p t THE CLEVELAND ELECTR P.O. BOX 5000 - CLEVELAND OHIO 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLOG. - 55 PUBLICSQUARE Serving The Best Location in the Nation MURfMY R. EDRMAN VICE PRESIDENT NUCMAR September 19, 1985 PY-CEI/OIE 0108 L Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Seismic Analysis of ESW Pumps Backwash Internals
[RDC 136(85)]
Dear Mr. Keppler:
This letter serves as the final report pursuant to 10CFR50.55(e) on the potential significant deficiency concerning the lack of seismic analysis on the backwash assembly internals for the Emergency Service Water (ESW) and ESW Screenwash pumps.
Mr. J. A. Grobe of your office was first notified on May 8, 1985, by Mr. T. A.
Boss of The Cleveland Electric Illuminating Company (CEI), that this situation was being evaluated per Deviation Analysis Report 240, and an interim report was submitted on June 6, 1985.
Description of Deficiency During our investigation for our response to IE Bulletin No. 83-07, "Apparently Fraudulent Products Sold by Ray Miller, Inc.",
it was discovered that the strainers utilized in our ESW and ESW Screenwash systems had been classified as non-active components and therefore the backwash assemblies had not been seismica]ly qualified.
The strainer shells have been designed and qualified to maintain pressure integrity.
The affected strainers are as follows:
11E" lO 851001047s 850919 PDR ADOCK 05000440 SEP 2 31 5 S
'Mr. Uccac G. Kappler Ssptember 19, 1985 PY-CEI/OIE 0108 L 24" ESW Pump Strainers:
IP45D002A 1P45D002B 2P45D002A 2P45D002B 8" ESW Discharge Strainers:
1P45D003 2P45D003 6" ESW Screenwash Pump OP49D003A Strainers:
OP49D003B Backwash of the strainers is required to be performed at eight (8) hour intervals during ESW operation.
Completion of Evaluation Our Architect / Engineer, Gilbert / Commonwealth, Inc., has completed the seismic stress and operability qualification for these strainers.
The strainers, as designed, are seismically qualified and therefore this condition does not represent a significant deficiency as defined by 10CFR50.55(e).
Please call if there are any questions.
Sincerel Murray R. Edelman Vice President Nuclear MRE:sab cc:
Mr. J. A. Grobe USNRC Site Office, SBB50 Mr. D.
E.
Keating USNRC Site Office, SBB50 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 U.S. Nuclear-Regulatory Commission Document Control Desk Washington, D.C.
20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339