Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132H029 + (14:22:06, 12 December 2024)
- ML20132H028 + (14:22:07, 12 December 2024)
- ML20132H027 + (14:22:08, 12 December 2024)
- ML20132H026 + (14:22:08, 12 December 2024)
- ML20132H024 + (14:22:09, 12 December 2024)
- ML20132H020 + (14:22:10, 12 December 2024)
- ML20132H022 + (14:22:10, 12 December 2024)
- ML20132H019 + (14:22:11, 12 December 2024)
- ML20132H018 + (14:22:12, 12 December 2024)
- NLS8500261, Revised Application for Expedited Amend to License DPR-46, Revising 850920 Tech Spec Changes Re Single Loop Operation. Revs Incorporate All Amends to OL Up to & Including Amend 93 Issued on 830603 + (14:22:12, 12 December 2024)
- ML20132H014 + (14:22:13, 12 December 2024)
- ML20132H015 + (14:22:13, 12 December 2024)
- ML20132H013 + (14:22:14, 12 December 2024)
- 0CAN078512, Responds to Re Proposed Rev to Emergency Plan & Procedures to Resolve Concern Over Timely Staffing of Emergency Operations Facility.Ie Support of Changes Understood + (14:22:15, 12 December 2024)
- ML20132H010 + (14:22:16, 12 December 2024)
- 05000416/LER-1985-025, :on 850625,during Return to Svc of Reactor Water Cleanup (RWCU) Temp Switch,Fuse Blew Causing Loss of Power to RWCU Containment Isolation Logic Relay.Caused by Jumper Shorting During Removal.Fuse Replaced + (14:22:19, 12 December 2024)
- JAFP-85-0617, Responds to NRC Re Violations Noted in Insp Rept 50-333/85-12.Corrective Actions:Alara Supervisor Counseled on ALARA Review Procedures & Personnel Reminded of Radiation Work Permit Requirements.Mr Key Control Procedure Developed + (14:22:20, 12 December 2024)
- IR 05000267/1985001 + (14:22:21, 12 December 2024)
- ML20132H002 + (14:22:22, 12 December 2024)
- ML20132H001 + (14:22:23, 12 December 2024)
- 05000312/LER-1985-017, :on 850906,leakage Flow Path Reported in Filtration Unit of Auxiliary Bldg a Ventilation Unit.Caused by Omission of Seal Plate During Mfg.Steel Plate Welded Over Bypass Opening + (14:22:24, 12 December 2024)
- ML20132G999 + (14:22:25, 12 December 2024)
- ML20132G998 + (14:22:26, 12 December 2024)
- ML20132G996 + (14:22:27, 12 December 2024)
- ML20132G997 + (14:22:27, 12 December 2024)
- ML20132G992 + (14:22:29, 12 December 2024)
- VPN-081-96, Forwards Rev 20 to PGE-8010, Portland General Electric Nuclear QA Program for Trojan Nuclear Plant. Rev Reflects Administrative & Corporate Organizational Changes Continue to Meet Requirements of 10CFR50,App B,As Described + (14:22:30, 12 December 2024)
- ML20132G982 + (14:22:32, 12 December 2024)
- ML20132G979 + (14:22:33, 12 December 2024)
- ML20132G978 + (14:22:34, 12 December 2024)
- RBG-21664, Provides Final Response to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. All Subj Seismically Designed Piping Sys Inspected to Verify Consistency W/Design Requirements & Differences Resolved + (14:22:34, 12 December 2024)
- ML20132G972 + (14:22:36, 12 December 2024)
- ML20132G969 + (14:22:36, 12 December 2024)
- IR 05000443/1985017 + (14:22:38, 12 December 2024)
- ML20132G967 + (14:22:38, 12 December 2024)
- ML20132G964 + (14:22:41, 12 December 2024)
- ML20132G960 + (14:22:42, 12 December 2024)
- ML20132G962 + (14:22:42, 12 December 2024)
- ML20132G958 + (14:22:43, 12 December 2024)
- ML20132G957 + (14:22:43, 12 December 2024)
- 05000416/LER-1985-032, :on 850829,discovered That on 841201 & 04, Liquid Effluent Flow Rate Estimates Exceeded 4 H Frequency of Tech Specs Requirements.Caused by Late Flow Rate Measurements.Procedural Controls Revised + (14:22:46, 12 December 2024)
- ML20132G955 + (14:22:47, 12 December 2024)
- ML20132G954 + (14:22:47, 12 December 2024)
- 05000341/LER-1985-029, :on 850628,reactor Manually Scrammed in Response to Trip of Running CRD Pump.Caused by CRD Pump Trip Due to Low Suction Pressure Transient Occurring When Torus Water Mgt Sys Valve Opened + (14:22:50, 12 December 2024)
- ML20132G950 + (14:22:51, 12 December 2024)
- ML20132G947 + (14:22:52, 12 December 2024)
- ML20132G946 + (14:22:53, 12 December 2024)
- ML20132G945 + (14:22:54, 12 December 2024)
- ML20132G942 + (14:22:55, 12 December 2024)
- ML20132G939 + (14:22:56, 12 December 2024)
- ML20132G938 + (14:22:57, 12 December 2024)