Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133D748 + (13:45:41, 12 December 2024)
- 05000382/LER-1985-030, :on 850630,ESF Portion of Control Room Ventilation Sys Actuated Due to Electrical Spike in Control Room Air Intake Radiation Monitors.Caused by Portable Radio Transmitters Used Near Radiation Monitors + (13:45:43, 12 December 2024)
- ML20133D745 + (13:45:44, 12 December 2024)
- ML20133D743 + (13:45:45, 12 December 2024)
- ML20133D739 + (13:45:46, 12 December 2024)
- ML20133D738 + (13:45:47, 12 December 2024)
- ML20133D736 + (13:45:47, 12 December 2024)
- ML20133D732 + (13:45:48, 12 December 2024)
- 05000382/LER-1985-029, :on 850630,reactor Trip Occurred Due to High Water Level in Steam Generator 2.Caused by Valve Positioners for Main Feedwater Regulating Valves Out of Adjustment. Positioners Adjusted + (13:45:50, 12 December 2024)
- ML20133D729 + (13:45:51, 12 December 2024)
- ML20133D723 + (13:45:52, 12 December 2024)
- ML20133D722 + (13:45:53, 12 December 2024)
- ML20133D721 + (13:45:53, 12 December 2024)
- U-600202, Final Potentially Reportable Deficiency Rept 55-84-01 Re Control of Field Design Changes.Initially Reported on 840111.Investigation Identified No Hardware Deficiencies. Issues Not Reportable Per 10CFR50.55(e) + (13:45:54, 12 December 2024)
- ML20133D719 + (13:45:55, 12 December 2024)
- ML20133D717 + (13:45:56, 12 December 2024)
- ML20133D718 + (13:45:56, 12 December 2024)
- ML20133D715 + (13:45:57, 12 December 2024)
- ML20133D714 + (13:45:57, 12 December 2024)
- ML20133D712 + (13:45:58, 12 December 2024)
- 05000373/LER-1985-049-01, :on 850625,chlorine Detector Actuation Occurred Resulting in ESF Damper Operations to Isolate Vital Control Areas of Plant from Outside Air.Caused by Debris in Glass Orifice of Chlorine Detector for Vc/Ve Train B + (13:46:00, 12 December 2024)
- ML20133D708 + (13:46:01, 12 December 2024)
- ML20133D704 + (13:46:02, 12 December 2024)
- ML20133D706 + (13:46:02, 12 December 2024)
- IR 05000440/1985041 + (13:46:03, 12 December 2024)
- ML20133D700 + (13:46:04, 12 December 2024)
- ML20133D698 + (13:46:05, 12 December 2024)
- ML20133D696 + (13:46:05, 12 December 2024)
- IR 05000219/1996011 + (13:46:14, 12 December 2024)
- ML20133D692 + (13:46:14, 12 December 2024)
- ML20133D688 + (13:46:15, 12 December 2024)
- ML20133D687 + (13:46:16, 12 December 2024)
- ML20133D685 + (13:46:16, 12 December 2024)
- 05000327/LER-1983-093-03, /03L-1:on 830706,condenser Vacuum Flow Rate Monitor 2-FT-2-257 Declared Inoperable Due to Loss of Readings.Caused by Condensation in Sense Lines at Flow Element.Annubar Flow Element Will Be Replaced + (13:46:18, 12 December 2024)
- ML20133D678 + (13:46:19, 12 December 2024)
- ML20133D679 + (13:46:19, 12 December 2024)
- ST-HL-AE-1375, First Interim Deficiency Rept Re Document Control Ctr Personnel Checking Uncontrolled Bechtel Std Computer Programs Manual in Violation of Procedures.Initially Reported on 850905.Next Rept Will Be Submitted by 851220 + (13:46:20, 12 December 2024)
- ML20133D666 + (13:46:21, 12 December 2024)
- ML20133D665 + (13:46:22, 12 December 2024)
- LD-85-035, Application for Amend to CESSAR Final Design Approval Closing Issues Listed in Encl a Re Final Design Approval 2 & Encl B Listing Correspondence Subsequent to Sser (NUREG-0852).Fee Paid + (13:46:23, 12 December 2024)
- ML20133D661 + (13:46:23, 12 December 2024)
- PLA-2504, Provides Final Response to IE Bulletin 83-03.Insps of Check Valves Planned for Unit 1 Refueling Outages.Initial Valve Insps Determined One Valve to Be Partially Disassembled. Valve Reassembled & Disc Nut Pin Properly Peened + (13:46:24, 12 December 2024)
- ML20133D657 + (13:46:26, 12 December 2024)
- 05000374/LER-1985-032-02, :on 850701,leak Detection Temp Sensors Determined to Render Div I & II Ld Isolation Sys for Differential Temp Inoperable,As Identified on 850524.Sensors Relocated to Proper Position + (13:46:27, 12 December 2024)
- ML20133D652 + (13:46:29, 12 December 2024)
- ML20133D642 + (13:46:31, 12 December 2024)
- ML20133D641 + (13:46:32, 12 December 2024)
- ST-HL-AE-1297, Forwards Response to Action Item 24, Testing of P-4 Interlock, Identified During 850326-29 Meetings W/Nrc to Discuss Issues & Questions Re Instrumentation & Controls Design Features & Program Implementation + (13:46:33, 12 December 2024)
- ML20133D637 + (13:46:33, 12 December 2024)
- ML20133D632 + (13:46:35, 12 December 2024)
- ML20133D630 + (13:46:36, 12 December 2024)