January 2, 1997
Mr. Michael B. Roche
Vice President and Director
GPU Nuclear, Incorporated
Oyster Creek Nuclear Generating Station
P.O. Box 388
Forked River, New Jersey 08731
SUBJECT:
NRC INSPECTION REPORT NO. 50-219/96-11 AND NOTICE OF VIOLATION
Dear Mr. Roche:
i
On December 1,1996, the NRC completed an integrated inspection at your Oyster Creek
i
reactor facility. The enclosed report presents the results of that inspection.
l
During the six-week period covered by this inspection period, the conduct of activities at
the Oyster Creek facility was generally characterized by safety-conscious operations,
sound engineering and maintenance practices, and careful radiological work controls.
However, a violation of NRC requirements occurred concerning the failure to conduct a
)
written 10 CFR 50.59 safety evaluation. This violation is similar to one issued in NRC
i
Inspection Report 50-219/96-09. It is important that you emphasize to your staff that
changes to equipment or its operation as described in the UFSAR requires a written 10 CFR 50.59 safety evaluation, and that a thorough review of all applicable design basis
documents is necessary to that end.
The violation cited in the enclosed Notice of Violation (Notice), and the circumstances
surrounding the violations are described in detail in the enclosed report. Please note that
you are not required to respond to this letter because your response to the similar recent
violation documented in Inspection Report 50-219/96-09 should address this violation. If,
however, you feel additional information or perspective on the details surrounding the
violation is relevant, please respond as specified in the enclosed Notice within 30 days of
j
the receipt date of this letter.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosures will be placed in the NRC Public Document Room (PDR).
1
if '- e I
l
9701100028 970102
ADOCK 05000219
/
G
.
.
..
l
Mr. Michael B. Roche
2
We appreciate your cooperation.
Sincerely,
Original Signed By:
Peter W. Eselgroth, Chief
Projects Branch 7
Division of Reactor Projects
Docket / License:
50-219/DPR-16
72-1004
i
Enclosures:
1.
i
2.
NRC Inspection Report No. 50-219/96-11
cc w/encls:
G. Busch, Manager, Site Licensing, Oyster Creek
,
M. Laggart, Manager, Corporate Licensing
State of New Jersey
._. . - _ . -
_
.. _--
-
.
- ._ _
___
,D
E
r
i
Mr. Michael B. Roche
3
!
Distribution w/encls:
l
Region i Docket Room (with concurrences)
P. Eselgroth, DRP
B. Welling, DRP
l
l
NRC Resident inspector
Nuclear Safety Information Center (NSIC)
D. Screnci, PAO
'
PUBLIC
Distribution w/encls (VIA E-MAIL):
'
W. Dean, OEDO
J. Stolz, NRR/PD l-2
R. Eaton, NRR/PD 1-2
P. McKee, NRR/PD 1-3
Inspection Program Branch, NRR (IPAS)
DOCUMENT NAME: G:\\ BRANCH 7\\OC\\96-11.OC
To receive a copy of this document, Indicate in the boa: "C" = Copy without attachment / enclosure
"E" = Copy with attachment / enclosure
- N" = No copy
j
of F ICL
Hl/DRP,
,
l
l Hl/DHP Af
l@
l
)
l
l
NAML
tirigg4 QA
E selgreyg,
!
DAIL
12/31/96
/Qj/g
i
OF FICIAL HECOHD COPY
!
!