- ML20132G137 + (14:30:31, 12 December 2024)
- ML20132G136 + (14:30:31, 12 December 2024)
- 05000259/LER-1985-027, :on 850620,design Evaluation Indicated Deficiency Re Inadequate Seismic Design of Reactor Bldg Crane.Mod Planned for Completion by 851031 to Replace Crane Rail Clamps W/Larger Size + (14:30:33, 12 December 2024)
- ML20132G134 + (14:30:34, 12 December 2024)
- ML20132G133 + (14:30:35, 12 December 2024)
- 1CAN088503, Monthly Operating Rept for Jul 1985 + (14:30:36, 12 December 2024)
- ML20132G129 + (14:30:36, 12 December 2024)
- ML20132G126 + (14:30:37, 12 December 2024)
- IR 05000338/1984019 + (14:30:38, 12 December 2024)
- ML20132G125 + (14:30:38, 12 December 2024)
- L-85-313, Monthly Operating Repts for Jul 1985 + (14:30:39, 12 December 2024)
- ML20132G121 + (14:30:40, 12 December 2024)
- ML20132G116 + (14:30:41, 12 December 2024)
- ML20132G118 + (14:30:41, 12 December 2024)
- ML20132G114 + (14:30:42, 12 December 2024)
- ML20132G110 + (14:30:43, 12 December 2024)
- U-600222, Final Deficiency Rept 55-85-03 Re Firewalls Constructed w/8-inch Hollow Core Concrete Masonry Units That May Not Meet 3 H Fire Resistance Rating.Initially Reported on 850404.Item Not Reportable Per 10CFR50.55(e) + (14:30:46, 12 December 2024)
- ML20132G104 + (14:30:47, 12 December 2024)
- ML20132G097 + (14:30:48, 12 December 2024)
- ML20132G095 + (14:30:49, 12 December 2024)
- PY-CEI-NRR-0349, Responds to 850529 Comments Re Proposed Resolution of TMI Action Plan Item III.D.1.1.Reactor Water Cleanup Sys Provided W/Connections to post-accident Sampling Sys for Monitoring Cleanup Operations + (14:30:50, 12 December 2024)
- ML20132G092 + (14:30:50, 12 December 2024)
- ML20132G091 + (14:30:51, 12 December 2024)
- ML20132G088 + (14:30:52, 12 December 2024)
- ML20132G086 + (14:30:52, 12 December 2024)
- ML20132G080 + (14:30:53, 12 December 2024)