ML20132G133
| ML20132G133 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 06/30/1985 |
| From: | Lempges T, Roman T NIAGARA MOHAWK POWER CORP. |
| To: | NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| NUDOCS 8507190165 | |
| Download: ML20132G133 (5) | |
Text
-
NIAGARA N0llAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE i-J The station operated during the month of June 1985 with a Unit
, Availability Factor of 100.0t, and a Net Design Electrical Capacity Factor of 94.0%.
There were 0 challenges to Electromatic Relief Valves. Reductions in Capacity Factor were due to Control Rod Sequence Exchange, Turbine Control Valve Oscillation, and rise in lake temperature.
CLASS I WORK - NECllANICAL MAINTENANCE - JUNE 1985 WR# 33317 Cleaned #11 CRD filter WR# 26695 Misc. Supports - tightened bolts Wil# 3333
- 12 RBCLC pump - tightened oil plugs readjusted oilers i
- 11 FW booster pump - repaired oil leak CIASS I WORK - ELECTRICAL MAINTENANCE - JUNE 1985 No Class I, Safety Related, Corrective Maintenance performed this month.
CIASS I WORK - INSTRUMENTATION 6 CONTROL - JUNE 1985 WR# 33047 Main Steam line #11 monitor trip point reading low.
(Readjusted trip point for 3000mR/ilr.)
WR# 32200 Rosemount Master Trip Unit card K1 Relay not functioning.
(Replaced Relay) 1-i i
4sA PDR ADOCK 0,000220 R
-F OPERATING DATA REPORT 50-220 DOCKET NO.
DATE 7/6/85 COMPLETED BY TW Roman TELEPHONE (315)346242.
OPERATING STATUS
- 1. Unit Name:
Nine blile Point Unit #1 Notes
- 2. Reporting Period:
6/01/85 thru 6/30/85 1850
- 3. Licensed Thennal Power (MWt):
640
- 4. Nameplate Rating (Gross MWe):
630
- 5. Design Electrical Ratin.' ' Net MWe):
620
- 6. Maximum Dependable Ca. city (Gross MWe):
610
- 7. Maximum Dependable Ca scity (Net MWe):
- 8. If Changes Occur in Capac ty Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr..to-Date Cumulatise 720 4343 138,408.2 i1. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 720 4313.1 97,028.8
- 13. Reactor Reserve Shutdown Hours 0
0 1,204.2
- 14. Hours Generator On-Line 720 4298.3 94,103.6
- 15. Unit Reserve Shutdown Hours 0
0 20.4
- 16. Gross Thermal Energy Generated (MWH) 1,294,173.0 7,755,376.0 157,044,826.0
- 17. Gross Electrical Energy Generated (MWH) 432,669.,0,
-2,b30,122.0 52,010,910.0
- 18. Net Electrical Energy Generated (MWH).
419,778.0 2,552,666.0 50,382,660.0
- 19. Unit Service Factor 100,0 99.3 70.1 100.0 99.0 68.0
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 95.6 96.4 59.7
- 22. Unit Capacity Factor (Using DER Net) 94.0 94.8 58.7
- 23. Unit Forced Outage Rate
- 0. 0 -
1.0 15.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each t:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY
. INITIA L ELECTRICITY COMMERCIAL OPERATION
' e)/77)
AVER \\GE Drgty UNIT POh ER LEVEL 50-220 DOCKETNO.
UNIT 9 Mile pt. ni 7/8/85 DATE g
d CO\\fPLETED ny TW Roman TELEPflONE f 31 tn 349_z 97 Junc 1985 MONTif DAY AVERACE D AILY POWER LEVEL, DAY AVERACE DAILY POWER LEVEL IMWe-Net)
(MWe Net) 602 514 37 2
604 IS 523 3
- 602, 19 594 603 4
20 596 5
605 599 21 6
603 595 yy 606 7
23 595 8
603 596 2.s 9
604 25 597 10 601 26 596 11 600 27 596 12 601 2S 599 13 599 596 29 14 591 597 30 15 394' 31 is 482 INSTRUCTIONS l
i" '.Tli""f2" ";' :;?" d>>>""" P-imi " Mw. set r.,, mi, e,ne n,,,,,,..,,,,,,,,.,,,,,,. c,,,,,,,,,.,,,
t (9/77i
.b.
50-220 UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME 9 Mile Pt. *1 DATE 7/8/8S m
REFORT MONTH June 1985 COMPLETED BY TW Roman We.
TEl.EPHONE (T1ta uo 'i'V n.
E E
.! E 3
$ $5 Licensee
,E*
Cause & Corrective L.
Date
- i 5?
.E s E Event g'g e-T Action to g$ 5 5
}= 5 g Report a mO j'
Prevent Recurrence c5 85-09 6/15/85 S
33 11 Control Rod Sequence Exchange 85-10 6/16/85 F
67 A
Turbine Control Valve Oscillation 4
I 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions S: Schedulet!
A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Aufomatic Scram.
Event Repor (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F Administrative 5
G4)perational Error (Explain)
Exhibit 1 Same Source 19/77)
Il4)thes (Explain) f
.7,;
.d4 NMP-1259l' t
NIAGARA MOHAWK POWER CORPORATION NIAGARA MOHAWK 300 ERIE SOULEVARD. WEST SYRACUSE. N. Y. 3 3 202 c
Jutt) 8, 1985 Qirector Office of Inspection and Enforcement U.S. Nuclear Regulatort) Commission Wasitington, QC 20555 Attn:
Occument and Control Desk Ret Vocket No. 50-220
.OPR-63 Ocar Sir s.
SubnLtted herewith is the Report of Operating Statistics and shutdown for June 1985 for the Nine Mile Point Nuclear Station Unit N1.
I Also. included is ~a narrative report of Operating Experience for June 1985 Verij truly yours,
,y Thomas E. Lempges
-Vice President Nuclear Generation TEL/tg attacionents cca Director,.0f fice of ISE (10 copies) i
/
l t
-N--
^