ML20132G958

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in Insp Rept 50-322/85-04.Corrective Actions:Implementation of Station Mods85-071 & 85-134 Re post-accident Sampling & Monitoring Sys Will Be Accomplished by 851001 & 30,respectively
ML20132G958
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 10/01/1985
From: Leonard J
LONG ISLAND LIGHTING CO.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20132G948 List:
References
SNRC-1203, NUDOCS 8510020019
Download: ML20132G958 (6)


Text

.

g. e c %m mm

/gg'O LONG ISLAND LIGHTING COMPANY SHOREHAM NUCLEAR POWER STATION P.O. BOX 618. NORTH COUNTRY ROAD e WAOf NG RIVER. N.Y.11792 IolslC5 JOHN D. LEONARD, JR.

v6CE PRESIDENT NUCLE AR OPtR Afl0NS SNRC-1203 Dr. Thomas E. Murley, Regional Administrator Office of Inspection & Enforcement Region I U.

S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Inspection Report No. 50-322/85-04 Post Accident Sampling and Monitoring Systems Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322

Reference:

1.

Letter from T.T. Martin (HRC) to J.D.

Leonard (LILCO), dated July 31, 1985.

Transmitting clarifications and understandings of SNRC-ll86 and Inspection Report 85-04.

2.

Letter SNRC-ll86, dated June 27, 1985.

3.

Letter from T.

T.

Martin (NRC) to J.D.

Leonard (LILCO), dated June 5, 1985; transmitting Inspection Report No. 50-322/85-04

Dear Dr. Murley:

In response to the recent letter from Mr. T.T. Martin (NRC) to Mr.

J.D.

Leonard (LILCO), dated July 31, 1985, transmitting clarifications and understandings of SNRC-1186 and Inspection Report 85-04, we find the clarifications and understandings to be consistent with the discussions between our respective staffs.

Additionally we would like to submit the following Table I (Enclosure 1) which provides a status of Inspection Report 85-04 inspection items.

LILCO's scheduled completion date for several of these items have not been met due to recent SNPS Startup Test Program activity.

The'" Status" column of Table I denotes our best estimate of a recovery completion date.

8510020019 850925 PDR ADOCK 05000322 O

PDR

t SNRC-1203 Page 2 We trust this satisfies your requirements and if you should have need of additional information, please do not hesitate to contact this office.

l Very truly yours, C(l A

I h

Vi e President - Nucle r Operations BK/ ka nclosures cc:

J. A. Berry, Resident Inspector T. T. Martin, Director i

l l

i I

i

TABLE I SNRC-1203 Page 1 INSPECTION SUBMITTED ITEM NUMBER COMPLETION DATE STATUS 85-04-01A 08/13/85 Completed

-01B 08/13/85 "'

EPIP Completed and Review of Operations Committee (ROC) approved to become effective upon completion of modification Engineering of Station Modification 85-071 completed; implementation shall be accomplished by 10/01/85

-01C 08/13/85 Completed 85-04-02 No,t Given /. -

Station Modification 85-134 required for greater than 5%

( 7 eft,pos' power.

Engineering package was issued for plant modification on 08/26/85.

Estimated completion is 10-30-85~~

85-04-03 08/13/85 Completed 85-04-04 08/06/85 Completed 85-04-05A 08/13/85 Completed

-05B System Change Engineering of Station Modification 85-071 completed; by 08/06/85 implementation shall be accomplished by 10/01/85; EPIP Procedure Change completed and ROC approved to become effective upon by 08/13/85 completion of modification 85-04-06A 08/01/85 Completed

-06B 07/22/85 Completed

-06C Criteria & System-Completed Modification 07/18/85 08/13/85 EPIP for Approval 85-04-07A 08/01/85 Completed

-07B 07/22/85 Completed 85-04-08 08/01/85 On schedule /FSAR two year update

TABLE I SNRC-1203 Page 2

- INSPECTTON SUBMITTED ITEM NUMBER COMPLETION DATE STATUS l

85-04-09A 5 - 20% Power '

Long Term Item. See letter T.T. Martin (NRC) to J.D.

Leonard, Jr. (LILCO) dated July 31, 1985 Subject Inspection Report 85-04 Representative sampling Gamma Spectrometer.. Calibration complete j

i

-09B 08/13/85 Completed

-09C August 1, 1985 Engineering of Station Modification 85-149 completed; For D.O.P.

Release implementation shall be accomplished 10/18/85 85-04-10A 08/13/85 Completed

-10B 08/13/85 Completed l

-10C Not Given Completed

-10D Not Given Completed j

-10E 07/16/85 Completed 08/13/85 1

i

-10F 08/13/85 Completed I

l

-10G 08/13/85 Completed 1

-10H Not Given Completed (Answered) 4

-10I 08/13/85 Completed

-10J Not Given Completed I

-10K 08/13/85 Completed

-10L Not Given Completed / Periodical 1

l

-10M 08/13/85 Completed 1

-10N Not Given Item is being placed on the Required Reading List for I

Health Physics Technicians 4

4

~

TABLE I SNRC-1203 Page 3 INSPECTION SUBMITTED ITEM NUMBER COMPLETION DATE STATUS 85-04-11A 07/30/85 A revision to EPIP 2-7 wds R.O.C. approved on 08/27/85; associated, operating procedures to be R.O.C.

reviewed by 09/03/85.'

-11B Not Given Completed

-11C Not Given Proposed modification (FDOP 84-031) has been evaluated and software changes are being prepared.

85-04-12A 07/30/85 Completed

-12B Draft Report Completed 07/03/85 Final 08/13/85

-12C Not Given Completed 85-04-13 11/30/85 Environmental Qualification (EQ) Program On-going 85-04-14 Not Given Completed 85-04-15 Not Given Completed Completed- (& deferred) 85-04-16 See SNRC-1186 y

Enclosure; Pages 10 to 11 85-04-17 September 1985 Station Procedure Change Notice (in progress) 85-04-18 Not Given Completed 85-04-19A 1st Refueling Will be completed prior to start up after 1st Refueling j

Outage Outage

( 6 t' be ':

-19B July 30, 1985 Letter SNRC-1193 (Submitted 07/29/85) 85-04-20 08/23/85 Training in Procedure Changes

,. Training Rad.-Chem Technicians to take three weeks after completion of applicable station modifications and subsequent system return to service.

. _n.

Pzg] O 1

INSPECTION' SUBMITTED ITEM NUMBER COMPLETION DATE STATUS NOTE:.For procedure changes, " completed" signifies procedure has been revised, reviewed by~

R.O.C.

and recommended.for approval.

Actual implementation will occur at the appropriate time ti.e.: consistant with station modification completion where applicable.)

S

.