Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133C621 + (13:55:39, 12 December 2024)
- ML20133C617 + (13:55:40, 12 December 2024)
- ML20133C616 + (13:55:41, 12 December 2024)
- ML20133C612 + (13:55:42, 12 December 2024)
- ML20133C611 + (13:55:42, 12 December 2024)
- IR 05000324/1985030 + (13:55:43, 12 December 2024)
- ML20133C608 + (13:55:44, 12 December 2024)
- ML20133C605 + (13:55:45, 12 December 2024)
- ML20133C604 + (13:55:45, 12 December 2024)
- ML20133C602 + (13:55:46, 12 December 2024)
- ML20133C600 + (13:55:47, 12 December 2024)
- ML20133C595 + (13:55:50, 12 December 2024)
- ML20133C596 + (13:55:50, 12 December 2024)
- AECM-85-0265, Forwards Response to Item 3.2 of Generic Ltr 83-28 Re post-maint Testing of safety-related Components.Response for Item 4.5.3 Will Be Provided within 90 Days of NRC Issuance of Evaluation of BWR Owners Group Rept + (13:55:51, 12 December 2024)
- ML20133C592 + (13:55:52, 12 December 2024)
- ML20133C591 + (13:55:53, 12 December 2024)
- 05000336/LER-1996-038-02, :on 961202,inadequate Surveillance Procedure Used to Verify EDG Operability.Caused by Failure to Properly Incorporate TS SRs During Recent Revs of Monthly EDG Tests. Changed EDG Surveillance Procedures + (13:55:55, 12 December 2024)
- B11754, Requests Exemption from Requirements of 10CFR50,App J, Section D.2.b.ii.Proposed Surveillance Procedure 4.6.1.3.a Worded to Require Air Door Seal Leak Checks within 3 Days of Every Period of Air Lock Use + (13:55:56, 12 December 2024)
- ML20133C586 + (13:55:56, 12 December 2024)
- ML20133C585 + (13:55:57, 12 December 2024)
- 05000336/LER-1996-038, Forwards LER 96-038.Commitments Made Re LER Submitted + (13:55:58, 12 December 2024)
- ML20133C582 + (13:55:58, 12 December 2024)
- ML20133C580 + (13:55:59, 12 December 2024)
- ML20133C577 + (13:56:00, 12 December 2024)
- ML20133C579 + (13:56:00, 12 December 2024)
- ML20133C576 + (13:56:01, 12 December 2024)
- ML20133C575 + (13:56:02, 12 December 2024)
- ML20133C574 + (13:56:02, 12 December 2024)
- ML20133C573 + (13:56:03, 12 December 2024)
- 05000280/LER-1985-011, :on 850626,while Racking Charging Pump B Breaker 15J5 Out for Pump Maint,Normal Feeder Breaker 15H6 for Operating Charging Pump C Tripped Due to Electrical Interlock.Caused by Inadequate Precautions + (13:56:05, 12 December 2024)
- ML20133C569 + (13:56:06, 12 December 2024)
- ML20133C568 + (13:56:06, 12 December 2024)
- ML20133C567 + (13:56:08, 12 December 2024)
- ML20133C565 + (13:56:09, 12 December 2024)
- ML20133C564 + (13:56:09, 12 December 2024)
- ML20133C563 + (13:56:10, 12 December 2024)
- ML20133C562 + (13:56:11, 12 December 2024)
- ML20133C559 + (13:56:12, 12 December 2024)
- ML20133C557 + (13:56:12, 12 December 2024)
- ML20133C556 + (13:56:13, 12 December 2024)
- ML20133C554 + (13:56:14, 12 December 2024)
- 05000295/LER-1985-024-04, :on 850629,level in Steam Generator D Reached 25% Giving Automatic Reactor Trip in Anticipation of Loss of Heat Sink.Caused by Operator Error,Aggravated by Equipment Failure.Individual Counseled + (13:56:15, 12 December 2024)
- ML20133C552 + (13:56:16, 12 December 2024)
- IR 05000461/1985034 + (13:56:17, 12 December 2024)
- ML20133C545 + (13:56:18, 12 December 2024)
- ML20133C543 + (13:56:19, 12 December 2024)
- ML20133C542 + (13:56:20, 12 December 2024)
- IR 05000373/1985017 + (13:56:38, 12 December 2024)
- ML20133C540 + (13:56:39, 12 December 2024)
- 05000354/LER-1996-027-01, :on 961202,ESF Actuation & Unplanned Automatic Start of Safety Auxiliaries Cooling Sys Pump a Occurred Due to Personnel Error.Nco Involved in Event Counseled + (13:56:41, 12 December 2024)
- ML20133C538 + (13:56:42, 12 December 2024)
- ML20133C536 + (13:56:44, 12 December 2024)